| 1.1 |
Date updated: |
Oct 31, 2025 |
| 1.2 |
Vessel's name (IMO number): |
Ardmore Purpose (9859208) |
| 1.2b |
Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization |
No, |
| 1.3 |
Vessel's previous name(s) and date(s) of change: |
Nordtokyo (Aug 13, 2025) GWN2 (Nov 28, 2022) |
| 1.4 |
Date delivered / Builder (where built): |
Sep 08, 2020 / Samsung Heavy Industries Co., Ltd , Geoje |
| 1.5 |
Flag / Port of Registry: |
Marshall Islands / Majuro |
| 1.6 |
Call sign / MMSI: |
V7A3557 / 538011845 |
| 1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: +1 6469394740/41 |
| Fax: |
| Email: ardmorepurpose@aesmvsl.com |
| 1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
Other (Product Carrier) |
| 1.8a |
If other type of vessel, please specify: |
Product Carrier |
| 1.9 |
Type of hull: |
Double Hull |
| 1.10 |
Registered owner - Full style: IMO Number |
Allen Shipco LLC Trust Company Complex, Ajeltake Road, Ajeltake Island, Majuro, Marshall Islands, MH96960 Marshall Islands Tel: +353212409500 Fax: +353212409501 Email: marine@ardmoreshipping.com Web: Web: www.ardmoreshipping.com IMO: 0286234 |
| 1.11 |
Technical operator - Full style: |
Anglo Ardmore Ship Mgmt Pte. Ltd 1 Pasir Panjang Road, #12-01 Labrador Tower, Singapore 118479 Singapore Tel: +65 62243119 Email: vetting@angloardmore.com Company IMO#: 0165517 |
| 1.12 |
Commercial operator - Full style: |
Ardmore Maritime Services (Asia) Pte Ltd 137 Telok Ayer Street
#08-01
Singapore Singapore Tel: +353 21 240 9500 Fax: +353 212 240 9512 Email: Commercialoperations@ardmoreshipping.com Web: www.ardmoreshipping.com |
| 1.13 |
Disponent owner - Full style: |
Ardmore MR Pool LLC Trust Company Complex, Ajeltake Road, Ajeltake Island, Majuro, Marshall Islands, MH96960 Tel: +65 63299400 Email: Commercialoperations@ardmoreshipping.com Web: www.ardmoreshipping.com |
| 1.14 |
P & I Club - Full Style: |
The West of England Ship Owners Mutual Insurance Association (Luxembourg) Tower Bridge Court 226 Tower Bridge Road, London SE1 2UP. Tel: +44 20 7716 6000 Email: mail@westpandi.com Web: www.westpandi.com |
| 1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2026 |
| 1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Amwins Global Risks 22 Bishopsgate, London
EC2N 4BQ Tel: +44 (0)20 7469 0100 |
| 1.17 |
Hull & Machinery insured value / expiration date: |
US$ (Contact owners for details) |
Jan 01, 2026 |
| 1.18 |
Classification society: |
Lloyds Register |
| 1.18a |
Is Classification Society an IACS member? |
Yes |
| 1.19 |
Class notation: |
+100A1, Double Hull Oil and Chemical Tanker, Ship Type 2 and Ship Type 3, CSR, ESP, ShipRight(CM, ACS(B)), LI, *IWS, ECO +LMC, IGS, UMS, NAV1, EGCS(Open, Partial) Descriptive Note ShipRight (MPMS(CM),BWMP(T, S), SCM, SERS, IHM-EU+) |
| 1.20 |
Does the vessel have any open conditions of Class?? If yes List all open conditions: |
No
| Open Conditions of Class | Due Date |
|---|
|
| 1.20a |
Does the vessel have any Memoranda of Class? If yes, list details: |
No
|
| 1.21 |
If classification society changed, name of previous and date of change: |
, |
| 1.22 |
Does the vessel have ice class? If yes, state what level: |
No, |
| 1.23 |
Date / place of last dry-dock: |
Aug 29, 2025 / REMONTOWA, GDANSK, POLAND |
| 1.24 |
Date next dry dock due / next annual survey due: |
Sep 07, 2030 |
Sep 07, 2026 |
| 1.25 |
Date of last special survey / next special survey due: |
Aug 29, 2025 |
Sep 07, 2030 |
| 1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, |
| 1.27 |
Length overall (LOA): |
183.09 m |
| 1.28 |
Length between perpendiculars (LBP): |
175.00 m |
| 1.29 |
Extreme breadth (Beam): |
32.20 m |
| 1.30 |
Moulded depth: |
19.10 m |
| 1.31 |
Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: |
45.99 m |
m |
| 1.32 |
Distance bridge front to center of manifold: |
57.53 m |
| 1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
89.91 m |
93.18 m |
| 1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
| Forward to mid-point manifold: |
25.26 m |
37.79 m |
40.02 m |
| Aft to mid-point manifold: |
26.26 m |
42.14 m |
61.24 m |
| Parallel body length: |
51.52 m |
79.93 m |
101.26 m |
| 1.35 |
Net Tonnage: |
13,762.00 |
| 1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
30,087.00 |
23,880 |
| 1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
31,628.98 |
26,882.40 |
| 1.38 |
Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): |
Yes, 24,972.00 |
| 1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
| Summer: |
