1.1 |
Date updated: |
Nov 16, 2024 |
1.2 |
Vessel's name (IMO number): |
Ardmore Dauntless (9707388) |
1.2b |
Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization |
, |
1.3 |
Vessel's previous name(s) and date(s) of change: |
Not Applicable |
1.4 |
Date delivered / Builder (where built): |
Feb 13, 2015 / HYUNDAI MIPO DOCK |
1.5 |
Flag / Port of Registry: |
Marshall Islands / Majuro |
1.6 |
Call sign / MMSI: |
V7JI3 / 538006053 |
1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: +1 646 817 3622 |
Fax: |
Email: Adauntless@skyfile.com |
1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
Oil Tanker |
1.8a |
If other type of vessel, please specify: |
|
1.9 |
Type of hull: |
Double Hull |
1.10 |
Registered owner - Full style: IMO Number |
WIGHT SHIPCO LLC TRUST COMPANY COMPLEX
AJELTAKE ROAD, AJELTAKE ISLAND
MAJURO, MARSHALL ISLANDS
MH 96960 Marshall Islands Tel: +353212409500 Fax: +353 212409501 Telex: NA Email: marine@ardmoreshipping.com Web: www.ardmoreshipping.com IMO: 5837792 |
1.11 |
Technical operator - Full style: |
Anglo Ardmore Ship Management Limited 17/F Kingston International Centre 19 Wang Chiu Road, Kowloon Bay, Kowloon, Hong Kong Hong Kong Tel: +852 3940 7000 Fax: +852 2861 2419 Telex: NA Email: vetting@angloardmore.com Web: NA Company IMO#: 5993395 |
1.12 |
Commercial operator - Full style: |
Ardmore Maritime Services (Asia) Pte Ltd 137 Telok Ayer Street
#08-01, Singapore Singapore Tel: +353 212409500 Email: commercialoperations@ardmoreshipping.com Web: www.ardmoreshipping.com |
1.13 |
Disponent owner - Full style: |
Ardmore MR Pool LLC Trust Company Complex, Ajeltake Road, Ajeltake Island, Majuro, MH 96960, Marshall Islands Tel: +65 63299400 Email: commercialoperations@ardmoreshipping.com Web: www.Ardmoreshipping.com |
1.14 |
P & I Club - Full Style: |
The West of England Ship Owners Mutual Insurance Association (Luxembourg) Tower Bridge Court
226 Tower Bridge Road
London
SE1 2UP Tel: +44 20 7716 6000 Fax: +44 20 7716 6100 Telex: NA Email: mail@westpandi.com Web: westpandi.com |
1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2025 |
1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Amwins Global Risks 22 Bishopsgate
London
EC2N 4BQ
UNITED KINGDOM Tel: +44 20 7469 0100 |
1.17 |
Hull & Machinery insured value / expiration date: |
US$ (Contact Owners for details) |
Jan 01, 2026 |
1.18 |
Classification society: |
Lloyds Register |
1.18a |
Is Classification Society an IACS member? |
Yes |
1.19 |
Class notation: |
'100A1, Double Hull Oil and Chemical Tanker, Ship Type 2 and Ship Type 3, CSR, ESP, *IWS, LI, SPM 4, Ship Right(ACS(B), CM), LMC, IGS, UMS, BWTS* with descriptive notes COW(LR), ETA, Ship Right(SERS, SCM, BWNP (T)).. |
1.20 |
Does the vessel have any open conditions of Class?? If yes List all open conditions: |
No
|
1.20a |
Does the vessel have any Memoranda of Class? If yes, list details: |
No
|
1.21 |
If classification society changed, name of previous and date of change: |
, Not Applicable |
1.22 |
Does the vessel have ice class? If yes, state what level: |
No, NA |
1.23 |
Date / place of last dry-dock: |
Jan 14, 2020 / SEMBCORP MARINE/ SINGAPORE |
1.24 |
Date next dry dock due / next annual survey due: |
Feb 12, 2025 |
Feb 12, 2025 |
1.25 |
Date of last special survey / next special survey due: |
Jan 22, 2020 |
Feb 12, 2025 |
1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, (NA) |
1.27 |
Length overall (LOA): |
184.06 m |
1.28 |
Length between perpendiculars (LBP): |
176.00 m |
1.29 |
Extreme breadth (Beam): |
27.44 m |
1.30 |
Moulded depth: |
17.20 m |
1.31 |
Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: |
47.19 m |
0 m (NA) |
1.32 |
Distance bridge front to center of manifold: |
56.77 m |
1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
93.25 m |
90.81 m |
1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
Forward to mid-point manifold: |
36.24 m |
44.99 m |
45.258 m |
Aft to mid-point manifold: |
32.27 m |
44.72 m |
55.915 m |
Parallel body length: |
68.50 m |
89.72 m |
101.173 m |
1.35 |
Net Tonnage: |
9,985.00 |
1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
23,702.00 |
18,236 |
1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
25,003.21 |
20,689.86 |
1.38 |
Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): |
, 19,770.00 |
1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
Summer: |
5.674 m |
11.555 m |
37,764 MT |
46,771 MT |
Winter: |
5.914 m |
11.315 m |
36,674 MT |
45,681 MT |
Tropical: |
5.434 m |
11.795 m |
38,858 MT |
47,865 MT |
Normal loaded condition: |
5.67 m |
11.55 m |
37,764.00 MT |
46,771.00 MT |
Lightship: |
14.69 m |
2.54 m |
Not Applicable |
9,007.00 MT |
Normal Ballast Condition: |
10.38 m |
6.85 m |
17,116.90 MT |
26,123.90 MT |
Segregated Ballast Condition: |
10.28 m |
6.95 m |
17,549.00 MT |
26,556.00 MT |
1.40 |
FWA/TPC at summer draft: |
257 mm |
45.55 MT |
1.41 |
Have multiple deadweights been assigned? If yes, list all assigned deadweights: |
Yes Assigned DWT 1: 37,764.00 Assigned DWT 2: 34,999.00 Assigned DWT 3: Assigned DWT 4: Assigned DWT 5: |
1.42 |
Constant (excluding fresh water): |
148 MT |
1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
After making allowance for factors like squat, swell, change of water density, list, heel and prevailing weather conditions including other variables such as allowance due to, siltation and reduced depths over pipelines and Ice accretion.:
A. While Underway:
1.Pilotage waters, Channels, Fairways, Rivers.: 10% of static draft.
