← Back to Fleet
INTERTANKO CHARTERING QUESTIONNAIRE 88 - OIL/CHEMICAL Version 6 Created at Q88.com
1. General Information
1.1 Date updated: May 03, 2024
1.2 Vessel's name (IMO number): Ardmore Engineer (9654787)
1.2b Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization ,
1.3 Vessel's previous name(s) and date(s) of change: Front Mersey (Sep 12, 2016)
1.4 Date delivered / Builder (where built): Mar 10, 2014 / STX OFFSHORE & SHIPBUILDING CO. LTD.
1.5 Flag / Port of Registry: Marshall Islands / Majuro
1.6 Call sign / MMSI: V7AY5 / 538005094
1.7 Vessel's contact details (satcom/fax/email etc.): Tel: +1 203 597 3310, + 881677766917
Fax: Not available
Email: aengineer@skyfile.com
1.8 Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): Oil Tanker
1.8a If other type of vessel, please specify: N/A
1.9 Type of hull: Double Hull
Ownership and Operation
1.10 Registered owner - Full style:
IMO Number
KILMORE SHIPCO LLC
Trust Company Complex, Ajeltake Road, Ajeltake Island, Majuro, Marshall Islands MH96960
Marshall Islands
Tel: +353 21 240 9510
Fax: +353 21 240 9501
Telex: NA
Email: marine@ardmoreshipping.com,account@fuyokkk.co.jp
Web: NA
IMO: 5931152
1.11 Technical operator - Full style: Anglo Ardmore Ship Management Limited
17/F, Kingston International Centre,19 Wang Chiu, Kowloon Bay,Kowloon, Hong Kong
Hong Kong
Tel: +852 3940 7000
Fax: +852 2861 2419
Telex: NA
Email: vetting@angloardmore.com
Web: NA
Company IMO#: 5993395
1.12 Commercial operator - Full style: Ardmore Maritime Services (Asia) Pte Ltd
137 Telok Ayer Street #08-01
Singapore
Tel: +353212409500
Fax: +353212409512
Telex: NA
Email: commercialoperations@ardmoreshipping.com
Web: www.ardmoreshipping.com
1.13 Disponent owner - Full style: ARDMORE MR Pool LLC
Trust Company Complex Ajeltake Road Ajeltake Island Majuro MH 96960 Marshall Islands
Tel: +65 63299400
Fax: Not Applicable
Telex: Not Applicable
Email: commercialoperations@ardmoreshipping.com
Web: www.ardmoreshipping.com
Insurance
1.14 P & I Club - Full Style: The West of England Ship Owners Mutual Insurance Association (Luxembourg)
ASSOCIATION(LUXEMBOURG) R.C.S LUXEMBOURG 88963, 31 GRAND RULE, L-1661 LUXEMBOURG, G.D. LUXEMBOURG.
Tel: +44 20 7716 6000
Fax: +44 20 7716 6100
Telex: NA
Email: mail@westpandi.com
Web: westpandi.com
1.15 P & I Club pollution liability coverage / expiration date: 1,000,000,000 US$ Feb 20, 2025
1.16 Hull & Machinery insured by - Full Style:
(Specify broker or leading underwriter)
Amwins Global Risks
Amwins Global Risks 22 Bishopsgate London EC2N 4BQ UNITED KINGDOM
Tel: +44 20 7469 0100
1.17 Hull & Machinery insured value / expiration date: US$ (Contact Owners for details) Jul 01, 2024
Classification
1.18 Classification society: DNV
1.18a Is Classification Society an IACS member? Yes
1.19 Class notation: +1A1 Tanker for chemicals and oil, BIS BWM(E(s)) Clean COAT-PSPC(B) CSR E0 ESP ETC SPM TMON VCS(2, B)
1.20 Does the vessel have any open conditions of Class?? If yes List all open conditions: No
1.20a Does the vessel have any Memoranda of Class? If yes, list details: No
1.21 If classification society changed, name of previous and date of change: , Not Applicable
1.22 Does the vessel have ice class? If yes, state what level: No, Not applicable
1.23 Date / place of last dry-dock: Apr 02, 2024 / Chengxi Shipyard , Jiyangin, China
1.24 Date next dry dock due / next annual survey due: Mar 10, 2029
1.25 Date of last special survey / next special survey due: Apr 02, 2024 Mar 10, 2029
1.26 If ship has Condition Assessment Program (CAP), what is the latest overall rating: No, (Not Applicable)
Dimensions
1.27 Length overall (LOA): 183.00 m
1.28 Length between perpendiculars (LBP): 175.90 m
1.29 Extreme breadth (Beam): 32.20 m
1.30 Moulded depth: 19.10 m
1.31 Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: 49.48 m 0 m (Not Applicable)
1.32 Distance bridge front to center of manifold: 55.54 m
1.33 Bow to center manifold (BCM) / Stern to center manifold (SCM): 91.86 m 91.14 m
1.34 Parallel body distances: Lightship Normal Ballast Summer Dwt
Forward to mid-point manifold: 27.80 m 35.86 m 35.86 m
Aft to mid-point manifold: 22.76 m 41.27 m 51.96 m
Parallel body length: 50.56 m 77.13 m 87.82 m
Tonnages
1.35 Net Tonnage: 13,738.00
1.36 Gross Tonnage / Reduced Gross Tonnage (if applicable): 30,069.00 24,067
1.37 Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): 30,608.21 25,776.15
1.38 Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): Yes, 24,958.00
Loadline Information
1.39 Loadline Freeboard Draft Deadweight Displacement
Summer: 5.813 m 13.315 m 49,420.40 MT 60,562.90 MT
Winter: 6.09 m 13.038 m 48,060.62 MT 59,203.12 MT
Tropical: 5.536 m 13.592 m 50,939.64 MT 62,082.14 MT
Normal loaded condition: m m MT MT
Lightship: 16.32 m 2.79 m Not Applicable 11,142.70 MT
Normal Ballast Condition: 10.49 m 8.61 m 25,711.00 MT 36,854.00 MT
Segregated Ballast Condition: 10.49 m 8.61 m 25,711.00 MT 36,854.00 MT
1.40 FWA/TPC at summer draft: 292 mm 52 MT
1.41 Have multiple deadweights been assigned? If yes, list all assigned deadweights: Yes
Assigned DWT 1: 49,420.40
Assigned DWT 2: 44,999.00
Assigned DWT 3: 39,999.00
Assigned DWT 4:
Assigned DWT 5:
1.42 Constant (excluding fresh water): 150 MT
1.43 What is the company guidelines for Under Keel Clearance (UKC) for this vessel? After making allowance for factors like squat, swell, change of water density, list, heel and prevailing weather conditions including other variables such as allowance due to, siltation and reduced depths over pipelines and Ice accretion.: A. While Underway: 1.Pilotage waters, Channels, Fairways, Rivers.: 10% of static draft. 2.Coastal Waters when transiting at distance less than 25NM from coastline : 20% of Max Static Draft. 3.Open Waters When transiting more than or equal to 25 NM from coastline: 50% of static draft. B. While In Port 1. Alongside / Engaged in mooring or un-mooring.: 1.5% of Vessel's Extreme Breadth or 0.3m, whichever is greater. 2. CBM, SBM : not less than 20% of vessels static draft. 3a.At Anchor Unprotected Waters : 20 % of vessels static draft. 3b.At Anchor Protected/ Sheltered Waters : 10 % of vessels static draft. *** If Local requirements (charterers, port, canal authorities) have rules that are stricter than the above criteria then adhere to such higher UKC allowances.
1.44 What is the max height of mast above waterline (air draft) Full Mast Collapsed Mast
Summer deadweight: 36.125 m 0 m
Normal ballast: 41.77 m 0 m
Lightship: 46.69 m 0 m
 