5.813 m |
13.316 m |
50,191.70 MT |
61,278.40 MT |
| Winter: |
6.09 m |
13.039 m |
48,712 MT |
59,798.70 MT |
| Tropical: |
5.536 m |
13.593 m |
51,674 MT |
62,760.70 MT |
| Normal loaded condition: |
5.81 m |
13.32 m |
50,191.70 MT |
61,278.40 MT |
| Lightship: |
16.18 m |
2.95 m |
Not Applicable |
11,086.70 MT |
| Normal Ballast Condition: |
11.84 m |
7.29 m |
19,290.20 MT |
30,376.90 MT |
| Segregated Ballast Condition: |
11.84 m |
7.29 m |
19,290.20 MT |
30,376.90 MT |
| 1.40 |
FWA/TPC at summer draft: |
286 mm |
53.50 MT |
| 1.41 |
Have multiple deadweights been assigned? If yes, list all assigned deadweights: |
Yes Assigned DWT 1: 50,191.70 Assigned DWT 2: 44,999.00 Assigned DWT 3: 39,999.00 Assigned DWT 4: 34,999.00 Assigned DWT 5: |
| 1.42 |
Constant (excluding fresh water): |
125.00 MT |
| 1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
1.Pilotage:10% of Max Static Draft + Squat at Transit Speed + Variables
2.Coastal Waters:20% of Max Static Draft + Squat at Transit Speed + Variables
3. Open Waters:50% of Max Static Draft + Squat at Transit Speed + Variables
4.At Berth: 1.5% of Vessel's Extreme Breadth or 0.3m, whichever is greater + Variables.
5.SPM or CBM: not less than 20% of vessels static draft + Variables
6.At Anchor: 20% of Vessel Static Draft( Unprotected water) 10% of Vessels static draft( Protected or Sheltered water) |
| 1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
| Summer deadweight: |
32.674 m |
0 m |
| Normal ballast: |
38.70 m |
0 m |
| Lightship: |
43.04 m |
0 m |
| |
| 2.1 |
Safety Equipment Certificate (SEC): |
Aug 29, 2025 |
|
|
Sep 07, 2030 |
| 2.2 |
Safety Radio Certificate (SRC): |
Aug 29, 2025 |
|
|
Sep 07, 2030 |
| 2.3 |
Safety Construction Certificate (SCC): |
Aug 29, 2025 |
|
|
Sep 07, 2030 |
| 2.4 |
International Loadline Certificate (ILC): |
Aug 29, 2025 |
|
|
Sep 07, 2030 |
| 2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Aug 29, 2025 |
|
|
Sep 07, 2030 |
| 2.6 |
International Ship Security Certificate (ISSC): |
Aug 29, 2025 |
|
|
Feb 27, 2026 |
| 2.7 |
Maritime Labour Certificate (MLC): |
Aug 29, 2025 |
Not Applicable |
|
Feb 27, 2026 |
| 2.8 |
Minimum Safe Manning Certificate (MSM): |
Aug 13, 2025 |
|
Not Applicable |
|
| 2.9 |
ISM Safety Management Certificate (SMC): |
Aug 29, 2025 |
|
|
Feb 27, 2026 |
| 2.10 |
Document of Compliance (DOC): |
Mar 11, 2025 |
Sep 05, 2025 |
|
Oct 23, 2026 |
| 2.11 |
USCG Certificate of Compliance (USCGCOC): |
|
|
|
|
| 2.12 |
Civil Liability Convention (CLC) 1992 Certificate: |
Aug 05, 2025 |
Not Applicable |
Not Applicable |
Feb 20, 2026 |
| 2.13 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Aug 05, 2025 |
Not Applicable |
Not Applicable |
Feb 20, 2026 |
| 2.14 |
Liability for the Removal of Wrecks Certificate (WRC): |
Aug 05, 2025 |
Not Applicable |
Not Applicable |
Feb 20, 2026 |
| 2.15 |
U.S. Certificate of Financial Responsibility (COFR): |
Nov 22, 2022 |
Not Applicable |
Not Applicable |
Nov 22, 2025 |
| 2.16 |
Certificate of Class (COC): |
Aug 29, 2025 |
|
|
Sep 07, 2030 |
| 2.17 |
Certificate of Registry (COR): |
Aug 13, 2025 |
Not Applicable |
Not Applicable |
Aug 12, 2026 |
| 2.18 |
International Sewage Pollution Prevention Certificate (ISPPC) |
Aug 29, 2025 |
Not Applicable |
Not Applicable |
Sep 07, 2030 |
| 2.19 |
Certificate of Fitness (COF): |
N/A |
N/A |
N/A |
N/A |
| 2.20 |
International Energy Efficiency Certificate (IEEC): |
Aug 29, 2025 |
Not Applicable |
Not Applicable |
Not Applicable |
| 2.21 |
International Air Pollution Prevention Certificate (IAPPC): |
Aug 29, 2025 |
|
|
Sep 07, 2030 |
| 2.22 |
Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): |
Aug 19, 2025 |
Not Applicable |
Not Applicable |
Feb 18, 2026 |
| 2.23 |
Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: |
Yes, |
| 2.24 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
| 2.25 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
| 2.26 |
Is the ITF Special Agreement on board (if applicable)? |
Yes |
| 2.27 |
ITF Blue Card expiry date (if applicable): |
Aug 12, 2027 |
| |
| 3.1 |
Nationality of Master: |
Indian |
| 3.2 |
Number and nationality of Officers: |
11 |
Indian |
| 3.3 |
Number and nationality of Crew: |
| Nationality | Count |
|---|
| India | 11 |
|
| 3.4 |
What is the common working language onboard: |
English |
| 3.5 |
Do officers speak and understand English? |
Yes |
| 3.6 |
If Officers/ratings employed by a Manning Agency - Full style: |
Officers:
| Company Name | Address | Phone | Fax | Email |
