| 1.1 |
Date updated: |
Nov 17, 2025 |
| 1.2 |
Vessel's name (IMO number): |
Ardmore Persistence (9732929) |
| 1.2b |
Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization |
Yes, |
| 1.3 |
Vessel's previous name(s) and date(s) of change: |
CL HUAIYANG (Aug 20, 2025) MAERSK TRENTON (Nov 18, 2021) |
| 1.4 |
Date delivered / Builder (where built): |
Jan 04, 2017 / Sungdong ship building and marine eng, S.Korea |
| 1.5 |
Flag / Port of Registry: |
Marshall Islands / Majuro |
| 1.6 |
Call sign / MMSI: |
V7A4483 / 538009231 |
| 1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: +1 646 817 3672 - 73 |
| Fax: |
| Email: ardmorepersistence@aesmvsl.com |
| 1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
Other (Product carrier) |
| 1.8a |
If other type of vessel, please specify: |
Product Carrier |
| 1.9 |
Type of hull: |
Double Hull |
| 1.10 |
Registered owner - Full style: IMO Number |
BALLYDUFF SHIPCO LLC Trust Company Complex,
Ajeltake Road, Ajeltake Island, Majuro MH96960,Marshall Islands Ireland Tel: +353212409500 Fax: +353 212409501 Telex: Not Applicable Email: marine@ardmoreshipping.com Web: www.ardmoreshipping.com IMO: 0290877 |
| 1.11 |
Technical operator - Full style: |
Anglo Ardmore Ship Management Pte. Ltd. 1 Pasir Panjang Road,
#13-01 Labrador Tower,
Singapore 118479
Singapore
Singapore Tel: +65 6224 3119 Fax: +65 6224 3995 Telex: NA Email: vetting@angloardmore.com Company IMO#: 0165517 |
| 1.12 |
Commercial operator - Full style: |
Ardmore Maritime Services (Asia) Pte Ltd 137 Telok Ayer Street
#08-01
Singapore Tel: +353 21 240 9500 Fax: +353212409512 Telex: NA Email: commercialoperations@ardmoreshipping.com Web: www.ardmoreshipping.com |
| 1.13 |
Disponent owner - Full style: |
Ardmore MR Pool LLC Trust Company Complex Ajeltake Road Ajeltake Island Majuro
Marshall Islands MH 969690 Tel: +65-63299400 Fax: NA Email: commercialoperations@ardmoreshipping.com Web: www.ardmoreshipping.com |
| 1.14 |
P & I Club - Full Style: |
Other (Specify) The Managers
Thomas Miller P&I Ltd.
90 Fenchurch Street
London
EC3M 4ST
Tel: +44 (0)20 7283 4646 Fax: +44 (0)20 7621 9761 Telex: NA Email: underwriting.ukclub@thomasmiller.com Web: www.ukpandi.com |
| 1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2026 |
| 1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Amwins Global Risks 22 Bishopsgate
London
EC2N 4BQ
UNITED KINGDOM
Tel: +44 20 7469 0100 |
| 1.17 |
Hull & Machinery insured value / expiration date: |
US$ (Contact Owners for details) |
|
| 1.18 |
Classification society: |
American Bureau of Shipping |
| 1.18a |
Is Classification Society an IACS member? |
Yes |
| 1.19 |
Class notation: |
+A1, Chemical Carrier, Oil Carrier, ESP, E, +AMS, +ACCU, CPS, CSR, AB-CM, BWE, BWT, IHM, NBLES, PMP+, RW, TCM, UWILD |
| 1.20 |
Does the vessel have any open conditions of Class?? If yes List all open conditions: |
No
| Open Conditions of Class | Due Date |
|---|
|
| 1.20a |
Does the vessel have any Memoranda of Class? If yes, list details: |
No
|
| 1.21 |
If classification society changed, name of previous and date of change: |
, Not Applicable |
| 1.22 |
Does the vessel have ice class? If yes, state what level: |
No, NA |
| 1.23 |
Date / place of last dry-dock: |
Nov 18, 2021 / Besiktas, Turkey |
| 1.24 |
Date next dry dock due / next annual survey due: |
Jan 03, 2027 |
Jan 03, 2026 |
| 1.25 |
Date of last special survey / next special survey due: |
Nov 18, 2021 |
Jan 03, 2027 |
| 1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, |
| 1.27 |
Length overall (LOA): |
183.00 m |
| 1.28 |
Length between perpendiculars (LBP): |
174.00 m |
| 1.29 |
Extreme breadth (Beam): |
32.22 m |
| 1.30 |
Moulded depth: |
19.10 m |
| 1.31 |
Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: |
48.37 m |
m (NA) |
| 1.32 |
Distance bridge front to center of manifold: |
56.73 m |
| 1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
92.07 m |
90.93 m |
| 1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
| Forward to mid-point manifold: |
33.36 m |
37.51 m |
37.66 m |
| Aft to mid-point manifold: |
14.82 m |
37.20 m |
49.16 m |
| Parallel body length: |
48.20 m |
74.71 m |
86.827 m |
| 1.35 |
Net Tonnage: |
