← Back to Fleet
INTERTANKO CHARTERING QUESTIONNAIRE 88 - OIL/CHEMICAL Version 6 Created at Q88.com
1. General Information
1.1 Date updated: Nov 22, 2024
1.2 Vessel's name (IMO number): Ardmore Endeavour (9667942)
1.2b Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization ,
1.3 Vessel's previous name(s) and date(s) of change: Strimon (Jun 25, 2014)
1.4 Date delivered / Builder (where built): Jul 19, 2013 / STX Offshore & Ship Building Co. Ltd
1.5 Flag / Port of Registry: Marshall Islands / Majuro
1.6 Call sign / MMSI: V7GT7 / 538005761
1.7 Vessel's contact details (satcom/fax/email etc.): Tel: +47 2339 7618/ +88 16777 52534
Fax:
Email: imo9667942@aesmvsl.com
1.8 Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): Oil Tanker
1.8a If other type of vessel, please specify:
1.9 Type of hull: Double Hull
Ownership and Operation
1.10 Registered owner - Full style:
IMO Number
TRAFALGAR SHIPCO LLC.
Trafalgar Shipco LLC Trust Company Complex Ajeltake Island Majuro Marshall Islands, MH 96960
Marshall Islands
Tel: +353 21 240 9500
Fax: +353 21 240 9001
Telex: NA
Email: marine@ardmoreshipping.com
Web: www.ardmoreshipping.com
IMO: 5804272
1.11 Technical operator - Full style: Anglo Ardmore Ship Management Limited
17/F Kingston International Centre 19 Wang Chiu Road, Kowloon Bay, Kowloon, Hong Kong
Hong Kong
Tel: Tel: +852 3940 7000
Fax: +852 2861 2419
Telex: NA
Email: vetting@angloardmore.com
Web: NA
Company IMO#: 5993395
1.12 Commercial operator - Full style: Ardmore Maritime Services (Asia) Pte Ltd
137 Telok Ayer Street #08-01
Singapore
Tel: +353 21 240 9500
Fax: +353212409512
Telex: NA
Email: commercialoperations@ardmoreshipping.com
Web: www.ardmoreshipping.com
1.13 Disponent owner - Full style: Ardmore MR Pool LLC
Trust Company Complex Ajeltake Road Ajeltake Island Majuro MH 96960 Marshall Islands
Tel: +65 63299400
Telex: Not Applicable
Email: commercialoperations@ardmoreshipping.com
Web: www.ardmoreshipping.com
Insurance
1.14 P & I Club - Full Style: The West of England Ship Owners Mutual Insurance Association (Luxembourg)
Tower Bridge Court 226 Tower Bridge Road London SE1 2UP
Tel: +44 20 7716 6000
Fax: +44 20 7716 6100
Telex: NA
Email: mail@westpandi.com
Web: westpandi.com
1.15 P & I Club pollution liability coverage / expiration date: 1,000,000,000 US$ Feb 20, 2025
1.16 Hull & Machinery insured by - Full Style:
(Specify broker or leading underwriter)
Amwins Global Risks
22 Bishopsgate London EC2N 4BQ UNITED KINGDOM
Tel: +44 20 7469 0100
Fax: +44 20 7469 0100
1.17 Hull & Machinery insured value / expiration date: US$ (Contact Owners for Details) Jan 01, 2026
Classification
1.18 Classification society: Lloyds Register
1.18a Is Classification Society an IACS member? Yes
1.19 Class notation: + 100A1 Double Hull Oil and Chemical Tanker, ship Type 2, CSR, ESP, Ship Right ACS(B), *IWS, LI, SPM4 + LMC IGS UMS,BWTS
1.20 Does the vessel have any open conditions of Class?? If yes List all open conditions: No
1.20a Does the vessel have any Memoranda of Class? If yes, list details: No
1.21 If classification society changed, name of previous and date of change: American Bureau of Shipping, May 14, 2020
1.22 Does the vessel have ice class? If yes, state what level: No, N/A
1.23 Date / place of last dry-dock: Sep 05, 2023 / Chengxi, China
1.24 Date next dry dock due / next annual survey due: Jul 18, 2028
1.25 Date of last special survey / next special survey due: Jul 19, 2023 Jul 18, 2028
1.26 If ship has Condition Assessment Program (CAP), what is the latest overall rating: No, (NA)
Dimensions
1.27 Length overall (LOA): 183.00 m
1.28 Length between perpendiculars (LBP): 173.90 m
1.29 Extreme breadth (Beam): 32.23 m
1.30 Moulded depth: 19.10 m
1.31 Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: 48.61 m 48.613 m
1.32 Distance bridge front to center of manifold: 55.35 m
1.33 Bow to center manifold (BCM) / Stern to center manifold (SCM): 91.95 m 90.95 m
1.34 Parallel body distances: Lightship Normal Ballast Summer Dwt
Forward to mid-point manifold: 39.78 m 42.50 m 42.50 m
Aft to mid-point manifold: 29.78 m 46.65 m 59.526 m
Parallel body length: 68.14 m 89.15 m 102.026 m
Tonnages
1.35 Net Tonnage: 13,496.00
1.36 Gross Tonnage / Reduced Gross Tonnage (if applicable): 29,974.00 23,162
1.37 Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): 31,436.80 26,885.69
1.38 Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): , 24,880.00
Loadline Information
1.39 Loadline Freeboard Draft Deadweight Displacement
Summer: 6.059 m 13.068 m 49,858.50 MT 60,841.60 MT
Winter: 6.331 m 12.781 m 48,446.10 MT 59,429.20 MT
Tropical: 5.787 m 13.325 m 51,273.60 MT 62,256.70 MT
Normal loaded condition: 6.06 m 13.07 m 49,858.50 MT 60,841.60 MT
Lightship: 16.38 m 2.72 m Not Applicable 10,983.10 MT
Normal Ballast Condition: 11.30 m 7.80 m 23,381 MT 34,334 MT
Segregated Ballast Condition: 11.65 m 7.45 m 21,716 MT 32,668 MT
1.40 FWA/TPC at summer draft: 293 mm 52 MT
1.41 Have multiple deadweights been assigned? If yes, list all assigned deadweights: Yes
Assigned DWT 1: 49,858.50
Assigned DWT 2: 44,994.40
Assigned DWT 3: 39,997.00
Assigned DWT 4:
Assigned DWT 5:
1.42 Constant (excluding fresh water): 100 MT
1.43 What is the company guidelines for Under Keel Clearance (UKC) for this vessel? 1.Pilotage:10% of Max Static Draft + Squat at Transit Speed + Variables 2.Coastal Waters:20% of Max Static Draft + Squat at Transit Speed + Variables 3. Open Waters:50% of Max Static Draft + Squat at Transit Speed + Variables 4.At Berth: 1.5% of Vessel's Extreme Breadth or 0.3m, whichever is greater + Variables. 5.SPM or CBM: not less than 20% of vessels static draft + Variables
1.44 What is the max height of mast above waterline (air draft) Full Mast Collapsed Mast
Summer deadweight: 35.56 m 35.557 m
Normal ballast: 41.13 m 0 m
Lightship: 45.89 m 45.887 m
 