2.Coastal Waters when transiting at distance less than 25NM from coastline : 20% of Max Static Draft.
3.Open Waters When transiting more than or equal to 25 NM from coastline: 50% of static draft.
B. While In Port
1. Alongside / Engaged in mooring or un-mooring.: 1.5% of Vessel's Extreme Breadth or 0.3m, whichever is greater.
2. CBM, SBM : not less than 20% of vessels static draft.
3a.At Anchor Unprotected Waters : 20 % of vessels static draft.
3b.At Anchor Protected/ Sheltered Waters : 10 % of vessels static draft.
*** If Local requirements (charterers, port, canal authorities) have rules that are stricter than the
above criteria then adhere to such higher UKC allowances. |
1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
Summer deadweight: |
35.64 m |
0 m |
Normal ballast: |
39.87 m |
0 m |
Lightship: |
47.19 m |
0 m |
|
2.1 |
Safety Equipment Certificate (SEC): |
Mar 28, 2022 |
Feb 01, 2024 |
May 01, 2023 |
Feb 12, 2025 |
2.2 |
Safety Radio Certificate (SRC): |
Jan 22, 2020 |
Feb 01, 2024 |
Apr 25, 2023 |
Feb 12, 2025 |
2.3 |
Safety Construction Certificate (SCC): |
Mar 28, 2022 |
Feb 01, 2024 |
Jan 18, 2023 |
Feb 12, 2025 |
2.4 |
International Loadline Certificate (ILC): |
Jan 22, 2020 |
Feb 01, 2024 |
|
Feb 12, 2025 |
2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Sep 21, 2022 |
Feb 01, 2024 |
Jan 18, 2023 |
Feb 12, 2025 |
2.6 |
International Ship Security Certificate (ISSC): |
May 06, 2020 |
Not Applicable |
Feb 13, 2023 |
Jun 19, 2025 |
2.7 |
Maritime Labour Certificate (MLC): |
May 06, 2020 |
Not Applicable |
Feb 13, 2023 |
Jun 18, 2025 |
2.8 |
Minimum Safe Manning Certificate (MSM): |
Sep 25, 2023 |
Not Applicable |
Not Applicable |
Not Applicable |
2.9 |
ISM Safety Management Certificate (SMC): |
May 06, 2020 |
Not Applicable |
Feb 13, 2023 |
Jun 19, 2025 |
2.10 |
Document of Compliance (DOC): |
Sep 02, 2021 |
Oct 03, 2024 |
|
Oct 23, 2026 |
2.11 |
USCG Certificate of Compliance (USCGCOC): |
May 20, 2022 |
Jul 04, 2023 |
Not Applicable |
May 20, 2024 |
2.12 |
Civil Liability Convention (CLC) 1992 Certificate: |
Jan 15, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.13 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Jan 15, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.14 |
Liability for the Removal of Wrecks Certificate (WRC): |
Jan 15, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.15 |
U.S. Certificate of Financial Responsibility (COFR): |
Jan 12, 2024 |
Not Applicable |
Not Applicable |
Jan 12, 2027 |
2.16 |
Certificate of Class (COC): |
Jan 22, 2020 |
Feb 01, 2024 |
Jan 18, 2023 |
Feb 12, 2025 |
2.17 |
Certificate of Registry (COR): |
Apr 19, 2023 |
Not Applicable |
Not Applicable |
Permanent |
2.18 |
International Sewage Pollution Prevention Certificate (ISPPC) |
Jan 22, 2020 |
Not Applicable |
Not Applicable |
Feb 12, 2025 |
2.19 |
Certificate of Fitness (COF): |
Sep 23, 2020 |
Feb 01, 2024 |
Jan 18, 2023 |
Feb 12, 2025 |
2.20 |
International Energy Efficiency Certificate (IEEC): |
Jan 18, 2023 |
Not Applicable |
Not Applicable |
Not Applicable |
2.21 |
International Air Pollution Prevention Certificate (IAPPC): |
Mar 30, 2021 |
Feb 01, 2024 |
Jan 18, 2023 |
Feb 12, 2025 |
2.22 |
Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): |
Sep 24, 2024 |
Not Applicable |
Not Applicable |
Mar 25, 2025 |
2.23 |
Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: |
Yes, |
2.24 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
2.25 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
2.26 |
Is the ITF Special Agreement on board (if applicable)? |
Yes |
2.27 |