|---|
| Anglo Ardmore ShipManagement Pte. Ltd. | 1 Pasir Panjang Road, #13-01 Labrador Tower, Singa | +65 6224 3119 | | operations@angloardmore.com |
Ratings:
| Company Name | Address | Phone | Fax | Email |
|---|
|
| |
| 4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
Yes |
| 4.2 |
Qualified individual (QI) - Full style: |
O'Brien's Oil Pollution Service Witt O'Brien's
818 Town and Country Blvd., Suite 200
Houston, TX 77024, USA Tel: +1-985-781-0804 Fax: +1-609-275-9444 Email: commandcenter@wittobriens.com |
| 4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
National Response Corporation 3500 Sunrise Highway
Great River, New York 11739, USA Tel: +1-631-224-9141 (24 Hrs) / +1-800-899-4672 Fax: +1-631-224-9086 / 224-9082 Email: iocdo@nrcc.com Web: www.wittobriens.com |
| 4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
RESOLVE MARINE GROUP, INC. Corporate Headquarters
1510 SE 17th St., Suite 400
Fort Lauderdale, FL 33316 Tel: +1-954-764-8700 Email: opa90@resolvemarine.com Web: www.resolvemarine.com |
| |
| 5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes ISO 9001:2015 |
| 5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
Yes |
| 5.2.1 |
If Yes, state whether winching or landing area provided: |
Winching |
| 5.2.2 |
If Yes, what is the diameter of the circle provided: |
11.84 m |
| |
| 6.1 |
Cargo tanks:
| Tank ID | Tank PSC | Tank Type | Constr | Coated Y/N | Coating Type | Extent | Condition | Date | Insp date | Insp Freq |
|---|
| 8 | P | Residual | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 15, 2025 | 30 Months | | 1 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 14, 2025 | 30 Months | | 1 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 14, 2025 | 30 Months | | 2 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 14, 2025 | 30 Months | | 2 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 14, 2025 | 30 Months | | 3 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 14, 2025 | 30 Months | | 3 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 14, 2025 | 30 Months | | 4 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 15, 2025 | 30 Months | | 4 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 15, 2025 | 30 Months | | 5 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 15, 2025 | 30 Months | | 5 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 15, 2025 | 30 Months | | 6 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 15, 2025 | 30 Months | | 6 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 15, 2025 | 30 Months | | 7 | P | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 15, 2025 | 30 Months | | 7 | S | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | 2020-05-20 | Aug 15, 2025 | 30 Months |
Anodes Fitted: No |
Ballast tanks:
| ID | Coated? | Type | Extent | Condition | Coating date | Insp date | Insp freq |
|---|
| 1P | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 16, 2025 | Annual | | 1S | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 16, 2025 | Annual | | 2P | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 16, 2025 | Annual | | 2S | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 16, 2025 | Annual | | 3P | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 17, 2025 | Annual | | 3S | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 17, 2025 | Annual | | 4P | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 17, 2025 | Annual | | 4S | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 17, 2025 | Annual | | 5P | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 18, 2025 | Annual | | 5S | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 18, 2025 | Annual | | 6P | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 18, 2025 | Annual | | 6S | Yes | Epoxy | Full Tank | Good | May 20, 2020 | Aug 18, 2025 | Annual |
Anodes Fitted: Yes |
| |
| 7.1 |
Ballast Handling Data
| Number | Type | Prime mover type | Capacity (m3/hr) | Head (bar) |
|---|
| 1 | Centrifugal | Hydraulic | 750.00 | 3.50 | | 2 | Centrifugal | Hydraulic | 750.00 | 3.50 |
|
| 7.2 |
Does the vessel comply with D1 or D2 performance standards? |
D2 |
| 7.3 |
Does the vessel have a Ballast Water Treatment System (BWTS) fitted? |
Yes |
| 7.4 |
What type of BWTS fitted? If other system fitted, please advise: |
Chemical, |
| 7.5 |
Name of manufacturer of BWTS: |
PURIMAR TM SO-200(Ex) (Capacity : 2000.00 m3/h) |
| 7.6 |
Does the BWTS have IMO type approval? |
Yes |
| 7.7 |
Is the BWTS of a USCG approved type? |