2. CERTIFICATES Issued Last Annual Last Intermediate Expires
2.1 Safety Equipment Certificate (SEC): Apr 02, 2024 Not Applicable Mar 10, 2029
2.2 Safety Radio Certificate (SRC): Apr 02, 2024 Not Applicable Mar 10, 2029
2.3 Safety Construction Certificate (SCC): Apr 02, 2024 Not Applicable Mar 10, 2029
2.4 International Loadline Certificate (ILC): Apr 02, 2024 Mar 10, 2029
2.5 International Oil Pollution Prevention Certificate (IOPPC): Apr 02, 2024 Not Applicable Mar 10, 2029
2.6 International Ship Security Certificate (ISSC): Dec 10, 2021 Not Applicable Not Applicable Feb 10, 2027
2.7 Maritime Labour Certificate (MLC): Dec 10, 2021 Not Applicable Not Applicable Feb 10, 2027
2.8 Minimum Safe Manning Certificate (MSM): Jun 18, 2019 Not Applicable Not Applicable Not Applicable
2.9 ISM Safety Management Certificate (SMC): Dec 10, 2021 Not Applicable Not Applicable Feb 10, 2027
2.10 Document of Compliance (DOC): Sep 02, 2021 Sep 12, 2023 Oct 23, 2026
2.11 USCG Certificate of Compliance (USCGCOC): Apr 03, 2023 Apr 03, 2023 Not Applicable Apr 03, 2025
2.12 Civil Liability Convention (CLC) 1992 Certificate: Feb 20, 2024 Not Applicable Not Applicable Feb 20, 2025
2.13 Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: Feb 20, 2024 Not Applicable Not Applicable Feb 20, 2025
2.14 Liability for the Removal of Wrecks Certificate (WRC): Feb 20, 2024 Not Applicable Not Applicable Feb 20, 2025
2.15 U.S. Certificate of Financial Responsibility (COFR): Sep 01, 2022 Not Applicable Not Applicable Sep 01, 2025
2.16 Certificate of Class (COC): Apr 02, 2024 Not Applicable Not Applicable Mar 10, 2029
2.17 Certificate of Registry (COR): Sep 17, 2019 Not Applicable Not Applicable Permanent
2.18 International Sewage Pollution Prevention Certificate (ISPPC) Apr 02, 2024 Not Applicable Not Applicable Mar 10, 2029
2.19 Certificate of Fitness (COF): Apr 02, 2024 Not Applicable Not Applicable Mar 10, 2029
2.20 International Energy Efficiency Certificate (IEEC): Mar 10, 2029 Not Applicable Not Applicable Not Applicable
2.21 International Air Pollution Prevention Certificate (IAPPC): Apr 02, 2024 Mar 10, 2029
2.22 Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): Dec 03, 2023 Not Applicable Not Applicable Jun 02, 2024
2.23 Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: Yes,
Documentation
2.24 Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: Yes
2.25 Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? Yes
2.26 Is the ITF Special Agreement on board (if applicable)? Yes
2.27 ITF Blue Card expiry date (if applicable): Sep 11, 2024
 