13,786.00 |
| 1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
29,455.00 |
22,753 |
| 1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
31,113.07 |
27,280.73 |
| 1.38 |
Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): |
Yes, 24,472.14 |
| 1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
| Summer: |
5.813 m |
13.316 m |
49,687.90 MT |
60,492.60 MT |
| Winter: |
6.09 m |
13.039 m |
48,241.50 MT |
59,046.20 MT |
| Tropical: |
5.536 m |
13.593 m |
51,138 MT |
61,942.70 MT |
| Normal loaded condition: |
m |
m |
MT |
MT |
| Lightship: |
16.25 m |
2.88 m |
Not Applicable |
10,804.70 MT |
| Normal Ballast Condition: |
11.10 m |
8.03 m |
19,944.00 MT |
30,749.00 MT |
| Segregated Ballast Condition: |
11.10 m |
8.03 m |
19,944.00 MT |
30,749.00 MT |
| 1.40 |
FWA/TPC at summer draft: |
289 mm |
52.30 MT |
| 1.41 |
Have multiple deadweights been assigned? If yes, list all assigned deadweights: |
Yes Assigned DWT 1: 39,998.40 Assigned DWT 2: 44,995.20 Assigned DWT 3: 49,687.90 Assigned DWT 4: Assigned DWT 5: |
| 1.42 |
Constant (excluding fresh water): |
300 MT |
| 1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
After making allowance for factors like squat, swell, change of water density, list, heel and prevailing weather conditions including other variables such as allowance due to, siltation and reduced depths over pipelines and Ice accretion.:
A. While Underway:
1.Pilotage waters, Channels, Fairways, Rivers.: 10% of static draft.
2.Coastal Waters when transiting at distance less than 25NM from coastline : 20% of Max Static Draft.
3.Open Waters When transiting more than or equal to 25 NM from coastline: 50% of static draft.
B. While In Port
1. Alongside / Engaged in mooring or un-mooring.: 1.5% of Vessel's Extreme Breadth or 0.3m, whichever is greater.
2. CBM, SBM : not less than 20% of vessels static draft.
3a.At Anchor Unprotected Waters : 20 % of vessels static draft.
3b.At Anchor Protected/ Sheltered Waters : 10 % of vessels static draft.
*** If Local requirements (charterers, port, canal authorities) have rules that are stricter than the
1.above criteria then adhere to such higher UKC allowances.
|
| 1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
| Summer deadweight: |
35.054 m |
0 m |
| Normal ballast: |
40.78 m |
0 m |
| Lightship: |
45.49 m |
0 m |
| |
| 2.1 |
Safety Equipment Certificate (SEC): |
Sep 08, 2025 |
Not Applicable |
Not Applicable |
Jan 03, 2027 |
| 2.2 |
Safety Radio Certificate (SRC): |
Aug 24, 2025 |
Not Applicable |
Not Applicable |
Jan 03, 2027 |
| 2.3 |
Safety Construction Certificate (SCC): |
Aug 24, 2025 |
Not Applicable |
Not Applicable |
Jan 03, 2027 |
| 2.4 |
International Loadline Certificate (ILC): |
Aug 24, 2025 |
|
|
Jan 03, 2027 |
| 2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Sep 25, 2025 |
Not Applicable |
Not Applicable |
Jan 03, 2027 |
| 2.6 |
International Ship Security Certificate (ISSC): |
Aug 24, 2025 |
Not Applicable |
Not Applicable |
Feb 23, 2026 |
| 2.7 |
Maritime Labour Certificate (MLC): |
Aug 24, 2025 |
Not Applicable |
Not Applicable |
Feb 23, 2026 |
| 2.8 |
Minimum Safe Manning Certificate (MSM): |
Aug 20, 2025 |
Not Applicable |
Not Applicable |
Not Applicable |
| 2.9 |
ISM Safety Management Certificate (SMC): |
Aug 24, 2025 |
Not Applicable |
Not Applicable |
Feb 23, 2026 |
| 2.10 |
Document of Compliance (DOC): |
Mar 11, 2025 |
Sep 05, 2025 |
Not Applicable |
Oct 23, 2026 |
| 2.11 |
USCG Certificate of Compliance (USCGCOC): |
Jul 13, 2025 |
Not Applicable |
Not Applicable |
Jul 13, 2027 |
| 2.12 |
Civil Liability Convention (CLC) 1992 Certificate: |
Aug 20, 2025 |
Not Applicable |
Not Applicable |
Feb 20, 2026 |
| 2.13 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Aug 20, 2025 |
Not Applicable |
Not Applicable |
Feb 20, 2026 |
| 2.14 |
Liability for the Removal of Wrecks Certificate (WRC): |
Aug 21, 2025 |
Not Applicable |
Not Applicable |
Feb 20, 2026 |
| 2.15 |
U.S. Certificate of Financial Responsibility (COFR): |
Aug 23, 2025 |
Not Applicable |
Not Applicable |
Aug 23, 2028 |
| 2.16 |
Certificate of Class (COC): |
Aug 24, 2025 |
Not Applicable |
Not Applicable |
Jan 03, 2027 |
| 2.17 |
Certificate of Registry (COR): |