2. CERTIFICATES Issued Last Annual Last Intermediate Expires
2.1 Safety Equipment Certificate (SEC): Sep 05, 2023 Jul 25, 2024 Jul 18, 2028
2.2 Safety Radio Certificate (SRC): Sep 05, 2023 Jul 25, 2024 Jul 18, 2028
2.3 Safety Construction Certificate (SCC): Sep 05, 2023 Jul 25, 2024 Jul 18, 2028
2.4 International Loadline Certificate (ILC): Sep 05, 2023 Jul 25, 2024 Jul 18, 2028
2.5 International Oil Pollution Prevention Certificate (IOPPC): Sep 05, 2023 Jul 25, 2024 Jul 18, 2028
2.6 International Ship Security Certificate (ISSC): Dec 22, 2029
2.7 Maritime Labour Certificate (MLC): Not Applicable Dec 22, 2029
2.8 Minimum Safe Manning Certificate (MSM): Sep 15, 2023 Not Applicable Not Applicable Not Applicable
2.9 ISM Safety Management Certificate (SMC): Oct 27, 2024 Dec 22, 2029
2.10 Document of Compliance (DOC): Sep 02, 2021 Oct 03, 2024 Oct 23, 2026
2.11 USCG Certificate of Compliance (USCGCOC): Dec 08, 2023 Not Applicable Not Applicable Dec 08, 2025
2.12 Civil Liability Convention (CLC) 1992 Certificate: Jan 11, 2024 Not Applicable Not Applicable Feb 20, 2025
2.13 Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: Jan 11, 2024 Not Applicable Not Applicable Feb 20, 2025
2.14 Liability for the Removal of Wrecks Certificate (WRC): Jan 11, 2024 Not Applicable Not Applicable Feb 20, 2025
2.15 U.S. Certificate of Financial Responsibility (COFR): Nov 25, 2022 Not Applicable Not Applicable Nov 25, 2025
2.16 Certificate of Class (COC): Sep 05, 2023 Jul 25, 2024 Not Applicable Jul 18, 2028
2.17 Certificate of Registry (COR): Feb 26, 2024 Not Applicable Not Applicable Permanent
2.18 International Sewage Pollution Prevention Certificate (ISPPC) Sep 05, 2023 Not Applicable Not Applicable Jul 18, 2028
2.19 Certificate of Fitness (COF): Sep 05, 2023 Jul 25, 2024 Not Applicable Jul 18, 2028
2.20 International Energy Efficiency Certificate (IEEC): Sep 05, 2023 Not Applicable Not Applicable Not Applicable
2.21 International Air Pollution Prevention Certificate (IAPPC): Sep 05, 2023 Jul 25, 2024 Jul 18, 2028
2.22 Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): Sep 21, 2024 Not Applicable Not Applicable Mar 20, 2025
2.23 Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: Yes,
Documentation
2.24 Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: Yes
2.25 Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? Yes
2.26 Is the ITF Special Agreement on board (if applicable)? Yes
2.27 ITF Blue Card expiry date (if applicable): Jun 24, 2026
 