3. CREW
3.1 Nationality of Master: Indian
3.2 Number and nationality of Officers: 9 Indian, Romanian
3.3 Number and nationality of Crew:
Nationality Count
INDIA10
3.4 What is the common working language onboard: English
3.5 Do officers speak and understand English? Yes
3.6 If Officers/ratings employed by a Manning Agency - Full style: Officers:
Company Name Address Phone Fax Email
ANGLO ARDMORE SHIP MANAGEMENT LTD17/F Kingston International Centre19 Wang Chiu Road, Kowloon Bay, Kowloon, Hong Kong+852 3940 7000+852 2861 2419operations@angloardmore.com


Ratings:
Company Name Address Phone Fax Email
 
4. FOR USA CALLS
4.1 Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? Yes
4.2 Qualified individual (QI) - Full style: O'Brien's Oil Pollution Service
O'Briens Response Management Inc New Jersey Office 103 Morgan Lane Suite 103, Plainsboro, NJ 08536 USA
Tel: +1-985-781-0804
Fax: +1-985-781-0580
Telex: 49617361 OOPS UI
Email: commandcenter@obriensrm.com
Web: NA
4.3 Oil Spill Response Organization (OSRO) - Full style: National Response Corporation
3500 Sunrise Highway Suite T103 Great River NY 11739, USA
Tel: +1 631 224 9141 (24 hrs) +1 800 899 4672
Fax: +1 631 224 9086 / 9082
Telex: NA
Email: iocdo@nrcc.com
Web: NA
4.4 Salvage and Marine Firefighting Services (SMFF) - Full Style: RESOLVE MARINE GROUP, INC.
1510 SE 17th Street, Suite 400 Fort Lauderdale, FL 33316
Tel: +1 954-764-8700
Fax: +1-954-764-8724
Email: opa90@resolvemarine.com
Web: www.resolvemarine.com
 
5. SAFETY/HELICOPTER
5.1 Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): Yes
ISO 9001 : 2015 / ISO 14001:2015/ ISO 45001:2018
5.2 Can the ship comply with the ICS Helicopter Guidelines? Yes
5.2.1 If Yes, state whether winching or landing area provided: Winching
5.2.2 If Yes, what is the diameter of the circle provided: 5.00 m
 