Yes |
| |
| 8.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: |
Yes, Solid |
| 8.2 |
Cargo Tank Capacities at 98% Full - Centre:
Total Centre: 51,772.30 m3
Cargo Tank Capacities at 98% Full - Wing:
| Tank Number | Capacity (m3) | P/S |
|---|
| 1 | 2922.00 | Port | | 1 | 2912.30 | Stbd | | 2 | 4543.00 | Port | | 2 | 4542.20 | Stbd | | 3 | 4739.10 | Port | | 3 | 4729.40 | Stbd | | 4 | 4735.40 | Port | | 4 | 4728.60 | Stbd | | 5 | 4735.20 | Port | | 5 | 4725.80 | Stbd | | 6 | 4239.20 | Port | | 6 | 4220.10 | Stbd | | Slop | 473.40 | Port | | Slop | 686.60 | Stbd |
Total Wing: 52,932.20 m3
Deck Tank Capacities at 98% Full:
Total Deck: m3
|
| 8.2a |
Grand Total Cubic Capacity (98%) (centre + wing tanks): |
52,932.20 m3 |
| 8.2.1 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
Seg#1: 5834.3 m3 (NO.1 C.O.TK(P), NO.1 C.O.TK(S)) Seg#2: 9085.2 m3 (NO.2 C.O.TK(P), NO.2 C.O.TK(S)) Seg#3: 9468.5 m3 (NO.3 C.O.TK(P), NO.3 C.O.TK(S)) Seg#4: 9464.0 m3 (NO.4 C.O.TK(P), NO.4 C.O.TK(S)) Seg#5: 9461.0 m3 (NO.5 C.O.TK(P), NO.5 C.O.TK(S)) Seg#6: 8459.3 m3 (NO.6 C.O.TK(P), NO.6 C.O.TK(S)) |
| 8.2.2 |
IMO class (Oil/Chemical Ship Type 1, 2 or 3): |
IMO 2 (and IMO 3) |
| 8.3 |
Slop tank capacities (98%):
| Tank Number | Capacity (m3) | P/S |
|---|
| Slop | 473.40 | Port | | Slop | 686.60 | Stbd |
Total: 1,160.00 m3
|
| 8.3.1 |
Specify segregations which slops tanks belong to and their capacity with double valve: |
Slop manifold is connected to each slop tank with double valve separation |
| 8.3.2 |
Residual/Retention oil tank(s) capacity (98%), if applicable: |
227.60 m3 |
| 8.3.3 |
What is total SBT capacity and percentage of SDWT vessel can maintain? |
N/A |
N/A |
| 8.3.4 |
Does vessel meet the requirements of MARPOL Annex I Reg 18.2: |
N/A |
| 8.4 |
How many grades/products can vessel load/discharge with double valve segregation: |
6 |
| 8.4.1 |
State type of cargo containment (integral, independent, gravity or pressure tanks): |
Independent |
| 8.5 |
Are there any cargo tank filling restrictions? If yes, specify number of slack tanks, max s.g., ullage restrictions etc.: |
Yes As per Certificate Of Fitness |
| 8.6 |
Max loading rate for homogenous cargo |
With VECS |
Without VECS |
| Loaded per manifold connection: |
1,750 m3/hr |
1,750 m3/hr |
| Loaded simultaneously through all manifolds: |
4,440.00 m3/hr |
4,440.00 m3/hr |
| 8.7 |
Is ship fitted with a Cargo Control Room (CCR)? |
Yes |
| 8.8 |
Can tank innage / ullage be read from the CCR? |
Yes |
| 8.9 |
Is gauging system certified and calibrated? If no, specify which ones are not calibrated: |
Yes, |
|
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): |
Closed |
|
What type of fixed closed tank gauging system is fitted: |
N/A |
|
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves? |
Yes, N/A |
|
Are high level alarms fitted to the cargo tanks? If Yes, indicate whether to all tanks or partial: |
Yes, Yes |
| 8.9.1 |
Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? |
N/A |
| 8.9.2 |
Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: |
Yes, Radar beam type in tanks floatation centre |
| 8.10 |
Number of portable gauging units (example- MMC) on board: |
3 |
| 8.11 |
Is a Vapour Emission Control System (VECS) fitted? |
Yes |
|
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? |
Yes |
|
If fitted, how many vapor return segregations can the vessel maintain simultaneously? |
1 |
|
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority |
Yes, Lloyds Register |
| 8.12 |
Number/size of VECS manifolds (per side): |
2 |
400 mm |
| 8.13 |
Number / size / type of VECS reducers: |
4EA / 12 x 16 for principal fitting
2EA / 12 x 12 for reserved reducer
1EA / 10 x 12 for reserved reducer |
| 8.14 |
State what type of venting system is fitted: |
Individual PV valves as primary |
| 8.15 |
Total number/size of cargo manifold connections on each side:
No.: 7 (Six(6) / 400A for cargo manifolds
One(1) / 400A for slop manifold)
Size:
| Manifold | PCS | Size | Unit | Pressure Rating | Unit PR | Standard |
|---|
| 1 | P | 16 | Inches | 9 | Bar | ANSI | | 1 | S | 16 | Inches | 9 | Bar | ANSI | | 2 | P | 16 | Inches | 9 | Bar | ANSI | | 2 | S | 16 | Inches | 9 | Bar | ANSI | | 3 | P | 16 | Inches | 9 | Bar | ANSI | | 3 | S | 16 | Inches | 9 | Bar | ANSI | | 4 | P | 16 | Inches | 9 | Bar | ANSI | | 4 | S | 16 | Inches | 9 | Bar | ANSI | | 5 | P | 16 | Inches | 9 | Bar | ANSI | | 5 | S | 16 | Inches | 9 | Bar | ANSI | | 6 | P | 16 | Inches | 9 | Bar | ANSI | | 6 | S | 16 | Inches | 9 | Bar | ANSI | | 7 | P | 16 | Inches | 9 | Bar | ANSI | | 7 | S | 16 | Inches | 9 | Bar | ANSI |