3. CREW
3.1 Nationality of Master: Russian
3.2 Number and nationality of Officers: 10 Indian, Russian
3.3 Number and nationality of Crew:
Nationality Count
INDIA11
3.4 What is the common working language onboard: English
3.5 Do officers speak and understand English? Yes
3.6 If Officers/ratings employed by a Manning Agency - Full style: Officers:
Company Name Address Phone Fax Email
Anglo Ardmore Ship Management Limited17/F Kingston International Centre 19 WangChiu Road, Kowloon Bay, Kowloon, Hong Kong+852 3940 7000+852 2861 2419vetting@angloardmore.com


Ratings:
Company Name Address Phone Fax Email
 
4. FOR USA CALLS
4.1 Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? Yes
4.2 Qualified individual (QI) - Full style: O'Brien's Oil Pollution Service
O'Brien's Response Management 818 Town and Country Blvd., Suite 200 Houston, TX 77024 USA
Tel: +1 (281) 606-4818
Fax: +1 985 781 0580
Telex: NA
Email: commandcenter@wittobriens.com
Web: NA
4.3 Oil Spill Response Organization (OSRO) - Full style: National Response Corporation
3500 Sunrise Highway Suite T103 Great River NY 11739 USA
Tel: +1-631-224-9141
Fax: +1-631-224-9086
Telex: NA
Email: iocdo@nrcc.com
Web: NA
4.4 Salvage and Marine Firefighting Services (SMFF) - Full Style: Resolve Salvage and Fire
1510 SE 17th Street, Suite 400 Fort Lauderdale, FL 33316
Tel: +1-954-764-8700
Fax: +1-954-764-8724
Email: opa90@resolvemarine.com
Web: www.resolvemarine.com
 
5. SAFETY/HELICOPTER
5.1 Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): Yes
ISO 9001:2015
5.2 Can the ship comply with the ICS Helicopter Guidelines? Yes
5.2.1 If Yes, state whether winching or landing area provided: Winching
5.2.2 If Yes, what is the diameter of the circle provided: 5.30 m
 
6. COATING/ANODES
6.1 Cargo tanks:
Tank ID Tank PSC Tank Type Constr Coated Y/N Coating Type Extent Condition Date Insp date Insp Freq
1P2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 11, 2024Annual
1S2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 11, 2024Annual
2P2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 11, 2024Annual
2S2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 11, 2024Annual
3P2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
3S2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
4P2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
4S2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
5P2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
5S2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
6P2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
6S2gMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
7PSlopMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
7SSlopMild SteelYesEpoxyFull TankGood2013-07-19Aug 12, 2024Annual
8CResidualMild SteelYesEpoxyFull TankGood2013-07-19Sep 03, 2024Annual