6. COATING/ANODES
6.1
Cargo tanks:
Tank ID Tank PSC Tank Type Constr Coated Y/N Coating Type Extent Condition Date Insp date Insp Freq
1P3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-07Annual
1S3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-07Annual
2P3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-07Annual
2S3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-08Annual
3P3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-08Annual
3S3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-07Annual
4P3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-08Annual
4S3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-08Annual
5P3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-07Annual
5S3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-07Annual
6P3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-07Annual
6S3Mild SteelyesEpoxyFull TankGood2014-03-102024-03-07Annual
1PSlopMild SteelyesEpoxyFull TankGood2014-03-102024-03-11Annual
2SSlopMild SteelyesEpoxyFull TankGood2014-03-102024-03-07Annual


Anodes Fitted: No
Ballast tanks:
ID Coated? Type Extent Condition Coating date Insp date Insp freq
1P WBTyesEpoxyFull TankGood2014-03-102023-11-22Annual
1S WBTyesEpoxyFull TankGood2014-03-102023-11-22Annual
2P WBTyesEpoxyFull TankGood2014-03-102023-11-21Annual
2S WBTyesEpoxyFull TankGood2014-03-102023-11-21Annual
3P WBTyesEpoxyFull TankGood2014-03-102023-11-22Annual
3S WBTyesEpoxyFull TankGood2014-03-102023-11-21Annual
4P WBTyesEpoxyFull TankGood2014-03-102023-11-23Annual
4S WBTyesEpoxyFull TankGood2014-03-102023-11-23Annual
5P WBTyesEpoxyFull TankGood2014-03-102023-11-24Annual
5S WBTyesEpoxyFull TankGood2014-03-102023-11-23Annual
6P WBTyesEpoxyFull TankGood2014-03-102023-11-24Annual
6S WBTyesEpoxyFull TankGood2014-03-102023-11-24Annual


Anodes Fitted: Yes
 
7. BALLAST
7.1 Ballast Handling Data
Number Type Prime mover type Capacity (m3/hr)Head (bar)
2SUBMERGED CENTRIFUGAL PUMPHYDRAULIC700.0025.00
1EDUCTORWATER DRIVEN100.000.00
Ballast Water Management Systems (BWMS)
7.2 Does the vessel comply with D1 or D2 performance standards? D2
7.3 Does the vessel have a Ballast Water Treatment System (BWTS) fitted? Yes
7.4 What type of BWTS fitted? If other system fitted, please advise: UV Light, FILTRATION + UVLIGHT
7.5 Name of manufacturer of BWTS: OPTIMARIN
7.6 Does the BWTS have IMO type approval? Yes
7.7 Is the BWTS of a USCG approved type? Yes
 
8. Cargo- Oil/Chem
Double Hull Vessels
8.1 Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: Yes, Solid
Tank Capacities
8.2 Cargo Tank Capacities at 98% Full - Centre:


Total Centre: 0 m3

Cargo Tank Capacities at 98% Full - Wing:
Tank Number Capacity (m3)P/S
12932.98Port
12933.13Stbd
24544.24Port
24543.83Stbd
34754.92Port
34754.89Stbd
44756.47Port
44753.21Stbd
54754.69Port
54756.90Stbd
63968.13Port
63957.70Stbd


Total Wing: 51,411.09 m3

Deck Tank Capacities at 98% Full:


Total Deck: m3
8.2.1 Capacity (98%) of each natural segregation with double valve (specify tanks): CARGO TANKS - 98% SEG No.1 : 5866.084 cbm SEG No.2 : 9088.128 cbm SEG No.3 : 9509.822 cbm SEG No.4 : 9509.626 cbm SEG No.5 : 9511.586 cbm SEG No.6 : 7925.848 cbm
8.2.2 IMO class (Oil/Chemical Ship Type 1, 2 or 3): IMO 3
8.3 Slop tank capacities (98%):
Tank Number Capacity (m3)P/S
SLOP PORT693.85Port
SLOP STBD684.32Stbd