Aug 20, 2025 |
Not Applicable |
Not Applicable |
Feb 19, 2026 |
| 2.18 |
International Sewage Pollution Prevention Certificate (ISPPC) |
Aug 24, 2025 |
Not Applicable |
Not Applicable |
Jan 03, 2027 |
| 2.19 |
Certificate of Fitness (COF): |
N/A |
N/A |
N/A |
N/A |
| 2.20 |
International Energy Efficiency Certificate (IEEC): |
Aug 24, 2025 |
Not Applicable |
Not Applicable |
Not Applicable |
| 2.21 |
International Air Pollution Prevention Certificate (IAPPC): |
Aug 24, 2025 |
Not Applicable |
Not Applicable |
Jan 03, 2027 |
| 2.22 |
Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): |
Oct 20, 2025 |
Not Applicable |
Not Applicable |
Apr 20, 2026 |
| 2.23 |
Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: |
Yes, |
| 2.24 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
| 2.25 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
| 2.26 |
Is the ITF Special Agreement on board (if applicable)? |
Yes |
| 2.27 |
ITF Blue Card expiry date (if applicable): |
Aug 20, 2027 |
| |
| 3.1 |
Nationality of Master: |
Indian |
| 3.2 |
Number and nationality of Officers: |
9 |
Indian |
| 3.3 |
Number and nationality of Crew: |
| Nationality | Count |
|---|
| India | 12 |
|
| 3.4 |
What is the common working language onboard: |
English |
| 3.5 |
Do officers speak and understand English? |
Yes |
| 3.6 |
If Officers/ratings employed by a Manning Agency - Full style: |
Officers:
| Company Name | Address | Phone | Fax | Email |
|---|
| Anglo Ardmore ShipManagement Pte. Ltd. | 1 Pasir Panjang Road, #13-01 Labrador Tower, Singa | +65 6224 3119 | | operations@angloardmore.com |
Ratings:
| Company Name | Address | Phone | Fax | Email |
|---|
| Anglo Ardmore ShipManagement Pte. Ltd. | 1 Pasir Panjang Road, #13-01 Labrador Tower, Singa | +65 6224 3119 | | operations@angloardmore.com |
|
| |
| 4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
Yes |
| 4.2 |
Qualified individual (QI) - Full style: |
O'Brien's Oil Pollution Service O'Brien's Response Management
818 Town and Country Blvd., Suite 200
Houston, TX 77024, USA
Tel: +1-281-606-4854 Fax: +1-985-781-0580 Telex: NA Email: commandcenter@wittobriens.com Web: NA |
| 4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
National Response Corporation 3500 Sunrise Highway, Suite T-103
Great River, New York 11739 U.S.A. Tel: +1-631 224 9141 Fax: +1-631 224 9086 Telex: NA Email: iocdo@nrcc.com Web: www.nrcc.com |
| 4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
RESOLVE MARINE GROUP INC. 1510 SE 17th Street, Suite 400
Fort Lauderdale, FL 33316
Tel: +1-954-764-8700 Fax: +1-954-764-8724 Email: opa90@resolvemarine.com Web: www.resolvemarine.com |
| |
| 5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes IMO Resolution A.741(18) |
| 5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
Yes |
| 5.2.1 |
If Yes, state whether winching or landing area provided: |
Winching |
| 5.2.2 |
If Yes, what is the diameter of the circle provided: |
5.00 m |
| |
| 6.1 |
Cargo tanks:
| Tank ID | Tank PSC | Tank Type | Constr | Coated Y/N | Coating Type | Extent | Condition | Date | Insp date | Insp Freq |
|---|
| 8 | C | Residual | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Oct 23, 2025 | Annual | | 1 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 2 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 3 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 4 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 5 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 6 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 7 | P | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 29, 2025 | Annual | | 1 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 2 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 3 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 4 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 5 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 6 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual | | 7 | S | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | 2016-10-04 | Aug 27, 2025 | Annual |
Anodes Fitted: No |
Ballast tanks:
| ID | Coated? | Type | Extent | Condition | Coating date | Insp date | Insp freq |