ITF Blue Card expiry date (if applicable): |
Feb 12, 2025 |
|
3.1 |
Nationality of Master: |
Indian |
3.2 |
Number and nationality of Officers: |
10 |
Indian, Ukrainian |
3.3 |
Number and nationality of Crew: |
Nationality | Count |
---|
INDIA | 11 |
|
3.4 |
What is the common working language onboard: |
English |
3.5 |
Do officers speak and understand English? |
Yes |
3.6 |
If Officers/ratings employed by a Manning Agency - Full style: |
Officers:
Company Name | Address | Phone | Fax | Email |
---|
Anglo Ardmore Ship Management Limited | 17/F Kingston International Centre19 Wang Chiu Road, Kowloon Bay, Kowloon, Hong Kong | +852 3940 7000 | +852 2861 2419 | operations@angloardmore.com |
Ratings:
Company Name | Address | Phone | Fax | Email |
---|
|
|
4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
Yes |
4.2 |
Qualified individual (QI) - Full style: |
O'Brien's Oil Pollution Service O'Brien's Response Management
818 Town and Country Blvd., Suite 200
Houston, TX 77024
Tel: +1-985-781-0804, +1 (281) 606-4818 Fax: +1-985-781-0580 Email: commandcenter@wittobriens.com Web: www.obriensrm.com |
4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
National Response Corporation 3500 Sunrise Highway,
Suite T103
Great River,
NY 11739,
USA Tel: +1-631-224-9141 (24 hrs) Fax: +1-631-224-9086 Telex: NA Email: iocdo@nrcc.com Web: NA |
4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
RESOLVE SALVAGE & FIRE (AMERICAS),INC 1510 SE 17th Street, Suite 400
Fort Lauderdale, FL 33316 Tel: +1 954 764 8700 Fax: +1-954-764-8724 Email: opa90@resolvemarine.com Web: www.resolvemarine.com |
|
5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes ISO 9001:2015 |
5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
Yes |
5.2.1 |
If Yes, state whether winching or landing area provided: |
Winching only |
5.2.2 |
If Yes, what is the diameter of the circle provided: |
5.00 m |
|
6.1 |
Cargo tanks:
Tank ID | Tank PSC | Tank Type | Constr | Coated Y/N | Coating Type | Extent | Condition | Date | Insp date | Insp Freq |
---|
1 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 06, 2020 | Mar 22, 2024 | Annual | 1 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 22, 2024 | Annual | 2 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 22, 2024 | Annual | 2 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 22, 2024 | Annual | 3 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 22, 2024 | Annual | 3 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 22, 2024 | Annual | 4 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 22, 2024 | Annual | 4 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 22, 2024 | Annual | 5 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 22, 2024 | Annual | 5 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 22, 2024 | Annual | 6 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 23, 2024 | Annual | 6 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 23, 2024 | Annual | 7 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 23, 2024 | Annual | 7 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Oct 16, 2014 | Mar 23, 2024 | Annual |
Anodes Fitted: No |
Ballast tanks:
ID | Coated? | Type | Extent | Condition | Coating date | Insp date | Insp freq |
---|