Total: 1,378.17 m3
8.3.1 Specify segregations which slops tanks belong to and their capacity with double valve: N/A
8.3.2 Residual/Retention oil tank(s) capacity (98%), if applicable: N/A
SBT Vessels
8.3.3 What is total SBT capacity and percentage of SDWT vessel can maintain? N/A N/A
8.3.4 Does vessel meet the requirements of MARPOL Annex I Reg 18.2: N/A
Cargo Handling and Pumping Systems
8.4 How many grades/products can vessel load/discharge with double valve segregation: 7
8.4.1 State type of cargo containment (integral, independent, gravity or pressure tanks):
8.5 Are there any cargo tank filling restrictions?
If yes, specify number of slack tanks, max s.g., ullage restrictions etc.:
Yes
Max filling height for S.G. 1.53 = 65.8% of Cargo tank height Max filling height(%) for cargo density from 1.025 to 1.53 = (1.025 / (S.G. of cargo) x 100 Unrestricted filling height cargo S.G. upto 1.025.
8.6 Max loading rate for homogenous cargo With VECS Without VECS
Loaded per manifold connection: 1,230 m3/hr 2,196 m3/hr
Loaded simultaneously through all manifolds: 7,980 m3/hr 7,980.00 m3/hr
Cargo Control Room
8.7 Is ship fitted with a Cargo Control Room (CCR)? Yes
8.8 Can tank innage / ullage be read from the CCR? Yes
Gauging and Sampling
8.9 Is gauging system certified and calibrated? If no, specify which ones are not calibrated: Yes, NA
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): Closed
What type of fixed closed tank gauging system is fitted: N/A
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves? No,
Are high level alarms fitted to the cargo tanks? If Yes, indicate whether to all tanks or partial: N/A, N/A
8.9.1 Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? N/A
8.9.2 Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: Yes, Tanktech UTI tapes through Vapour Locks
8.10 Number of portable gauging units (example- MMC) on board: 3
Vapor Emission Control System (VECS)
8.11 Is a Vapour Emission Control System (VECS) fitted? Yes
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? Yes
If fitted, how many vapor return segregations can the vessel maintain simultaneously? 1
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority Yes, DNV
8.12 Number/size of VECS manifolds (per side): 2 300 mm
8.13 Number / size / type of VECS reducers: 16" x 12": 2 Nos. 12" x 10": 1 No. 12"x 8 " - 1 No. 12"x 6 " - 1 No.
Venting
8.14 State what type of venting system is fitted: HIGH VELOCITY PV VALVES
Cargo Manifolds and Reducers
8.15 Total number/size of cargo manifold connections on each side:
No.: 7 (7 (Including Slop manifold.) / 400 Millimetres)