|---|
| 1P/S | Yes | Epoxy | Full Tank | Good | 2016-10-01 | Sep 15, 2025 | Annual | | 2P/S | Yes | Epoxy | Full Tank | Good | 2016-10-01 | Sep 12, 2025 | Annual | | 3P/S | Yes | Epoxy | Full Tank | Good | 2016-10-01 | Sep 13, 2025 | Annual | | 4P/S | Yes | Epoxy | Full Tank | Good | 2016-10-01 | Sep 13, 2025 | Annual | | 5P/S | Yes | Epoxy | Full Tank | Good | 2016-10-01 | Sep 15, 2025 | Annual | | 6P/S | Yes | Epoxy | Full Tank | Good | 2016-10-01 | Sep 14, 2025 | Annual | | Forepeak | Yes | Epoxy | Full Tank | Good | 2016-10-01 | Sep 12, 2025 | Annual | | Aft peak | Yes | Epoxy | Full Tank | Good | 2016-10-01 | Oct 10, 2025 | Annual |
Anodes Fitted: Yes |
| |
| 7.1 |
Ballast Handling Data
| Number | Type | Prime mover type | Capacity (m3/hr) | Head (bar) |
|---|
| 2 | Framo, Centrifugal | hydraulic | 800.00 | 30.00 | | 1 | Eductors | water | 100.00 | 10.00 |
|
| 7.2 |
Does the vessel comply with D1 or D2 performance standards? |
D2 |
| 7.3 |
Does the vessel have a Ballast Water Treatment System (BWTS) fitted? |
Yes |
| 7.4 |
What type of BWTS fitted? If other system fitted, please advise: |
Other (specify), Mechanical Separation, Dis-infection (Electrochlorination), Netralisation |
| 7.5 |
Name of manufacturer of BWTS: |
Samsung Heavy Industries Co., Ltd. |
| 7.6 |
Does the BWTS have IMO type approval? |
Yes |
| 7.7 |
Is the BWTS of a USCG approved type? |
Yes |
| |
| 8.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: |
Yes, Solid |
| 8.2 |
Cargo Tank Capacities at 98% Full - Centre:
Total Centre: m3
Cargo Tank Capacities at 98% Full - Wing:
| Tank Number | Capacity (m3) | P/S |
|---|
| 1 | 3161.50 | Port | | 1 | 3152.90 | Stbd | | 2 | 4518.30 | Port | | 2 | 4510.40 | Stbd | | 3 | 4736.30 | Port | | 3 | 4736.70 | Stbd | | 4 | 4733.50 | Port | | 4 | 4735.30 | Stbd | | 5 | 4688.30 | Port | | 5 | 4689.50 | Stbd | | 6 | 3758.40 | Port | | 6 | 3752.10 | Stbd | | Slop | 635.40 | Port | | Slop | 639.20 | Stbd |
Total Wing: 52,447.68 m3
Deck Tank Capacities at 98% Full:
Total Deck: m3
|
| 8.2a |
Grand Total Cubic Capacity (98%) (centre + wing tanks): |
52,447.68 m3 |
| 8.2.1 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
1P&S: 6314 CBM 2P&S: 9028 CBM 3P&S: 9473 CBM 4P&S: 9469 CBM 5P&S: 9378 CBM 6P&S: 7510 CBM |
| 8.2.2 |
IMO class (Oil/Chemical Ship Type 1, 2 or 3): |
IMO 2 |
| 8.3 |
Slop tank capacities (98%):
| Tank Number | Capacity (m3) | P/S |
|---|
| Slop P | 635.40 | Port | | Slop S | 639.20 | Stbd |
Total: 1,274.60 m3
|
| 8.3.1 |
Specify segregations which slops tanks belong to and their capacity with double valve: |
#7
Slop-P 635.4 CBM
Slop-S 639.2 CBM |
| 8.3.2 |
Residual/Retention oil tank(s) capacity (98%), if applicable: |
79 m3 |
| 8.3.3 |
What is total SBT capacity and percentage of SDWT vessel can maintain? |
N/A |
N/A |
| 8.3.4 |
Does vessel meet the requirements of MARPOL Annex I Reg 18.2: |
N/A |
| 8.4 |
How many grades/products can vessel load/discharge with double valve segregation: |
6 |
| 8.4.1 |
State type of cargo containment (integral, independent, gravity or pressure tanks): |
2G (Integral Gravity) |
| 8.5 |
Are there any cargo tank filling restrictions? If yes, specify number of slack tanks, max s.g., ullage restrictions etc.: |
Yes No restrictions upto SG 1.025. max allowed SG: 1.55T/M3 with filling restriction max 66%. For cargo with SG in between 1.025 to 1.55 T/M3 filling level restricted to interpolated value. |
| 8.6 |
Max loading rate for homogenous cargo |
With VECS |
Without VECS |
| Loaded per manifold connection: |
3,000 m3/hr |
3,000 m3/hr (1500 CBM / HR IF ONE PAIR OF TANKS
3000 CBM/ HRS IF MORE THAN 2 PAIRS OF TANKS) |
| Loaded simultaneously through all manifolds: |
4,500 m3/hr |
4,500.00 m3/hr |
| 8.7 |
Is ship fitted with a Cargo Control Room (CCR)? |
Yes |
| 8.8 |
Can tank innage / ullage be read from the CCR? |
Yes |
| 8.9 |
Is gauging system certified and calibrated? If no, specify which ones are not calibrated: |
Yes, |
|
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): |
Closed |
|
What type of fixed closed tank gauging system is fitted: |
N/A |
|
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves? |
Yes, N/A |
|