Anodes Fitted: No
Ballast tanks:
ID Coated? Type Extent Condition Coating date Insp date Insp freq
FPKYesEpoxyFull TankGood2013-07-19Aug 01, 2024Annual
1PYesEpoxyFull TankGood2013-07-19Aug 01, 2024Annual
1SYesEpoxyFull TankGood2013-07-19Aug 01, 2024Annual
2PYesEpoxyFull TankGood2013-07-19Aug 01, 2024Annual
2SYesEpoxyFull TankGood2013-07-19Aug 01, 2024Annual
3PYesEpoxyFull TankGood2013-07-19Jul 31, 2024Annual
3SYesEpoxyFull TankGood2013-07-19Jul 31, 2024Annual
4PYesEpoxyFull TankGood2013-07-19Jul 31, 2024Annual
4SYesEpoxyFull TankGood2013-07-19Jul 31, 2024Annual
5PYesEpoxyFull TankGood2013-07-19Jul 30, 2024Annual
5SYesEpoxyFull TankGood2013-07-19Jul 30, 2024Annual
6PYesEpoxyFull TankGood2013-07-19Jul 30, 2024Annual
6SYesEpoxyFull TankGood2013-07-19Jul 30, 2024Annual


Anodes Fitted: Yes
 
7. BALLAST
7.1 Ballast Handling Data
Number Type Prime mover type Capacity (m3/hr)Head (bar)
2Deepwell centrifugalElectric750.0025.00
Ballast Water Management Systems (BWMS)
7.2 Does the vessel comply with D1 or D2 performance standards? D2
7.3 Does the vessel have a Ballast Water Treatment System (BWTS) fitted? Yes
7.4 What type of BWTS fitted? If other system fitted, please advise: UV Light,
7.5 Name of manufacturer of BWTS: OPTIMARIN
7.6 Does the BWTS have IMO type approval? Yes
7.7 Is the BWTS of a USCG approved type? Yes
 
8. Cargo- Oil/Chem
Double Hull Vessels
8.1 Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: Yes, Solid
Tank Capacities
8.2 Cargo Tank Capacities at 98% Full - Centre:


Total Centre: 0.00 m3

Cargo Tank Capacities at 98% Full - Wing:
Tank Number Capacity (m3)P/S
13130.00Port
13135.00Stbd
24640.10Port
24632.70Stbd
34731.10Port
34723.40Stbd
44724.10Port
44729.90Stbd
54729.60Port
54722.00Stbd
64161.20Port
64170.20Stbd


Total Wing: 52,229.30 m3

Deck Tank Capacities at 98% Full:


Total Deck: m3
8.2.1 Capacity (98%) of each natural segregation with double valve (specify tanks): Seg#1: 6264.951 cbm (1p, 1S)
Seg#2: 9272.783 cbm (2P, 2S)
Seg#3: 9454.514 cbm (3P, 3S)
Seg#4: 9454.028 cbm (4P, 4S)
Seg#5: 9451.587 cbm (5P, 5S)
Seg#6: 8331.450 cbm (6P, 6S)
Seg#7: 1407.969 cbm (7P, 7S) (98% capacity)
8.2.2 IMO class (Oil/Chemical Ship Type 1, 2 or 3): IMO 2
8.3 Slop tank capacities (98%):
Tank Number Capacity (m3)P/S
Slop port699.50Port
Slop stbd708.50Stbd