Fore Peak | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 23, 2024 | Annual | 1P WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 23, 2024 | Annual | 1S WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 23, 2024 | Annual | 2P WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 23, 2024 | Annual | 2S WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 23, 2024 | Annual | 3P WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 27, 2024 | Annual | 3S WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 27, 2024 | Annual | 4P WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 27, 2024 | Annual | 4S WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 27, 2024 | Annual | 5P WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 06, 2024 | Annual | 5S WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 06, 2024 | Annual | 6P WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 06, 2024 | Annual | 6S WBT | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 06, 2024 | Annual | Aft peak tank | Yes | Epoxy | Full Tank | Good | 2014-10-16 | Sep 06, 2024 | Annual |
Anodes Fitted: Yes |
|
7.1 |
Ballast Handling Data
Number | Type | Prime mover type | Capacity (m3/hr) | Head (bar) |
---|
2 | centrifugal | Hydraulic | 750.00 | 30.00 |
|
7.2 |
Does the vessel comply with D1 or D2 performance standards? |
D2 |
7.3 |
Does the vessel have a Ballast Water Treatment System (BWTS) fitted? |
Yes |
7.4 |
What type of BWTS fitted? If other system fitted, please advise: |
Other (specify), Filteration + Electrolysis |
7.5 |
Name of manufacturer of BWTS: |
Samsung Heavy Industries Co., Ltd |
7.6 |
Does the BWTS have IMO type approval? |
Yes |
7.7 |
Is the BWTS of a USCG approved type? |
Yes |
|
8.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: |
Yes, Solid |
8.2 |
Cargo Tank Capacities at 98% Full - Centre:
Total Centre: 0.00 m3
Cargo Tank Capacities at 98% Full - Wing:
Tank Number | Capacity (m3) | P/S |
---|
1 | 2295.59 | Port | 1 | 2286.04 | Stbd | 2 | 2822.59 | Port | 2 | 2819.02 | Stbd | 3 | 2914.96 | Port | 3 | 2920.00 | Stbd | 4 | 2916.74 | Port | 4 | 2921.78 | Stbd | 5 | 2916.73 | Port | 5 | 2921.77 | Stbd | 6 | 2916.73 | Port | 6 | 2921.77 | Stbd | 7 | 2710.03 | Port | 7 | 2715.06 | Stbd |
Total Wing: 38,998.90 m3
Deck Tank Capacities at 98% Full:
Total Deck: m3
|
8.2.1 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
Seg#1: 2295.6 m3 (1 Port) Seg#2: 2286.0 m3 (1 Stbd) Seg#3: 2822.6 m3 (2 Port) Seg#4: 2819.1 m3 (2 Stbd) Seg#5: 2915.0 m3 (3 Port) Seg#6: 2920.0 m3 (3 Stbd) Seg#7: 2916.7 m3 (4 Port) Seg#8: 2921.8 m3 (4 Stbd) Seg#9: 2916.7 m3 (5 Port) Seg#10: 2921.8 m3 (5 Stbd) Seg#11: 2916.7 m3 (6 Port) Seg#12: 2921.8 m3 (6 Stbd) Seg#13: 2710.0 m3 (7 Port) Seg#14: 2715.1 m3 (7 Stbd) |
8.2.2 |
IMO class (Oil/Chemical Ship Type 1, 2 or 3): |
IMO 2 (IMO type2/3) |
8.3 |
Slop tank capacities (98%):
Tank Number | Capacity (m3) | P/S |
---|
Slop | 1309.90 | Port | Slop | 1311.00 | Stbd |
Total: 2,620.90 m3
|
8.3.1 |
Specify segregations which slops tanks belong to and their capacity with double valve: |
NA |
8.3.2 |
Residual/Retention oil tank(s) capacity (98%), if applicable: |
74 m3 |
8.3.3 |
What is total SBT capacity and percentage of SDWT vessel can maintain? |
N/A |
N/A |
8.3.4 |
Does vessel meet the requirements of MARPOL Annex I Reg 18.2: |
N/A |
8.4 |
How many grades/products can vessel load/discharge with double valve segregation: |
16 |
8.4.1 |
State type of cargo containment (integral, independent, gravity or pressure tanks): |
2G (Integral Gravity) |
8.5 |
Are there any cargo tank filling restrictions? If yes, specify number of slack tanks, max s.g., ullage restrictions etc.: |
Yes 1)All cargo tanks are designed for 100% filling
at 1.025 S.G and there are no sloshing
restrictions.
2)All cargo tanks are designed for max SG
1.55 under slack loading condition = 66% of
the tank height.