Are high level alarms fitted to the cargo tanks? If Yes, indicate whether to all tanks or partial: |
Yes, Yes |
| 8.9.1 |
Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? |
N/A |
| 8.9.2 |
Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: |
Yes, MMC vapour locks; Fore, Mid-Point & aft |
| 8.10 |
Number of portable gauging units (example- MMC) on board: |
3 |
| 8.11 |
Is a Vapour Emission Control System (VECS) fitted? |
Yes |
|
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? |
Yes |
|
If fitted, how many vapor return segregations can the vessel maintain simultaneously? |
1 |
|
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority |
Yes, ABS |
| 8.12 |
Number/size of VECS manifolds (per side): |
2 |
305 mm |
| 8.13 |
Number / size / type of VECS reducers: |
4 pcs - 12" X 12"; 2 pcs - 16" X 12" |
| 8.14 |
State what type of venting system is fitted: |
PV valves |
| 8.15 |
Total number/size of cargo manifold connections on each side:
No.: 6
Size:
| Manifold | PCS | Size | Unit | Pressure Rating | Unit PR | Standard |
|---|
| 1 | P | 12 | Inches | 10 | Bar | ANSI | | 1 | S | 12 | Inches | 10 | Bar | ANSI | | 2 | P | 12 | Inches | 10 | Bar | ANSI | | 2 | S | 12 | Inches | 10 | Bar | ANSI | | 3 | P | 12 | Inches | 10 | Bar | ANSI | | 3 | S | 12 | Inches | 10 | Bar | ANSI | | 4 | P | 12 | Inches | 10 | Bar | ANSI | | 4 | S | 12 | Inches | 10 | Bar | ANSI | | 5 | P | 12 | Inches | 10 | Bar | ANSI | | 5 | S | 12 | Inches | 10 | Bar | ANSI | | 6 | P | 12 | Inches | 10 | Bar | ANSI | | 6 | S | 12 | Inches | 10 | Bar | ANSI |
|
| 8.15.1 |
Is the vessel fitted with a fixed common line? |
Yes |
|
What is the number of common cargo connections per side? |
1 |
|
What is the size of common cargo connections? |
300 mm |
| 8.16 |
What type of valves are fitted at manifold: |
Butterfly, |
| 8.17 |
What is the material/rating of the manifold: |
stainless steel / ANSI 150PSI |
| 8.17.1 |
Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? |
Yes |
| 8.18 |
Distance between cargo manifold centers: |
2,000.00 mm |
| 8.19 |
Distance ships rail to manifold: |
4,300.00 mm |
| 8.20 |
Distance manifold to ships side: |
4,700.00 mm |
| 8.21 |
Top of rail to center of manifold: |
600.00 mm |
| 8.22 |
Distance main deck to center of manifold: |
1,950.00 mm |
| 8.23 |
Spill tank grating to center of manifold: |
900.00 mm |
| 8.24 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
13.50 m |
7.763 m |
| 8.25 |
Number / size / type of reducers: |
2 x 150/200mm (6/8") 2 x 200/250mm (8/10") 2 x 250/300mm (10/12") 2 x 300/400mm (12/16") ANSI |
| 8.26 |
Is vessel fitted with a stern manifold? If yes, state size: |
No, mm |
| 8.27 |
Provide details of Heating Coils/Heat Exchangers |
|
| 8.27.1 |
Is a Thermal Oil Heating system fitted? If yes, identify tanks? |
No, |
| 8.28 |
Maximum temperature cargo can be loaded / maintained: |
75.0 °C / 167.0 °F |
60 °C / 140 °F |
| 8.28.1 |
Minimum temperature cargo can be loaded / maintained: |
-10.0 °C / 14.0 °F |
|
| 8.29 |
Is an Inert Gas System (IGS) fitted / operational? |
Yes / Yes |
| 8.29.1 |
Is a Crude Oil Washing (COW) installation fitted / operational? |
N/A / N/A |
| 8.30 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
IG Generator |
| 8.30.1 |
If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: |
|
| 8.31 |
How many cargo pumps can be run simultaneously at full capacity: |
6 |
| 8.32 |
Cargo Pump Data |
| Pump Identity | Pump Location | Type | Type of prime mover | Capacity | At what head? |
|---|
| 1P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 1S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 2P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 2S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 3P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 3S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 4P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 4S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 5P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 5S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 6P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 6S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | Slop P | Cargo Tank | Centrifugal | Hydraulic | 300.00 | 125.00 | | Slop S | Cargo Tank | Centrifugal | Hydraulic | 300.00 | 125.00 |