Total: 1,408.00 m3
8.3.1 Specify segregations which slops tanks belong to and their capacity with double valve: Seg#7: 1407.969 cbm
8.3.2 Residual/Retention oil tank(s) capacity (98%), if applicable: 105.70 m3
SBT Vessels
8.3.3 What is total SBT capacity and percentage of SDWT vessel can maintain? N/A N/A
8.3.4 Does vessel meet the requirements of MARPOL Annex I Reg 18.2: N/A
Cargo Handling and Pumping Systems
8.4 How many grades/products can vessel load/discharge with double valve segregation: 7
8.4.1 State type of cargo containment (integral, independent, gravity or pressure tanks): 2G (Integral Gravity)
8.5 Are there any cargo tank filling restrictions?
If yes, specify number of slack tanks, max s.g., ullage restrictions etc.:
Yes
Maximum Tank Filling Percentage = (1.025 / Density of Cargo) X 98
8.6 Max loading rate for homogenous cargo With VECS Without VECS
Loaded per manifold connection: 1,520 m3/hr 3,150 m3/hr
Loaded simultaneously through all manifolds: 5,600 m3/hr 5,600.00 m3/hr
Cargo Control Room
8.7 Is ship fitted with a Cargo Control Room (CCR)? Yes
8.8 Can tank innage / ullage be read from the CCR? Yes
Gauging and Sampling
8.9 Is gauging system certified and calibrated? If no, specify which ones are not calibrated: Yes, NA
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): Closed
What type of fixed closed tank gauging system is fitted: N/A
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves? No, No
Are high level alarms fitted to the cargo tanks? If Yes, indicate whether to all tanks or partial: Yes, Yes
8.9.1 Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? N/A
8.9.2 Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: Yes, Tanktech UTI tapes through Vapour Locks
8.10 Number of portable gauging units (example- MMC) on board: 3
Vapor Emission Control System (VECS)
8.11 Is a Vapour Emission Control System (VECS) fitted? Yes
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? Yes
If fitted, how many vapor return segregations can the vessel maintain simultaneously? 1
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority Yes, ABS
8.12 Number/size of VECS manifolds (per side): 2 300 mm
8.13 Number / size / type of VECS reducers: 16" x 12": 2 12" x 10": 1 12"x 8" : 1
Venting
8.14 State what type of venting system is fitted: P/V Valves and pressure sensors
Cargo Manifolds and Reducers
8.15 Total number/size of cargo manifold connections on each side:
No.: 7 (Including slop)

Size:
Manifold PCS Size Unit Pressure Rating Unit PR Standard
7P16Inches150PsiANSI
7S16Inches150PsiANSI
8.15.1 Is the vessel fitted with a fixed common line? Yes
What is the number of common cargo connections per side? 1
What is the size of common cargo connections? 150 mm
8.16 What type of valves are fitted at manifold: Butterfly,
8.17 What is the material/rating of the manifold: Stainless steel SUS316L /
8.17.1 Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? Yes
8.18 Distance between cargo manifold centers: 2,000.00 mm
8.19 Distance ships rail to manifold: 4,430.00 mm
8.20 Distance manifold to ships side: 4,600.00 mm
8.21 Top of rail to center of manifold: 950.00 mm
8.22 Distance main deck to center of manifold: 2,100.00 mm
8.23 Spill tank grating to center of manifold: 900.00 mm
8.24 Manifold height above the waterline in normal ballast / at SDWT condition: 13.40 m 8.147 m
8.25 Number / size / type of reducers: 12 x 300/400mm (12/16")
1 x 200/400mm (8/16")
7 x 300/200mm (12/8")
6 x 300/300mm (12/12")
6 x 300/250mm (12/10") (6 x 300/200mm (12"/8") 1 x 200/250mm (8"/10") 1 x 200/200mm (8"/8") 1 x 200/400mm (8"/16"))
ANSI
8.26 Is vessel fitted with a stern manifold? If yes, state size: No, 0.00 mm
Heating
8.27 Provide details of Heating Coils/Heat Exchangers
Tank ID P/C/S/ Decktank/ Other Heat exchanger Internal/External External ducts Heating coils Heating coil sets Height of the heating coils above tank bottom (mm)total heating surface (m2)Ratio of the heating surface Welded or coupled Material
7PnoInternalnoyes2150.0035.000.01WeldedSS
7SnoInternalnoyes2150.0035.000.01WeldedSS
1PnoInternalnoyes2150.0035.000.01WeldedSS
1SnoInternalnoyes2150.0035.000.01WeldedSS
2PnoInternalnoyes2150.0035.000.01WeldedSS
2SnoInternalnoyes2150.0035.000.01WeldedSS
3PnoInternalnoyes2150.0035.000.01WeldedSS
3SnoInternalnoyes2150.0035.000.01WeldedSS
4PnoInternalnoyes2150.0035.000.01WeldedSS
4SnoInternalnoyes2150.0035.000.01WeldedSS
5PnoInternalnoyes2150.0035.000.01WeldedSS
5SnoInternalnoyes2150.0035.000.01WeldedSS
6PnoInternalnoyes2150.0035.000.01WeldedSS
6SnoInternalnoyes2150.0035.000.01WeldedSS
8.27.1 Is a Thermal Oil Heating system fitted? If yes, identify tanks? No,
8.28 Maximum temperature cargo can be loaded / maintained: 70.0 °C / 158.0 °F 60 °C / 140 °F
8.28.1 Minimum temperature cargo can be loaded / maintained: 30.0 °C / 86.0 °F 0.0 °C / 32.0 °F
Inert Gas and Crude Oil Washing
8.29 Is an Inert Gas System (IGS) fitted / operational? Yes / Yes
8.29.1 Is a Crude Oil Washing (COW) installation fitted / operational? N/A / N/A
8.30 Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: IG Generator
8.30.1 If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: N/A
Cargo Pumps
8.31 How many cargo pumps can be run simultaneously at full capacity: 6
8.32 Cargo Pump Data
Pump Identity Pump Location Type Type of prime mover Capacity At what head?
12Cargo TankCentrifugalElectric600.00125.00
2Cargo TankCentrifugalElectric300.00125.00
8.33 Is at least one emergency portable cargo pump provided? Yes
Tank Cleaning Systems
8.34 Is tank cleaning equipment fixed in cargo tanks? Yes
8.35 Is portable tank cleaning equipment provided? Yes
8.36 Tank washing pump capacity: 100.00 m3/hr
8.37 Is a washing water heater fitted? If yes is it operational and state max washing water temperature: Yes, Yes
85.00 °C
8.38 What is the maximum number of machines that can be operated at their designed max pressure? 4
Other Deck Equipment
8.39 Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? Yes, Yes
8.40 Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? Yes, Yes
8.41 Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: No, N/A
m3/hr
8.42 Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: No, N/A
8.43 Is steam available on deck? Yes
 