|
| 8.15.1 |
Is the vessel fitted with a fixed common line? |
Yes |
|
What is the number of common cargo connections per side? |
7 |
|
What is the size of common cargo connections? |
400 mm |
| 8.16 |
What type of valves are fitted at manifold: |
Butterfly, |
| 8.17 |
What is the material/rating of the manifold: |
Stainless steel / 16'' / ANSI B16.5 CLASS 150 |
| 8.17.1 |
Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? |
Yes |
| 8.18 |
Distance between cargo manifold centers: |
2,000.00 mm |
| 8.19 |
Distance ships rail to manifold: |
4,450.00 mm |
| 8.20 |
Distance manifold to ships side: |
4,570.00 mm |
| 8.21 |
Top of rail to center of manifold: |
630.00 mm |
| 8.22 |
Distance main deck to center of manifold: |
2,100.00 mm |
| 8.23 |
Spill tank grating to center of manifold: |
930.00 mm |
| 8.24 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
13.839 m |
7.913 m |
| 8.25 |
Number / size / type of reducers: |
21 x 406/304mm (16/12") 12 x 406/203mm (16/8") 2 x 203/304mm (8/12") 6 x 254/304mm (10/12") 6 x 304/304mm (12/12") (PRINCIPAL FITTING (ECCENTRIC TYPE)
12EA -- 16”X 12”
2EA -- 16”X 8”
RESERVED (ECCENTRIC TYPE)
6EA -- 8”X 12”
6EA -- 10”X 12”
6EA -- 12”X 12”
1EA -- 8” x 8”
1EA -- 10” X 8”
1EA -- 12”X 8”) ANSI |
| 8.26 |
Is vessel fitted with a stern manifold? If yes, state size: |
No, mm |
| 8.27 |
Provide details of Heating Coils/Heat Exchangers |
| Tank ID | P/C/S/ Decktank/ Other | Heat exchanger | Internal/External | External ducts | Heating coils | Heating coil sets | Height of the heating coils above tank bottom (mm) | total heating surface (m2) | Ratio of the heating surface | Welded or coupled | Material |
|---|
| 1 | P | | Internal | | | 2 | 200.00 | 26.78 | 0.00919 | Welded | SS | | 1 | S | | Internal | | | 2 | 200.00 | 26.7 | 0.0092 | Welded | SS | | 2 | P | | Internal | | | 2 | 200.00 | 38.86 | 0.00856 | Welded | SS | | 2 | S | | Internal | | | 2 | 200.00 | 38.81 | 0.00857 | Welded | SS | | 3 | P | | Internal | | | 2 | 200.00 | 40.34 | 0.00853 | Welded | SS | | 3 | S | | Internal | | | 2 | 200.00 | 40.27 | 0.00854 | Welded | SS | | 4 | P | | Internal | | | 2 | 200.00 | 40.34 | 0.00853 | Welded | SS | | 4 | S | | Internal | | | 2 | 200.00 | 40.27 | 0.00854 | Welded | SS | | 5 | P | | Internal | | | 2 | 200.00 | 40.26 | 0.00852 | Welded | SS | | 5 | S | | Internal | | | 2 | 200.00 | 40.19 | 0.00852 | Welded | SS | | 6 | P | | Internal | | | 2 | 200.00 | 34.72 | 0.0082 | Welded | SS | | 6 | S | | Internal | | | 2 | 200.00 | 34.62 | 0.00822 | Welded | SS | | SLOP | P | | Internal | | | 2 | 200.00 | 17.04 | 0.03853 | Welded | SS | | SLOP | S | | Internal | | | 2 | 200.00 | 4.61 | 0.01308 | Welded | SS | | ROT | P | | Internal | | | 1 | 200.00 | 9.81 | 0.03953 | Welded | SS |
|
| 8.27.1 |
Is a Thermal Oil Heating system fitted? If yes, identify tanks? |
No, |
| 8.28 |
Maximum temperature cargo can be loaded / maintained: |
66.0 °C / 150.8 °F |
44 °C / 111.2 °F |
| 8.28.1 |
Minimum temperature cargo can be loaded / maintained: |
|
|
| 8.29 |
Is an Inert Gas System (IGS) fitted / operational? |
Yes / Yes |
| 8.29.1 |
Is a Crude Oil Washing (COW) installation fitted / operational? |
N/A / N/A |
| 8.30 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
IG Generator |
| 8.30.1 |
If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: |
NA |
| 8.31 |
How many cargo pumps can be run simultaneously at full capacity: |
6 |
| 8.32 |
Cargo Pump Data |
| Pump Identity | Pump Location | Type | Type of prime mover | Capacity | At what head? |
|---|
| 1P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 1S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 2P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 2S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 3P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 3S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 4P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 4S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 5P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 5S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 6P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 6P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | Slop P | Cargo Tank | Centrifugal | Hydraulic | 300.00 | 125.00 | | Slop P | Cargo Tank | Centrifugal | Hydraulic | 300.00 | 125.00 |
|
| 8.33 |
Is at least one emergency portable cargo pump provided? |