|
| 8.33 |
Is at least one emergency portable cargo pump provided? |
Yes |
| 8.34 |
Is tank cleaning equipment fixed in cargo tanks? |
Yes |
| 8.35 |
Is portable tank cleaning equipment provided? |
Yes |
| 8.36 |
Tank washing pump capacity: |
120.00 m3/hr |
| 8.37 |
Is a washing water heater fitted? If yes is it operational and state max washing water temperature: |
Yes, Yes 70.00 °C |
| 8.38 |
What is the maximum number of machines that can be operated at their designed max pressure? |
4 |
| 8.39 |
Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? |
Yes, Yes |
| 8.40 |
Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? |
Yes, Yes |
| 8.41 |
Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: |
No, N/A m3/hr |
| 8.42 |
Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: |
No, N/A
|
| 8.43 |
Is steam available on deck? |
Yes |
| |
| 9.1 |
Provide details for Mooring Ropes, Wires, Tails and Shackles |
| Type | Location and Identity | Material | Diameter/size | Length | LDBF(100-105 % of SDMBL (Tonnes)) | TDBF(125-130 % of SDMBL (Tonnes) | SWL (tonnes) | WLL (tonnes) (50-55% of Max LDBF) | Certificate No. | Installed Date | Reversed Date | Renewal2 Date | Status of line/tail | Condition of line/tail |
|---|
| Ropes | M4 DRUM 12 | Signal B5 yarn and High Perform ance Polyeste | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | 7f588e43 | Sep 29, 2023 | Dec 23, 2024 | Sep 29, 2028 | In Use | Suitable | | Ropes | M4 DRUM 11 | Signal B5 yarn and High Perform ance Polyeste | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | 32516bdd | 2023-04-24 | Jun 22, 2024 | Apr 24, 2028 | In Use | Suitable | | Ropes | M1 DRUM 5 | Signal B5 yarn and High Perform ance Polyeste | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | a770ff15 | Dec 18, 2023 | Dec 23, 2024 | Dec 17, 2028 | In Use | Suitable | | Ropes | M2 DRUM 8 | Mixed polyolef ins (B5 yarn) and HT PES | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | 37741922 | Feb 05, 2024 | Dec 23, 2024 | Feb 04, 2029 | In Use | Suitable | | Ropes | LOOSE (L18) | Mixed polyolefins (B5 yarn) and HT PES | 54.00 | 220.00 | 58.00 | 0.00 | 58.00 | 29.00 | 804caaf1 | Jan 08, 2024 | Dec 23, 2024 | Jan 09, 2028 | In Use | Suitable | | Ropes | LOOSE (L17) | Signal B5 yarn and High Performance Polyester | 54.00 | 220.00 | 58.00 | 0.00 | 58.00 | 29.00 | 76571 | Nov 17, 2020 | Nov 17, 2020 | Nov 17, 2025 | In Use | Suitable | | Ropes | W2 DRUM 3 | Signal B5 yarn and High Performance Polyester | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | 7352a99f | Mar 13, 2024 | Mar 13, 2024 | Mar 13, 2029 | In Use | Suitable | | Ropes | LOOSE (L21) | High Tenacity Polyolefin & High Tenacity Polyester | 54.00 | 220.00 | 57.50 | 0.00 | 57.50 | 29.00 | 26518.3 | 2023-01-09 | 2023-09-30 | Jan 09, 2028 | In Use | Suitable | | Ropes | LOOSE (L22) | High Tenacity Polyolefin & High Tenacity Polyester | 54.00 | 220.00 | 57.50 | 0.00 | 57.50 | 29.00 | 26518.2 | 2023-01-09 | Jun 22, 2024 | Jan 09, 2028 | In Use | Suitable | | Ropes | M1 DRUM 6 | Mixed polyolefins (B5 yarn) and HT PES | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | 4edfaea4 | Dec 18, 2023 | Dec 23, 2024 | Dec 17, 2028 | In Use | Suitable | | Ropes | W2 DRUM 4 | Mixed polyolef ins (B5 yarn) and HT PES | 55.00 | 220.00 | 57 | 0.00 | 57 | 29.00 | 58c50110 | Mar 13, 2024 | Dec 23, 2024 | Mar 12, 2029 | In Use | Suitable | | Ropes | M2 DRUM 7 | Mixed polyolefins (B5 yarn) and HT PES | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | d71d26 19 | Feb 05, 2024 | Dec 23, 2024 | Feb 04, 2029 | In Use | Suitable | | Ropes | LOOSE (L2) | Signal B5 yarn and High Performance Polyester | 54.00 | 220.00 | 57.5 | 0.00 | 57.5 | 29.00 | 74012 | Sep 02, 2021 | Dec 23, 2024 | Jan 09, 2028 | In Use | Suitable | | Ropes | LOOSE (L20) | High Tenacity Polyolefin & High Tenacity Polyester | 54.00 | 220.00 | 58.00 | 0.00 | 58.00 | 29.00 | 26518.1 | Jan 09, 2023 | Sep 02, 2021 | Sep 02, 2026 | Spare | Suitable | | Ropes | LOOSE (L3) | Signal B5 yarn and High Performance Polyester | 54.00 | 220.00 | 