3)The filling restrictions for intermediate SGs
shall be in accordance with the following
formula =
%(percentage of filling height)=(1.025x100)/ X
( where x = intermediate S.G) |
8.6 |
Max loading rate for homogenous cargo |
With VECS |
Without VECS |
Loaded per manifold connection: |
680 m3/hr |
680 m3/hr (680 m3/hr. for 1W to 7W COTS and
200 m3/hr. for slop W COTs.) |
Loaded simultaneously through all manifolds: |
4,080 m3/hr |
4,080.00 m3/hr |
8.7 |
Is ship fitted with a Cargo Control Room (CCR)? |
Yes |
8.8 |
Can tank innage / ullage be read from the CCR? |
Yes |
8.9 |
Is gauging system certified and calibrated? If no, specify which ones are not calibrated: |
Yes, NA |
|
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): |
CLOSED |
|
What type of fixed closed tank gauging system is fitted: |
N/A |
|
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves? |
No, No |
|
Are high level alarms fitted to the cargo tanks? If Yes, indicate whether to all tanks or partial: |
Yes, Yes |
8.9.1 |
Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? |
N/A |
8.9.2 |
Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: |
Yes, NA |
8.10 |
Number of portable gauging units (example- MMC) on board: |
3 |
8.11 |
Is a Vapour Emission Control System (VECS) fitted? |
Yes |
|
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? |
Yes |
|
If fitted, how many vapor return segregations can the vessel maintain simultaneously? |
1 |
|
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority |
Yes, LR |
8.12 |
Number/size of VECS manifolds (per side): |
2 |
300 mm |
8.13 |
Number / size / type of VECS reducers: |
2 Nos. - 16"x12"
1 Nos. - 12"x 6"
1 Nos. - 12"x 8" |
8.14 |
State what type of venting system is fitted: |
P.V VALVE |
8.15 |
Total number/size of cargo manifold connections on each side:
No.: 16
Size:
Manifold | PCS | Size | Unit | Pressure Rating | Unit PR | Standard |
---|
8 | P | 6 | Inches | 10 | Bar | ANSI | 8 | S | 6 | Inches | 10 | Bar | ANSI | 1 | P | 8 | Inches | 10 | Bar | ANSI | 1 | S | 8 | Inches | 10 | Bar | ANSI | 2 | P | 8 | Inches | 10 | Bar | ANSI | 2 | S | 8 | Inches | 10 | Bar | ANSI | 3 | P | 8 | Inches | 10 | Bar | ANSI | 3 | S | 8 | Inches | 10 | Bar | ANSI | 4 | P | 8 | Inches | 10 | Bar | ANSI | 4 | S | 8 | Inches | 10 | Bar | ANSI | 5 | P | 8 | Inches | 10 | Bar | ANSI | 5 | S | 8 | Inches | 10 | Bar | ANSI | 6 | P | 8 | Inches | 10 | Bar | ANSI | 5 | S | 8 | Inches | 10 | Bar | ANSI | 6 | P | 8 | Inches | 10 | Bar | ANSI | 6 | S | 8 | Inches | 10 | Bar | ANSI | 7 | P | 8 | Inches | 10 | Bar | ANSI | 7 | S | 8 | Inches | 10 | Bar | ANSI |
|
8.15.1 |
Is the vessel fitted with a fixed common line? |
Yes |
|
What is the number of common cargo connections per side? |
1 |
|
What is the size of common cargo connections? |
300 mm |
8.16 |
What type of valves are fitted at manifold: |
Butterfly, |
8.17 |
What is the material/rating of the manifold: |
STAINLESS STEEL / NA |
8.17.1 |
Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? |
Yes |
8.18 |
Distance between cargo manifold centers: |
590.00 mm |
8.19 |
Distance ships rail to manifold: |
4,510.00 mm |
8.20 |
Distance manifold to ships side: |
4,510.00 mm |
8.21 |
Top of rail to center of manifold: |
500.00 mm |
8.22 |
Distance main deck to center of manifold: |
1,920.00 mm |
8.23 |
Spill tank grating to center of manifold: |
900.00 mm |
8.24 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
12.30 m |
7.57 m |
8.25 |
Number / size / type of reducers: |
3 x 200/300mm (8/12") 4 x 200/250mm (8/10") 5 x 200/400mm (8/16") 1 x 150/300mm (6/12") 1 x 150/250mm (6/10") ANSI |
8.26 |
Is vessel fitted with a stern manifold? If yes, state size: |
No, 0 mm |
8.27 |
Provide details of Heating Coils/Heat Exchangers |
Tank ID | P/C/S/ Decktank/ Other | Heat exchanger | Internal/External | External ducts | Heating coils | Heating coil sets | Height of the heating coils above tank bottom (mm) | total heating surface (m2) | Ratio of the heating surface | Welded or coupled | Material |
---|
8 | P | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.05 | Coupled | SS | 8 | S | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.05 | Coupled | SS | 1 | P | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 1 | S | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 2 | P | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 2 | S | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 3 | P | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 3 | S | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 4 | P | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 4 | S | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 5 | P | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 5 | S | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 6 | P | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 6 | S | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 7 | P | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS | 7 | S | no | Internal | no | yes | 2 | 150.00 | 1.00 | 0.01 | Coupled | SS |