Yes |
| 8.34 |
Is tank cleaning equipment fixed in cargo tanks? |
Yes |
| 8.35 |
Is portable tank cleaning equipment provided? |
Yes |
| 8.36 |
Tank washing pump capacity: |
100.00 m3/hr |
| 8.37 |
Is a washing water heater fitted? If yes is it operational and state max washing water temperature: |
Yes, Yes 80.00 °C |
| 8.38 |
What is the maximum number of machines that can be operated at their designed max pressure? |
2 |
| 8.39 |
Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? |
Yes, Yes |
| 8.40 |
Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? |
Yes, Yes |
| 8.41 |
Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: |
No, N/A m3/hr |
| 8.42 |
Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: |
No,
|
| 8.43 |
Is steam available on deck? |
Yes |
| |
| 9.1 |
Provide details for Mooring Ropes, Wires, Tails and Shackles |
| Type | Location and Identity | Material | Diameter/size | Length | LDBF(100-105 % of SDMBL (Tonnes)) | TDBF(125-130 % of SDMBL (Tonnes) | SWL (tonnes) | WLL (tonnes) (50-55% of Max LDBF) | Certificate No. | Installed Date | Reversed Date | Renewal2 Date | Status of line/tail | Condition of line/tail |
|---|
| Ropes | BOSUN STORE | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 8724e298 | | | | Spare | Suitable | | Ropes | MAIN DK FWD PORT | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | c28340fa | Sep 01, 2025 | | | In Use | Suitable | | Ropes | FOCSLE STBD(INNER) | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 44d503be | Sep 01, 2025 | | | In Use | Suitable | | Ropes | FOCSLE CENTRE | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 02e8182f | Sep 01, 2025 | | | In Use | Suitable | | Ropes | MAIN DECK FWD STBD2 | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | b66285f0 | Sep 01, 2025 | | | In Use | Suitable | | Ropes | STEERING ROOM | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 938e324b | | | | Spare | Suitable | | Ropes | BOSUN STORE | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 87e0bdd8 | | | | Spare | Suitable | | Ropes | POOP DK STBD(OUTER) | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 5022793b | Sep 01, 2025 | | | In Use | Suitable | | Ropes | F'OCSLE STBD(INNER) | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 981b36fc | Sep 01, 2025 | | | In Use | Suitable | | Ropes | STEERING ROOM | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 9d72372c | | | | Spare | Suitable | | Ropes | MAIN DK AFT PORT2 | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 11daed0d | Sep 01, 2025 | | | In Use | Suitable | | Ropes | MAIN DK AFT PORT1 | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 12251af4 | Sep 01, 2025 | | | In Use | Suitable | | Ropes | MAIN DK FWD PORT | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 3010094d | Sep 01, 2025 | | | In Use | Suitable | | Ropes | MAIN DK FWD STBD | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | d3a6357b | Sep 01, 2025 | | | In Use | Suitable | | Ropes | FOCSLE PORT OUTER | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 4ed0ed60 | Sep 01, 2025 | | | In Use | Suitable | | Ropes | POOP DK PORT(OUTER) | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 924c5944 | Sep 01, 2025 | | | In Use | Suitable | | Ropes | MAIN DK AFT STBD2 | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 562baf85 | Sep 01, 2025 | | | In Use | Suitable | | Ropes | POOP DK STBD(INNER)1 | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 3e47f0bc | Sep 01, 2025 | | | In Use | Suitable | | Ropes | MAIN DECK AFT PORT1 | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | '23841821 | Sep 01, 2025 | | | In Use | Suitable | | Ropes | FOCSLE STBD( INNER) | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220.00 | 55.65 | | 53.00 | | 'b188b864 | Sep 01, 2025 | | | In Use | Suitable | | Ropes | POOP DK PORT(INNER) | Mixed Polyolefins (B5 yarn) and HT PES | 53 | 220 | 55.65 | | 53.00 | | 0f477afc | Sep 01, 2025 | | | In Use | Suitable |
|
| 9.2 |
Details of winches and brake testing including rendering loads |
| Mooring winch Location | Split Drum | Motive Power | Remote Operational controls | Heaving power | Hauling Speed | Type of Brake | Designed Brake Max holding load (ISO) (80% of SDMB | Operational brake holding load (60% of SDMBL) | Date of last brake test | Brake Rendering load | Frequency of testing brakes |
|---|