58.00 | 0.00 | 58.00 | 29.00 | 74011 | Sep 02, 2021 | Sep 02, 2021 | Sep 02, 2026 | Spare | Suitable | | Ropes | LOOSE (L9) | Signal B5 yarn and High Perform ance Polyester | 54.00 | 220.00 | 58.00 | 0.00 | 58.00 | 29.00 | 74010 | Sep 02, 2021 | Sep 02, 2021 | Sep 02, 2026 | Spare | Suitable | | Ropes | LOOSE (L1) | Mixed polyolefins (B5 yarn) and HT PES | 54.00 | 220.00 | 58.00 | 0.00 | 58.00 | 29.00 | 7fb60047 | May 11, 2021 | May 11, 2021 | May 11, 2026 | Spare | Suitable | | Ropes | W1 DRUM 1 | Mixed polyolefins (B5 yarn) and HT PES | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | 79980c7a | Mar 01, 2025 | Mar 01, 2025 | Mar 01, 2030 | In Use | Suitable | | Ropes | W1 DRUM 2 | Mixed polyolefins (B5 yarn) and HT PES | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | b1108268 | Mar 01, 2025 | Mar 01, 2025 | Mar 01, 2030 | In Use | Suitable | | Ropes | M3 DRUM 10 | Mixed polyolefins (B5 yarn) and HT PES | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | 25e54460 | Mar 01, 2025 | Mar 01, 2025 | Mar 01, 2030 | In Use | Suitable | | Ropes | M3 DRUM 9 | Mixed polyolefins (B5 yarn) and HT PES | 55.00 | 220.00 | 57.00 | 0.00 | 57.00 | 29.00 | cd363631 | Mar 01, 2025 | Mar 01, 2025 | Mar 01, 2030 | In Use | Suitable |
|
| 9.2 |
Details of winches and brake testing including rendering loads |
| Mooring winch Location | Split Drum | Motive Power | Remote Operational controls | Heaving power | Hauling Speed | Type of Brake | Designed Brake Max holding load (ISO) (80% of SDMB | Operational brake holding load (60% of SDMBL) | Date of last brake test | Brake Rendering load | Frequency of testing brakes |
|---|
| 1 | | Hydraulic | Yes | 15.00 | 15.00 | Manual | 45.00 | 34.20 | Aug 05, 2025 | 34.20 | Annual | | 2 | | Hydraulic | Yes | 15.00 | 15.00 | Manual | 45.00 | 34.20 | Aug 05, 2025 | 34.20 | Annual | | 3 | | Hydraulic | Yes | 15.00 | 15.00 | Manual | 45.00 | 34.20 | Aug 05, 2025 | 34.20 | Annual | | 4 | | Hydraulic | Yes | 15.00 | 15.00 | Manual | 45.00 | 34.20 | Aug 05, 2025 | 34.20 | Annual | | 5 | | Hydraulic | Yes | 15.00 | 15.00 | Manual | 45.00 | 34.20 | Aug 05, 2025 | 34.20 | Annual | | 6 | | Hydraulic | Yes | 15.00 | 15.00 | Manual | 45.00 | 34.20 | Aug 05, 2025 | 34.20 | Annual |
|
| 9.3 |
Provide Details of Mooring bollards and bitts |
| Location | Identity No | Certificate Number | Size (mm) | SWL (tonnes) |
|---|
| Forecastle | 4 | | 450 | 64 | | Poop Deck (Port) | 2 | | 450 | 46 | | Poop Deck (Stbd) | 4 | | 450 | 64 | | Maindeck Forward (Port) | 6 | | 400 | 57 | | Maindeck Forward (Stbd) | 4 | | 550 | 57 | | Poop Deck (Stbd) | 4 | | 300 | 25 |
|
| 9.4 |
Provide details of Mooring Fairleads/Chocks |
| Type | Location | Identity No | Certificate | Size (mm) | SWL (tonnes) | Modifications | If yes, are modifications class approved? |
|---|
| Panama type | Forecastle | 1 | | 600 | 204 | no | no | | Closed roller type | Forecastle | 3 | | 400 | 57 | no | no | | Open roller type | Forecastle | 5 | | 300 | 15 | no | no | | Open roller type | Forecastle | 2 | | 350 | 57 | no | no | | Closed chock | Poop Deck (Port) | 8 | | 400 | 57 | no | no | | Panama type | Poop Deck (Port) | 4 | | 310 | 46 | no | no | | Panama type | Poop Deck (Port) | 2 | | 360 | 64 | no | no | | Open roller type | Maindeck Forward (Port) | 4 | | 300 | 15 | no | no | | Closed chock | Maindeck Forward (Port) | 16 | | 400 | 57 | no | no | | Closed chock | Maindeck Forward (Port) | 4 | | 500 | 57 | no | no |
|
| 9.5 |
Number of shackles on port / starboard cable: |
12.00 / 12.00 |
| 9.6 |
Type / SWL of Emergency Towing system forward: |
Towing |
204 MT |
| 9.7 |
Type / SWL of Emergency Towing system aft: |
Towing |
204 MT |
| 9.8 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
600x450 |
| 9.9 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
204.00 MT |
| 9.10 |
What is SWL of bollard on poop deck suitable for escort tug: |
204.00 MT |
| 9.11 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 1 x 10.00 Tonnes Centre |
| 9.12 |
Accommodation ladder direction: |
Aft |
| 9.13 |
Does vessel have a portable gangway? If yes, state length: |
Yes (Portable ladder length = 12.18 mtrs) |
12.18 m |