|
8.27.1 |
Is a Thermal Oil Heating system fitted? If yes, identify tanks? |
No, |
8.28 |
Maximum temperature cargo can be loaded / maintained: |
70.0 °C / 158.0 °F |
60 °C / 140 °F |
8.28.1 |
Minimum temperature cargo can be loaded / maintained: |
|
|
8.29 |
Is an Inert Gas System (IGS) fitted / operational? |
Yes / Yes |
8.29.1 |
Is a Crude Oil Washing (COW) installation fitted / operational? |
N/A / N/A |
8.30 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
Nitrogen Generator |
8.30.1 |
If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: |
IG Mode (95%) : 3750 CBM/Hr
N2 Mode (99%) : 250 CBM/Hr |
8.31 |
How many cargo pumps can be run simultaneously at full capacity: |
6 |
8.32 |
Cargo Pump Data |
Pump Identity | Pump Location | Type | Type of prime mover | Capacity | At what head? |
---|
14 cargo Pumps | Cargo Tank | Centrifugal | Hydraulic | 500.00 | 130.00 | 2 Slop Tank Pumps | Cargo Tank | Centrifugal | Hydraulic | 200.00 | 130.00 |
|
8.33 |
Is at least one emergency portable cargo pump provided? |
Yes |
8.34 |
Is tank cleaning equipment fixed in cargo tanks? |
Yes |
8.35 |
Is portable tank cleaning equipment provided? |
Yes |
8.36 |
Tank washing pump capacity: |
200.00 m3/hr |
8.37 |
Is a washing water heater fitted? If yes is it operational and state max washing water temperature: |
Yes, Yes 80.00 °C |
8.38 |
What is the maximum number of machines that can be operated at their designed max pressure? |
8 |
8.39 |
Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? |
Yes, Yes |
8.40 |
Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? |
Yes, Yes |
8.41 |
Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: |
Yes, Yes 10,000.00 m3/hr |
8.42 |
Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: |
No, N/A NA |
8.43 |
Is steam available on deck? |
Yes |
|
9.1 |
Provide details for Mooring Ropes, Wires, Tails and Shackles |
Type | Location and Identity | Material | Diameter/size | Length | LDBF(100-105 % of SDMBL (Tonnes)) | TDBF(125-130 % of SDMBL (Tonnes) | SWL (tonnes) | WLL (tonnes) (50-55% of Max LDBF) | Certificate No. | Installed Date | Reversed Date | Renewal2 Date | Status of line/tail | Condition of line/tail |
---|
Ropes | FWD PORT OUTER | MIXED POLYOLEFINS AND HT PES | 52.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | 05d6776c | 2021-02-16 | 2022-07-22 | 2025-01-21 | In Use | Suitable | Ropes | FWD STBD INNER | MIXED POLYOLEFINS AND HT PES | 52.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | d1ad8284 | 2021-02-16 | Jul 19, 2022 | Jan 18, 2025 | In Use | Suitable | Ropes | FWD STBD OUTER | POLYDACRON | 52.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | 86644-3 | 2021-02-16 | 2022-07-22 | 2025-01-21 | In Use | Suitable | Ropes | FWD SPRING FWD | MIXED POLYOLEFINS AND HT PES | 51.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | 36a55527 | 2022-08-08 | | 2027-08-07 | In Use | Suitable | Ropes | FWD SPRING AFT | MIXED POLYOFINS AND HT PES | 51.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | 79C0d397 | 2022-08-08 | | 2027-08-07 | In Use | Suitable | Ropes | AFT N2 ROOM | POLYDACRON | 52.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | 86644-4 | 2020-09-18 | 2022-07-16 | 2025-01-15 | In Use | Suitable | Ropes | AFT PORT INNER | MIXED POLYOFINS AND HT PES | 51.00 | 200.00 | 51.00 | 63.00 | 30.60 | 28.00 | fb75d2c2 | 2022-08-08 | 2022-08-08 | 2027-08-07 | In Use | Suitable | Ropes | AFT STBD INNER | PP+PES | 50.00 | 200.00 | 51.00 | 63.00 | 30.60 | 28.00 | N142M4F4-04 | 2024-02-06 | | 2029-02-05 | In Use | Suitable | Ropes | AFT STBD OUTER | PP+PES | 50.00 | 200.00 | 51.00 | 63.00 | 30.60 | 28.00 | N142N4F4-05 | 2024-02-06 | | 2029-02-05 | In Use | Suitable | Ropes | AFT SPRING FWD | MIXED POLYFINS AND HT PES | 52.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | a79859e0 | 2022-03-14 | | 2027-03-13 | In Use | Suitable | Ropes | AFT SPRING AFT | MIXED POLYOFINS AND HT PES | 52.