Size:
Manifold PCS Size Unit Pressure Rating Unit PR Standard
7P16Inches24BarANSI
7S16Inches24BarANSI
8.15.1 Is the vessel fitted with a fixed common line? Yes
What is the number of common cargo connections per side? 7
What is the size of common cargo connections? 400 mm
8.16 What type of valves are fitted at manifold: Butterfly,
8.17 What is the material/rating of the manifold: Mild Steel / ANSI 150 PSI
8.17.1 Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? N/A
8.18 Distance between cargo manifold centers: 2,000.00 mm
8.19 Distance ships rail to manifold: 4,600.00 mm
8.20 Distance manifold to ships side: 4,600.00 mm
8.21 Top of rail to center of manifold: 4,600.00 mm
8.22 Distance main deck to center of manifold: 2,100.00 mm
8.23 Spill tank grating to center of manifold: 900.00 mm
8.24 Manifold height above the waterline in normal ballast / at SDWT condition: 14.00 m 7.90 m
8.25 Number / size / type of reducers: 12 x 250/400mm (10/16")
2 x 200/400mm (8/16")
2 x 250/150mm (10/6")
6 x 250/300mm (10/12")
6 x 250/200mm (10/8")
ANSI
8.26 Is vessel fitted with a stern manifold? If yes, state size: No, 0 mm
Heating
8.27 Provide details of Heating Coils/Heat Exchangers
Tank ID P/C/S/ Decktank/ Other Heat exchanger Internal/External External ducts Heating coils Heating coil sets Height of the heating coils above tank bottom (mm)total heating surface (m2)Ratio of the heating surface Welded or coupled Material
1PyesExternalnono00.000.000.00CoupledSS
1SyesExternalnono00.000.000.00CoupledSS
2PyesExternalnono00.000.000.00CoupledSS
2SyesExternalnono00.000.000.00CoupledSS
3PyesExternalnono00.000.000.00CoupledSS
3SyesExternalnono00.000.000.00CoupledSS
4PyesExternalnono00.000.000.00CoupledSS
4SyesExternalnono00.000.000.00CoupledSS
5PyesExternalnono00.000.000.00CoupledSS
5SyesExternalnono00.000.000.00CoupledSS
6PyesExternalnono00.000.000.00CoupledSS
6SyesExternalnono00.000.000.00CoupledSS
6SyesExternalnono00.000.000.00CoupledSS
8.27.1 Is a Thermal Oil Heating system fitted? If yes, identify tanks? No,
8.28 Maximum temperature cargo can be loaded / maintained: 70.0 °C / 158.0 °F 60 °C / 140 °F
8.28.1 Minimum temperature cargo can be loaded / maintained:
Inert Gas and Crude Oil Washing
8.29 Is an Inert Gas System (IGS) fitted / operational? Yes / Yes
8.29.1 Is a Crude Oil Washing (COW) installation fitted / operational? N/A / N/A
8.30 Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: IG Generator
8.30.1 If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: N/A
Cargo Pumps
8.31 How many cargo pumps can be run simultaneously at full capacity: 6
8.32 Cargo Pump Data
Pump Identity Pump Location Type Type of prime mover Capacity At what head?
SD 200Cargo TankCentrifugalHydraulic550.00120.00
SD 150Cargo TankCentrifugalHydraulic300.00120.00
8.33 Is at least one emergency portable cargo pump provided? Yes
Tank Cleaning Systems
8.34 Is tank cleaning equipment fixed in cargo tanks? Yes
8.35 Is portable tank cleaning equipment provided? Yes
8.36 Tank washing pump capacity: 100.00 m3/hr
8.37 Is a washing water heater fitted? If yes is it operational and state max washing water temperature: Yes,
70.00 °C
8.38 What is the maximum number of machines that can be operated at their designed max pressure? 4
Other Deck Equipment
8.39 Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? Yes,
8.40 Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? Yes,
8.41 Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: No, N/A
m3/hr
8.42 Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: No, N/A
8.43 Is steam available on deck? Yes
 