| 9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
Yes |
| 9.15 |
If fitted, how many chain stoppers: |
1 |
| 9.16 |
Details of Bow chain stoppers:
| Location/Number of Bow Chain Stopper | Type | Operation | SWL | Min Size of Chain | Max size of Chain |
|---|
| Port | Tongue | Manual | 204.00 | 76.00 | 76.00 |
|
| 9.17 |
Distance between the bow fairlead and chain stopper/bracket: |
2.70 m |
| 9.18 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes
|
| |
| 10.1 |
Speed |
Maximum |
Economical |
| Ballast speed: |
Kts (WSNP) (Contact Owners for details) |
Kts (WSNP) (Contact Owners for details) |
| Laden speed: |
Kts (WSNP) (Contact Owners for details) |
Kts (WSNP) (Contact Owners for details) |
| 10.2 |
What type of fuel is used for main propulsion? If other, then specify: |
HFO, MGO |
|
What type of fuel is used for generating plant |
Heavy fuel oil, MGO |
| 10.3 |
Bunker Tank Capacities:
| Tank Name | Bunker Type | Tank Type | Capacity | Max Pressure |
|---|
| No 1 HFO (P) | HFO | Main Bunker Tank | 348.0 | 0.2 | | No 1 HFO (S) | MDO | Main Bunker Tank | 77.1 | 0.2 | | No 2 HFO (P) | HFO | Main Bunker Tank | 472.5 | 0.2 | | no 2 HFO (S) | HFO | Main Bunker Tank | 500.4 | 0.2 | | HFO Sett (P) | HFO | Settling Tank | 28.1 | 0.2 | | HFO Serv (P) | HFO | Service Tank | 25.1 | 0.2 | | LSHFO Settling (P) | HFO | Settling Tank | 28.1 | 0.2 | | LSHFO Service (P) | HFO | Service Tank | 28.1 | 0.2 | | MGO service for HPU (S) | MDO | Service Tank | 19.3 | 0.2 | | MGO Service (S) | MDO | Service Tank | 62.7 | 0.2 | | N0. 1 MGO (S) | MDO | Main Bunker Tank | 172.8 | 0.2 | | N0. 2 MGO (S) | MDO | Main Bunker Tank | 84.9 | 0.2 | | N0. 1 MGO (S) | MDO | Main Bunker Tank | 72.2 | 0.2 |
If other, then specify |
| 10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
| 10.5 |
Engines |
No |
Capacity |
Make/Type |
| Main engine: |
1 |
7,317 Kw |
MAN B&W 6G50ME-B9.3 |
| Aux engine: |
3 |
852 Kw |
STX |
| Power packs: |
4 |
4,500 m3/hr |
2 x Electric, 2 X Cummins Diesel |
| Boilers: |
2 |
18.00 MT/Hr |
Alfa Laval |
| 10.6 |
What is brake horse power of bow thruster (if fitted): |
No, bhp |
| 10.7 |
What is brake horse power of stern thruster (if fitted): |
No, bhp |
| 10.8 |
Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: |
Yes, 4.06 |
|
If No then provide reason: |
|
|
Is the EEDI rating verified by Class, 3rd Party or Owner? |
Class |
| 10.9 |
Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: |
Yes, 4.06 |
|
If No then provide reason: |
|
|
Is the EEXI rating verified by Class, 3rd Party or Owner? |
Class |
| 10.10 |
Does the vessel have a CII Rating number? If yes then provide CII rating: |
Yes, A |
|
If No then provide reason: |
|
|
Is the CII rating verified by Class, 3rd Party or Owner? |
3rd Party |
| 10.11 |
Does the vessel have an EIV Rating number? If yes then provide EIV rating: |
No, |
|
If No then provide reason: |
|
|
Is the EIV rating verified by Class, 3rd Party or Owner? |
|
| 10.12 |
What is the ships NOx control level (Tier I, Tier II, and Tier III)?: |
Tier II |
|
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...) |
|
| 10.13 |
Does the vessel use an Exhaust Gas Cleaning System? |
No |
| 10.14 |
What is the type of scrubber fitted as part of the EGCS onboard? |
|
| |
| 11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
Yes |
| 11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
5.10 m |
| 11.3 |
Date/place of last STS operation: |
26-05-2022 / Gibraltar |
| 11.4 |
Does the vessel have a ship specific STS plan: |
|
| |
| 12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
| 12.2 |
Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details: No
|
| 12.3 |
Date and place of last Port State Control inspection: |
Aug 11, 2025, Pisco |
| 12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
No NIL |
| 12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Vina Del Mar, PSC-Tokyo MOU, PORT STATE |
| 12.6 |
Date / place of last SIRE inspection: |
Sep 28, 2025 / MANZANILLO |
| 12.6.1 |
Date / place of last CDI inspection: |
N/A |
| 12.7 |
Additional information relating to features of the ship or operational characteristics: |
Vessel holds dual Certificate of Fitness - IMO Ship type 2 & 3 |