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | 6efa994 | 2022-03-14 | | 2027-03-13 | In Use | Suitable | Ropes | FWD LOOSE ROPE | MIXED POLYOFINS AND HT PES | 52.00 | 200.00 | 53.55 | 64.00 | 30.60 | 28.00 | fef95cf5 | 2021-02-16 | 2023-08-16 | 2026-02-15 | In Use | Suitable | Ropes | FWD LOOSE ROPE | MIXED POLYOFINS AND HT PES | 52.00 | 200.00 | 53.55 | 64.00 | 30.60 | 28.00 | 2858cb63 | 2021-02-16 | 2023-02-16 | 2026-02-15 | In Use | Suitable | Ropes | AFT LOOSE ROPE | POLYDACRON | 52.00 | 200.00 | 51.00 | 63.00 | 30.60 | 28.00 | 86644-1 | 2021-01-13 | Jul 19, 2022 | Jan 18, 2025 | In Use | Suitable | Ropes | AFT LOOSE ROPE | POLYDACRON | 52.00 | 200.00 | 51.00 | 63.00 | 30.60 | 28.00 | 86644-2 | 2021-01-13 | 2022-07-15 | 2025-07-14 | In Use | Suitable | Ropes | AFT N2 ROOM | MIXED POLYOFINS AND HT PES | 51.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | aea4cd89 | 2022-02-25 | 2022-02-25 | 2027-07-24 | Spare | Suitable | Ropes | AFT PORT OUTER | MIXED POLYFINS AND HT PES | 51.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | 6c98fa1b | 2022-08-08 | | 2027-08-07 | In Use | Suitable | Ropes | FWD PORT INNER | PP + PES | 50.00 | 200.00 | 51.00 | 63.00 | 30.60 | 28.00 | N142M4F4-02 | 2024-02-06 | | 2029-02-05 | In Use | Suitable | Ropes | AFT N2 ROOM | MIXED POLYOLEFINS AND HT PES | 52.00 | 220.00 | 51.00 | 63.00 | 30.60 | 28.00 | 86644-5 | 2020-09-18 | 2022-07-16 | 2025-01-15 | In Use | Suitable | Ropes | FWD LOOSE ROPE | PP + PES | 50.00 | 200.00 | 51.00 | 63.00 | 30.60 | 28.00 | N142M4F4-12 | 2023-11-18 | | 2028-11-17 | Spare | Suitable | Ropes | AFT LOOSE ROPE | PP + PES | 50.00 | 200.00 | 51.00 | 63.00 | 30.60 | 28.00 | N142M4F4-15 | 2023-11-18 | | 2028-11-17 | Spare | Suitable | Ropes | FWD LOOSE ROPE | PP + PES | 50.00 | 200.00 | 51.00 | 63.00 | 30.60 | 28.00 | N142M4F4-17 | 2023-11-18 | | 2028-11-17 | Spare | Suitable |
|
9.2 |
Details of winches and brake testing including rendering loads |
Mooring winch Location | Split Drum | Motive Power | Remote Operational controls | Heaving power | Hauling Speed | Type of Brake | Designed Brake Max holding load (ISO) (80% of SDMB | Operational brake holding load (60% of SDMBL) | Date of last brake test | Brake Rendering load | Frequency of testing brakes |
---|
2 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 3 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 4 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 5 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 6 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 7 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 8 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 9 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 10 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 11 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 12 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL | 1 | Yes | Hydraulic | No | 15.00 | 15.00 | Manual | 40.80 | 30.60 | Nov 11, 2024 | 30.60 | ANNUAL |
|
9.3 |
Provide Details of Mooring bollards and bitts |
Location | Identity No | Certificate Number | Size (mm) | SWL (tonnes) |
---|
Forecastle | 1 | 1 | 400 | 64 | Forecastle | 4 | 4 | 400 | 64 | Forecastle | 2 | 2 | 400 | 64 | Forecastle | 3 | 3 | 400 | 64 | Maindeck Forward (Stbd) | 5 | 5 | 400 | 51 | Maindeck Forward (Port) | 6 | 6 | 400 | 51 | Poop Deck (Stbd) | 7 | 7 | 400 | 64 | Poop Deck (Stbd) | 8 | 8 | 350 | 46 | Poop Deck (Stbd) | 9 | 9 | 400 | 64 | Poop Deck (Port) | 10 | 10 | 400 | 64 | Poop Deck (Port) | 11 | 11 | 400 | 64 | Poop Deck (Port) | 12 | 12 | 400 | 64 |
|
9.4 |
Provide details of Mooring Fairleads/Chocks |
Type | Location | Identity No | Certificate | Size (mm) | SWL (tonnes) | Modifications | If yes, are modifications class approved? |
---|
Closed chock | Forecastle | 1 | 1 | 400 | 51 | no | yes | Closed chock | Forecastle | 2 | 2 | 400 | 51 | no | yes | Closed chock | Forecastle | 3 | 3 | 400 | 51 | no | yes | Closed chock | Forecastle | 4 | 4 | 400 | 51 | no | yes | Closed chock | Maindeck Forward (Port) | 5 | 5 | 400 | 51 | no | yes | Closed chock | Maindeck Forward (Port) | 6 | 6 | 400 | 51 | no | yes | Closed chock | Maindeck Forward (Stbd) | 7 | 7 | 400 | 51 | no | yes | Closed chock | Maindeck Forward (Stbd) | 8 | 8 | 400 | 51 | no | yes | Closed chock | Poop Deck (Port) | 9 | 9 | 400 | 51 | no | yes | Closed chock | Poop Deck (Port) | 10 | 10 | 400 | 51 | no | yes | Closed chock | Poop Deck (Stbd) | 11 | 11 | 400 | 51 | no | yes | Closed chock | Poop Deck (Stbd) | 12 | 12 | 400 | 51 | no | yes |
|
9.5 |
Number of shackles on port / starboard cable: |
11.00 / 12.00 |
9.6 |
Type / SWL of Emergency Towing system forward: |
KETA 45 F |
204 MT |
9.7 |
Type / SWL of Emergency Towing system aft: |
KETSP-40A |
204 MT |
9.8 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