9. MOORING
9.1 Provide details for Mooring Ropes, Wires, Tails and Shackles
Type Location and Identity Material Diameter/size Length LDBF(100-105 % of SDMBL (Tonnes)) TDBF(125-130 % of SDMBL (Tonnes) SWL (tonnes) WLL (tonnes) (50-55% of Max LDBF) Certificate No. Installed Date Reversed Date Renewal2 Date Status of line/tail Condition of line/tail
RopesFWD PORT LOOSE ROPEMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600076562020-08-032020-08-032025-08-02In UseSuitable
RopesFWD STBD LOOSE ROPEMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600034072020-08-032020-08-032025-08-02In UseSuitable
RopesAFT PORT LOOSE ROPEMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600076572020-08-032020-08-032025-08-03In UseSuitable
RopesAFT STBD LOOSE ROPEMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600061592020-08-032020-08-032025-08-02In UseSuitable
RopesFWD SPARE ROPEMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4521600068142023-11-292023-11-292028-11-28SpareSuitable
RopesAFT SPARE ROPEMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4521600068152023-11-292023-11-292028-11-28SpareSuitable
RopesW1 OUTERMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600053452019-08-312022-03-172024-08-30In UseSuitable
RopesW1 INNERMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600045952019-08-312022-03-172024-08-30In UseSuitable
RopesW2 INNERMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600045922019-08-312022-03-172024-08-30In UseSuitable
RopesW2 OUTERMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600046002019-08-312022-03-172024-08-30In UseSuitable
RopesM1 FWDMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600046032019-08-312022-03-172024-08-30In UseSuitable
RopesM1 AFTMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600045982019-08-312022-03-172024-08-30In UseSuitable
RopesM2 FWDMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600045972019-08-312022-03-172024-08-30In UseSuitable
RopesM2 AFTMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600053432019-08-312022-03-172024-08-30In UseSuitable
RopesM3 INNERMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600045942019-08-312022-03-172024-08-30In UseSuitable
RopesM3 OUTERMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600046022019-08-312022-03-172024-08-30In UseSuitable
RopesM4 OUTERMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600045932019-08-312022-03-172024-08-30In UseSuitable
RopesM4 INNERMIXED POLYOLEFINS(B5 YARN) AND HT PES55.00220.0056.9073.9056.9028.4519600045962019-08-312022-03-172024-08-30In UseSuitable
9.2 Details of winches and brake testing including rendering loads
Mooring winch Location Split Drum Motive Power Remote Operational controls Heaving power Hauling Speed Type of Brake Designed Brake Max holding load (ISO) (80% of SDMB Operational brake holding load (60% of SDMBL) Date of last brake test Brake Rendering load Frequency of testing brakes
1yesHydraulicno15.000.25Manual45.5034.102024-04-0134.10ANNUAL
2yesHydraulicno15.000.25Manual45.5034.102024-04-0134.10ANNUAL
3yesHydraulicno15.000.25Manual45.5034.102023-08-0934.10ANNUAL
4yesHydraulicno15.000.25Manual45.5034.102023-08-0934.10ANNUAL
5yesHydraulicno15.000.25Manual45.5034.102023-08-0934.10ANNUAL
6yesHydraulicno15.000.25Manual45.5034.102023-08-0934.10ANNUAL
9.3 Provide Details of Mooring bollards and bitts
Location Identity No Certificate Number Size (mm) SWL (tonnes)
Forecastle1BOLLARD DIN TYPE40064
Forecastle2BOLLARD DIN TYPE40057
Forecastle3BOLLARD DIN TYPE40064
Maindeck Forward (Port)1BOLLARD DIN TYPE40064
Maindeck Forward (Stbd)1BOLLARD DINTYPE40064
Maindeck Forward (Port)2BOLLARD DIN TYPE40057
Maindeck Forward (Stbd)2BOLLARD DIN TYPE40057
Maindeck Forward (Port)3BOLLARD DIN TYPE40057
Maindeck Forward (Stbd)3BOLLARD DIN TYPE40057
Maindeck Forward (Port)6BOLLARD DIN TYPE40057
Maindeck Forward (Stbd)7BOLLARD DIN TYPE40057
Poop Deck (Port)1BOLLARD DIN TYPE40064
Poop Deck (Port)2BOLLARD DIN TYPE40064
Poop Deck (Stbd)1BOLLARD DIN TYPE40064
Poop Deck (Stbd)2BOLLARD DIN TYPE40064
9.4 Provide details of Mooring Fairleads/Chocks
Type Location Identity No Certificate Size (mm) SWL (tonnes) Modifications If yes, are modifications class approved?
Closed chockForecastle1BWF01600200noyes
Closed chockForecastle2PC-F01-252692noyes
Closed chockForecastle6CCF01-0635857noyes
Panama typeMaindeck Forward (Port)1PC M01 126064noyes
Panama typeMaindeck Forward (Stbd)1PC M01 226064noyes
Closed chockMaindeck Forward (Port)3CC M01-0340057noyes
Closed chockMaindeck Forward (Stbd)3CCM01-03 240057noyes
Closed chockMaindeck Forward (Port)3CC M04 06 10 152692noyes
Closed chockMaindeck Forward (Stbd)3CC M04 06 10 252692noyes
Closed chockMaindeck Forward (Port)1CC M05-140025noyes
Closed roller typeMaindeck Forward (Stbd)1CCM05 240025noyes
Closed chockMaindeck Forward (Port)3CC M07-09 140057noyes
Closed chockMaindeck Forward (Stbd)3CCM07-09 240057noyes
Panama typePoop Deck (Port)4PCA01-04 136064noyes
Panama typePoop Deck (Stbd)4PCA01-04 236064noyes
Closed chockPoop Deck (Port)4CCA01-04 140057noyes
Closed chockPoop Deck (Stbd)4CC A01-04 240057noyes
Anchors/Emergency Towing System
9.5 Number of shackles on port / starboard cable: 11.00 / 12.00
9.6 Type / SWL of Emergency Towing system forward: CHAIN AND STOPPER 200 MT
9.7 Type / SWL of Emergency Towing system aft: TOWING PENNANT 200 MT
9.8 What is size of closed chock and/or fairleads of enclosed type on stern: 650MM X 450 MM
Escort Tug
9.9 What is SWL of closed chock and/or fairleads of enclosed type on stern: 200.00 MT
9.10 What is SWL of bollard on poop deck suitable for escort tug: 200.00 MT
Lifting Equipment/Gangway
9.11 Derrick / Crane description (Number, SWL and location): Cranes: 1 x 10 Tonnes
Centre
9.12 Accommodation ladder direction: Aft
9.13 Does vessel have a portable gangway? If yes, state length: Yes 12.135 m
Single Point Mooring (SPM) Equipment
9.14 Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? Yes
9.15 If fitted, how many chain stoppers: 1
9.16 Details of Bow chain stoppers:
Location/Number of Bow Chain Stopper Type Operation SWL Min Size of Chain Max size of Chain
PortTongueManual200.0076.0076.00
9.17 Distance between the bow fairlead and chain stopper/bracket: 3.50 m
9.18 Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: Yes
NA
 