| 1 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 2 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 3 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 4 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 5 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 6 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 7 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 8 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 9 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 10 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 11 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 12 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 13 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 14 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 month | | 15 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month | | 16 | Yes | Hydraulic | No | 147.00 | 0.25 | Manual | 42.40 | 31.80 | Sep 02, 2025 | 31.80 | 12 Month |
|
| 9.3 |
Provide Details of Mooring bollards and bitts |
| Location | Identity No | Certificate Number | Size (mm) | SWL (tonnes) |
|---|
| Forecastle | 4 | DWG no. DB00510 | 500 | 64 | | Poop Deck (Port) | 2 | DWG. No. DB00510 | 500 | 64 | | Poop Deck (Stbd) | 2 | DWG. No. DB00510 | 500 | 64 | | Poop Deck (Port) | 1 | DWG. No. DB00510 | 500 | 53 | | Poop Deck (Stbd) | 1 | DWG. No. DB00510 | 500 | 53 | | Forecastle | 2 | DWG. No. DB00510 | 500 | 53 | | Maindeck Forward (Port) | 2 | DWG. No. DB00510 | 500 | 53 | | Maindeck Forward (Stbd) | 2 | DWG. No. DB00510 | 500 | 53 | | Maindeck Forward (Port) | 1 | DWG. No. DB00510 | 450 | 55 | | Maindeck Forward (Stbd) | 1 | DWG. No. DB00510 | 450 | 55 | | Maindeck Forward (Port) | 2 | DWG. No. DB00510 | 300 | 25 | | Maindeck Forward (Stbd) | 2 | DWG. No. DB00510 | 300 | 25 | | Poop Deck (Port) | 4 | DWG. No. DB00510 | 450 | 53 | | Poop Deck (Stbd) | 4 | DWG. No. DB00510 | 450 | 53 | | Poop Deck (Port) | 8 | DWG. No. DB00510 | 250 | 25 | | Poop Deck (Stbd) | 8 | DWG. No. DB00510 | 250 | 25 | | Forecastle | 1 | BUS 1908430 | 600 | 204 | | Poop Deck (Port) | 1 | BUS 1908430 | 600 | 204 |
|
| 9.4 |
Provide details of Mooring Fairleads/Chocks |
| Type | Location | Identity No | Certificate | Size (mm) | SWL (tonnes) | Modifications | If yes, are modifications class approved? |
|---|
| Closed chock | Forecastle | 2 | DWG. No. DB00510 | 400 | 64 | no | no | | Closed chock | Forecastle | 2 | DWG. No. DB00510 | 400 | 90 | no | no | | Closed chock | Poop Deck (Port) | 1 | DWG. No. DB00510 | 400 | 90 | no | no | | Closed chock | Poop Deck (Stbd) | 1 | DWG. No. DB00510 | 400 | 90 | no | no | | Closed chock | Maindeck Forward (Port) | 2 | DWG. No. DB00510 | 450 | 92 | no | no | | Closed chock | Maindeck Forward (Stbd) | 2 | DWG. No. DB00510 | 450 | 92 | no | no | | Closed chock | Poop Deck (Port) | 1 | DWG. No. DB00510 | 600 | 64 | no | no | | Closed chock | Poop Deck (Stbd) | 1 | DWG. No. DB00510 | 400 | 64 | no | no | | Closed chock | Forecastle | 3 | DWG. No. DB00510 | 400 | 53 | no | no | | Closed chock | Maindeck Forward (Port) | 1 | DWG. No. DB00510 | 400 | 55 | no | no | | Closed chock | Maindeck Forward (Stbd) | 1 | DWG. No. DB00510 | 400 | 55 | no | no | | Closed chock | Poop Deck (Port) | 1 | DWG. No. DB00510 | 450 | 92 | no | no | | Closed chock | Poop Deck (Stbd) | 1 | DWG. No. DB00510 | 450 | 92 | no | no | | Closed chock | Maindeck Forward (Port) | 3 | DWG. No. DB00510 | 400 | 53 | no | no | | Closed chock | Maindeck Forward (Stbd) | 3 | DWG. No. DB00510 | 400 | 53 | no | no | | Closed chock | Poop Deck (Port) | 11 | DWG. No. DB00510 | 400 | 53 | no | no | | Closed chock | Poop Deck (Stbd) | 11 | DWG. No. DB00510 | 400 | 53 | no | no | | Closed chock | Maindeck Forward (Port) | 6 | DWG. No. DB00510 | 400 | 25 | no | no | | Closed chock | Maindeck Forward (Stbd) | 6 | DWG. No. DB00510 | 400 | 25 | no | no | | Universal roller fairlead | Forecastle | 2 | DWG. No. DB00510 | 350 | 64 | no | no | | Universal roller fairlead | Poop Deck (Port) | 2 | DWG. No. DB00510 | 350 | 53 | no | no | | Universal roller fairlead | Poop Deck (Stbd) | 2 | DWG. No. DB00510 | 350 | 53 | no | no | | Closed chock | Forecastle | 1 | DWG. No. DB00510 | 600 | 204 | no | no | | Closed chock | Poop Deck (Port) | 1 | DWG. No. DB00510 | 600 | 204 | no | no |
|
| 9.5 |
Number of shackles on port / starboard cable: |
11.00 / 12.00 |
| 9.6 |
Type / SWL of Emergency Towing system forward: |
Tongue |
204 MT |
| 9.7 |
Type / SWL of Emergency Towing system aft: |
Strong Point |
204 MT |
| 9.8 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
600x450 |
| 9.9 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