600 X 450 |
9.9 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
102.00 MT |
9.10 |
What is SWL of bollard on poop deck suitable for escort tug: |
64.00 MT |
9.11 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 1 x 10 Tonnes Main Deck Centre |
9.12 |
Accommodation ladder direction: |
Aft |
9.13 |
Does vessel have a portable gangway? If yes, state length: |
Yes |
12.50 m |
9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
Yes |
9.15 |
If fitted, how many chain stoppers: |
1 |
9.16 |
Details of Bow chain stoppers:
Location/Number of Bow Chain Stopper | Type | Operation | SWL | Min Size of Chain | Max size of Chain |
---|
Port | Tongue | Manual | 200.00 | 76.00 | 80.00 |
|
9.17 |
Distance between the bow fairlead and chain stopper/bracket: |
3.00 m |
9.18 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes NA |
|
10.1 |
Speed |
Maximum |
Economical |
Ballast speed: |
Kts (WSNP) (Contact Owners for Details) |
Kts (WSNP) (Contact Owners for Details) |
Laden speed: |
Kts (WSNP) (Contact Owners for Details) |
Kts (WSNP) (Contact Owners for Details) |
10.2 |
What type of fuel is used for main propulsion? If other, then specify: |
MGO, VLSFO and LSMGO |
|
What type of fuel is used for generating plant |
VLSFO and LSMGO |
10.3 |
Bunker Tank Capacities:
Tank Name | Bunker Type | Tank Type | Capacity | Max Pressure |
---|
1HFO P | HFO | Main Bunker Tank | 190.80 | 3.00 | 2 HFO P | HFO | Main Bunker Tank | 239.40 | 3.00 | 2 HFO S | HFO | Main Bunker Tank | 234.00 | 3.00 | 1 HFO P | HFO | Settling Tank | 25.90 | 3.00 | 1 HFO P | HFO | Service Tank | 25.90 | 3.00 | 2 HFO P | HFO | Service Tank | 39.00 | 3.00 | 2 HFO P | HFO | Settling Tank | 38.60 | 3.00 | No 1 S | MDO | Main Bunker Tank | 123.60 | 3.00 | No 2 P | MDO | Main Bunker Tank | 85.50 | 3.00 | No 2 S | MDO | Main Bunker Tank | 74.10 | 3.00 | No 3 S | MDO | Main Bunker Tank | 227.70 | 3.00 | MGO | MDO | Service Tank | 24.20 | 3.00 |
If other, then specify |
10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
10.5 |
Engines |
No |
Capacity |
Make/Type |
Main engine: |
1 |
7,290 Kw |
STX MAN6S50ME-B9.2 (NOX TIER II) |
Aux engine: |
3 |
1,170 Kw |
HYUNDAI-HiMSEN = 6H21/32 |
Power packs: |
4 Sets (2 x Engine Driven & 2 x Electric Driven) |
3.224 m3/hr |
FRAMO Cummins Diesel Engines KTA19-DMI |
Boilers: |
2 |
20.00 MT/Hr |
KANGRIM=PC0201P31 (2-T) & PB0301AS18 (18-T) |
10.6 |
What is brake horse power of bow thruster (if fitted): |
No, 0 bhp |
10.7 |
What is brake horse power of stern thruster (if fitted): |
No, 0 bhp |
10.8 |
Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: |
Yes, 5.10 |
|
If No then provide reason: |
NA |
|
Is the EEDI rating verified by Class, 3rd Party or Owner? |
Class |
10.9 |
Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: |
Yes, 5.10 |
|
If No then provide reason: |
|
|
Is the EEXI rating verified by Class, 3rd Party or Owner? |
Class |
10.10 |
Does the vessel have a CII Rating number? If yes then provide CII rating: |
Yes, A |
|
If No then provide reason: |
|
|
Is the CII rating verified by Class, 3rd Party or Owner? |
Class |
10.11 |
Does the vessel have an EIV Rating number? If yes then provide EIV rating: |
No, |
|
If No then provide reason: |
|
|
Is the EIV rating verified by Class, 3rd Party or Owner? |
|
10.12 |
What is the ships NOx control level (Tier I, Tier II, and Tier III)?: |
Tier II |
|
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...) |
|
10.13 |
Does the vessel use an Exhaust Gas Cleaning System? |
No |
10.14 |
What is the type of scrubber fitted as part of the EGCS onboard? |
|
|
11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
Yes |
11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
7.30 m |
11.3 |
Date/place of last STS operation: |
Aug 02, 2024 / Zarate |
11.4 |
Does the vessel have a ship specific STS plan: |
|
|
12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
12.2 |
Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details: No
|
12.3 |
Date and place of last Port State Control inspection: |
Aug 02, 2024, Zárate |
12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
No NA |
12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |
12.6 |
Date / place of last SIRE inspection: |
Aug 02, 2024 / Zarate - Argentina |
12.6.1 |
Date / place of last CDI inspection: |
Feb 17, 2024 / Houston |
12.7 |
Additional information relating to features of the ship or operational characteristics: |
Distance E(900mm) as mentioned in section 8.23 is from center of lower manifold. The distance from upper center manifold and spill tank grating is 1900 mm. |