10. PROPULSION
10.1 Speed Maximum Economical
Ballast speed: Kts (WSNP) (Contact Owners for Details) Kts (WSNP) (Contact Owners for Details)
Laden speed: Kts (WSNP) (Contact Owners for Details) Kts (WSNP) (Contact Owners for Details)
10.2 What type of fuel is used for main propulsion? If other, then specify: HFO, VLSFO
What type of fuel is used for generating plant IFO 380 CST
10.3 Bunker Tank Capacities:
Tank Name Bunker Type Tank Type Capacity Max Pressure
NO.1 HFO STOR.POther (specify)Main Bunker Tank516.603.00
NO.1 HFO STOR SOther (specify)Main Bunker Tank521.203.00
LSHFO STOR TKOther (specify)Main Bunker Tank175.703.00
NO.1 MGO STOR TKOther (specify)Main Bunker Tank57.013.00
MDO STOR TKOther (specify)Main Bunker Tank188.303.00
NO.2 MGO STOR TKOther (specify)Main Bunker Tank101.703.00
HFO SETT TKHFOSettling Tank59.632.00
HFO SERV TKHFOService Tank59.632.00
LSHF SETT TKOther (specify)Settling Tank38.512.00
LSHFO SERV TKOther (specify)Service Tank38.512.00


If other, then specify VLSFO AND LSMGO
10.4 Is vessel fitted with fixed or controllable pitch propeller(s): Fixed
10.5 Engines No Capacity Make/Type
Main engine: 1 7,260 Kw STX MAN6S50ME-B9.2 (NOX TIER II)
Aux engine: 3 960 Kw STX MAN B&W 6L23/30H
Power packs: 4 0 m3/hr Variable Speed Drive System
Boilers: 1 18.00 MT/Hr Kangrim Heavy Industries, Type: PB0301AS12
Bow/Stern Thruster
10.6 What is brake horse power of bow thruster (if fitted): No, 0 bhp
10.7 What is brake horse power of stern thruster (if fitted): No, 0 bhp
Environmental/Emissions
10.8 Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: No,
If No then provide reason: Vessel exempt under Reg 22.1as it is not a new ship as defined in Regn 2.2.18
Is the EEDI rating verified by Class, 3rd Party or Owner?
10.9 Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: Yes, 4.68
If No then provide reason: NA
Is the EEXI rating verified by Class, 3rd Party or Owner? Class
10.10 Does the vessel have a CII Rating number? If yes then provide CII rating: Yes, B
If No then provide reason: NA
Is the CII rating verified by Class, 3rd Party or Owner? Class
10.11 Does the vessel have an EIV Rating number? If yes then provide EIV rating: ,
If No then provide reason:
Is the EIV rating verified by Class, 3rd Party or Owner?
10.12 What is the ships NOx control level (Tier I, Tier II, and Tier III)?: Tier II
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...)
Exhaust Gas Cleaning System/Scrubber
10.13 Does the vessel use an Exhaust Gas Cleaning System? No
10.14 What is the type of scrubber fitted as part of the EGCS onboard?
 
11. SHIP TO SHIP TRANSFER
11.1 Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? Yes
11.2 What is maximum outreach of cranes / derricks outboard of the ship's side: 8.90 m
11.3 Date/place of last STS operation: 29 Sep 2023/ Chattogram
11.4 Does the vessel have a ship specific STS plan:
 
12. RECENT OPERATIONAL HISTORY
12.1 Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last):
12.2 Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details:
No

12.3 Date and place of last Port State Control inspection: Dec 08, 2023, Fujairah
12.4 Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: No
Not Applicable
12.5 Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:

*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis.
Contact owner for details.
12.6 Date / place of last SIRE inspection: Jan 06, 2024 / Korea, Republic Of Yeosu [KRYOS]
12.6.1 Date / place of last CDI inspection: Not Applicable / Not Applicable
12.7 Additional information relating to features of the ship or operational characteristics: None