204.00 MT |
| 9.10 |
What is SWL of bollard on poop deck suitable for escort tug: |
204.00 MT |
| 9.11 |
Derrick / Crane description (Number, SWL and location): |
None 1-H/H/Crane: 10 ton x 25m,Main deck)
1-P/Crane: 4 ton x 8m, B-deck,Port |
| 9.12 |
Accommodation ladder direction: |
Aft |
| 9.13 |
Does vessel have a portable gangway? If yes, state length: |
Yes |
14.55 m (Wharf Ladder) |
| 9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
Yes |
| 9.15 |
If fitted, how many chain stoppers: |
1 |
| 9.16 |
Details of Bow chain stoppers:
| Location/Number of Bow Chain Stopper | Type | Operation | SWL | Min Size of Chain | Max size of Chain |
|---|
| Port | Tongue | Manual | 204.00 | 76.00 | 76.00 |
|
| 9.17 |
Distance between the bow fairlead and chain stopper/bracket: |
2.70 m |
| 9.18 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes
|
| |
| 10.1 |
Speed |
Maximum |
Economical |
| Ballast speed: |
Kts (WSNP) (Contact Owners for Details) |
Kts (WSNP) (Contact Owners for Details) |
| Laden speed: |
Kts (WSNP) (Contact Owners for Details) |
Kts (WSNP) (Contact Owners for Details) |
| 10.2 |
What type of fuel is used for main propulsion? If other, then specify: |
Other (specify), HSFO or LSMGO |
|
What type of fuel is used for generating plant |
HFO and MGO |
| 10.3 |
Bunker Tank Capacities:
| Tank Name | Bunker Type | Tank Type | Capacity | Max Pressure |
|---|
| No.1 (P) | HFO | Main Bunker Tank | 442.20 | 3.00 | | No.1 (S) | HFO | Main Bunker Tank | 314.50 | 3.00 | | No.2 (S) | HFO | Main Bunker Tank | 135.70 | 3.00 | | Settling Tank (P) | HFO | Settling Tank | 37.20 | 3.00 | | Service Tank (P) | HFO | Service Tank | 32.20 | 3.00 | | LSFO Storage Tank (S) | Other (specify) | Main Bunker Tank | 183.30 | 3.00 | | LSFO Settling Tank (P) | Other (specify) | Settling Tank | 27.00 | 3.00 | | LSFO Service Tank (P) | Other (specify) | Service Tank | 22.87 | 3.00 | | No.1 (S) | MDO | Main Bunker Tank | 113.40 | 3.00 | | No.2 (S) | MDO | Main Bunker Tank | 165.30 | 3.00 | | Service Tank (S) | MDO | Service Tank | 41.90 | 3.00 |
If other, then specify LSFO |
| 10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
| 10.5 |
Engines |
No |
Capacity |
Make/Type |
| Main engine: |
1 |
6,875 Kw |
STX / MAN B&W 6G50ME-C9.6-HPSCR (TIER III) |
| Aux engine: |
3 |
900 Kw |
YANMAR 6EY22ALW |
| Power packs: |
4 |
426 m3/hr |
|
| Boilers: |
2 |
18.00 MT/Hr |
|
| 10.6 |
What is brake horse power of bow thruster (if fitted): |
N/A, bhp |
| 10.7 |
What is brake horse power of stern thruster (if fitted): |
N/A, bhp |
| 10.8 |
Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: |
Yes, 4.96 |
|
If No then provide reason: |
|
|
Is the EEDI rating verified by Class, 3rd Party or Owner? |
Class |
| 10.9 |
Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: |
Yes, 3.85 |
|
If No then provide reason: |
|
|
Is the EEXI rating verified by Class, 3rd Party or Owner? |
Class |
| 10.10 |
Does the vessel have a CII Rating number? If yes then provide CII rating: |
, |
|
If No then provide reason: |
|
|
Is the CII rating verified by Class, 3rd Party or Owner? |
|
| 10.11 |
Does the vessel have an EIV Rating number? If yes then provide EIV rating: |
, |
|
If No then provide reason: |
|
|
Is the EIV rating verified by Class, 3rd Party or Owner? |
|
| 10.12 |
What is the ships NOx control level (Tier I, Tier II, and Tier III)?: |
Tier III |
|
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...) |
HP Selective catalytic reduction |
| 10.13 |
Does the vessel use an Exhaust Gas Cleaning System? |
Yes |
| 10.14 |
What is the type of scrubber fitted as part of the EGCS onboard? |
Open Loop |
| |
| 11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
Yes |
| 11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
7.90 m |
| 11.3 |
Date/place of last STS operation: |
25th Oct 2025 /OPL LIMASSOL CYPRUS |
| 11.4 |
Does the vessel have a ship specific STS plan: |
|
| |
| 12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
| 12.2 |
Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details: No
|
| 12.3 |
Date and place of last Port State Control inspection: |
, |
| 12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
N/A
|
| 12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |
| 12.6 |
Date / place of last SIRE inspection: |
Sep 11, 2025 / RIGA , LATVIA |
| 12.6.1 |
Date / place of last CDI inspection: |
/ |
| 12.7 |
Additional information relating to features of the ship or operational characteristics: |
None |