9. MOORING
9.1 Provide details for Mooring Ropes, Wires, Tails and Shackles
Type Location and Identity Material Diameter/size Length LDBF(100-105 % of SDMBL (Tonnes)) TDBF(125-130 % of SDMBL (Tonnes) SWL (tonnes) WLL (tonnes) (50-55% of Max LDBF) Certificate No. Installed Date Reversed Date Renewal2 Date Status of line/tail Condition of line/tail
RopesPoop DeckMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.503b9716a92023-04-012023-04-012028-04-01SpareSuitable
RopesPoop DeckMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.5088bb13a52023-04-012023-04-012028-04-01SpareSuitable
RopesForecastleMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.501118d6fd2022-03-062022-03-062027-03-06In UseSuitable
RopesForecastleMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.50434ebd042022-03-062022-03-062027-03-06In UseSuitable
RopesForecastleMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.50a57a4cda2022-03-062022-03-062027-03-06In UseSuitable
RopesForecastleMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.502911920b2022-03-062022-03-062027-03-06In UseSuitable
RopesMain deck fwdMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.5008c2c7cb2022-03-062022-03-062027-03-06In UseSuitable
RopesMain deck fwdMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.500be16b8f2022-03-062022-03-062027-03-06In UseSuitable
RopesMain deck aftMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.5022bd17142022-03-062022-03-062027-03-06In UseSuitable
Ropesmain deck aftMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.504f42cd162022-03-062022-03-062027-03-06In UseSuitable
RopesPoop deckMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.5050138f9a2022-03-062022-03-062027-03-06In UseSuitable
RopesPoop DeckMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.50a8c98f792022-03-062022-03-062027-03-06In UseSuitable
RopesPoop DeckMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.506aac99762022-03-062022-03-062027-03-06In UseSuitable
RopesPoop deckMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.5022058bae2022-03-062022-03-062027-03-06In UseSuitable
RopesPoop DeckMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.5008d49cb92022-03-062022-03-062027-03-06SpareSuitable
RopesForcastleMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.503d4ae98e2022-03-062022-03-062027-03-06SpareSuitable
RopesForecastleMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.50abc14d452023-04-012023-04-012028-04-01SpareSuitable
RopesForecastleMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0056.900.0056.9028.506bd0c2c32023-04-012023-04-012028-04-01SpareSuitable
RopesPoop DeckMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0058.000.0056.9029.002001081000102020-02-262022-03-062025-02-26SpareSuitable
RopesForecastleMIXED POLYOLEFINS & HIGH PERFORMANCE POLYSTER55.00220.0058.000.0056.9029.002001081000092020-02-262022-03-062025-02-26SpareSuitable
9.2 Details of winches and brake testing including rendering loads
Mooring winch Location Split Drum Motive Power Remote Operational controls Heaving power Hauling Speed Type of Brake Designed Brake Max holding load (ISO) (80% of SDMB Operational brake holding load (60% of SDMBL) Date of last brake test Brake Rendering load Frequency of testing brakes
1yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
2yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
3yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
4yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
5yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
7yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
8yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
9yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
10yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
11yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
12yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
6yesHydraulicno15.9815.00Manual45.5034.142023-11-2834.14Annual
9.3 Provide Details of Mooring bollards and bitts
Location Identity No Certificate Number Size (mm) SWL (tonnes)
Forecastle10040064
Forecastle10040064
Forecastle20040057
Forecastle20040057
Forecastle30040092
Forecastle30040092
Maindeck Forward (Port)10040064
Maindeck Forward (Stbd)10040064
Maindeck Forward (Port)20040057
Maindeck Forward (Stbd)30040057
Maindeck Forward (Port)40040092
Maindeck Forward (Port)40040092
Maindeck Forward (Stbd)40040092
Maindeck Forward (Stbd)40040092
Maindeck Forward (Port)50030025
Maindeck Forward (Port)50030025
Maindeck Forward (Stbd)50030025
Maindeck Forward (Stbd)50030025
Maindeck Forward (Port)60040057
Maindeck Forward (Stbd)70040057
Poop Deck (Port)10040064
Poop Deck (Stbd)10040064
Poop Deck (Port)20040064
Poop Deck (Stbd)20040064
Poop Deck (Port)30040064
Poop Deck (Stbd)30040064
Poop Deck (Port)40040064
Poop Deck (Stbd)40040064
9.4 Provide details of Mooring Fairleads/Chocks
Type Location Identity No Certificate Size (mm) SWL (tonnes) Modifications If yes, are modifications class approved?
Panama typeForecastle100600200nono
Panama typeForecastle10050092nono
Panama typeForecastle10050092nono
Closed chockForecastle10040057nono
Closed chockForecastle10040057nono
Closed chockForecastle20040057nono
Closed chockForecastle20040057nono
Closed chockForecastle30040057nono
Closed chockForecastle30040057nono
Panama typeMaindeck Forward (Port)10036064nono
Panama typeMaindeck Forward (Stbd)10036064nono
Closed chockMaindeck Forward (Port)10040057nono
Closed chockMaindeck Forward (Stbd)10040057nono
Closed chockMaindeck Forward (Port)20040057nono
Closed chockMaindeck Forward (Stbd)20040057nono
Closed chockMaindeck Forward (Port)30040057nono
Closed chockMaindeck Forward (Stbd)30040057nono
Closed chockMaindeck Forward (Port)40050092nono
Closed chockMaindeck Forward (Stbd)40050092nono
Closed chockMaindeck Forward (Port)50040025nono
Closed chockMaindeck Forward (Port)50040025nono
Closed chockMaindeck Forward (Port)50040025nono
Closed chockMaindeck Forward (Port)50040025nono
Closed chockMaindeck Forward (Stbd)50040025nono
Closed chockMaindeck Forward (Stbd)50040025nono
Closed chockMaindeck Forward (Stbd)50040025nono
Closed chockMaindeck Forward (Stbd)50040025nono
Closed chockMaindeck Forward (Port)60050092nono
Closed chockMaindeck Forward (Stbd)60050092nono
Closed chockMaindeck Forward (Port)70040057nono
Closed chockMaindeck Forward (Stbd)70040057nono
Closed chockMaindeck Forward (Port)80040057nono
Closed chockMaindeck Forward (Stbd)80040057nono
Closed chockMaindeck Forward (Port)90040057nono
Closed chockMaindeck Forward (Stbd)90040057nono
Panama typePoop Deck (Port)10036064nono
Panama typePoop Deck (Stbd)10036064nono
Panama typePoop Deck (Port)20036064nono
Panama typePoop Deck (Stbd)20036064nono
Panama typePoop Deck (Port)30036064nono
Panama typePoop Deck (Stbd)30036064nono
Panama typePoop Deck (Port)40036064nono
Closed chockPoop Deck (Port)10040057nono
Closed chockPoop Deck (Stbd)10040057nono
Closed chockPoop Deck (Port)20040057nono
Closed chockPoop Deck (Stbd)20040057nono
Closed chockPoop Deck (Port)30040057nono
Closed chockPoop Deck (Stbd)30040057nono
Closed chockPoop Deck (Port)40040057nono
Closed chockPoop Deck (Stbd)40040057nono
Anchors/Emergency Towing System
9.5 Number of shackles on port / starboard cable: 12.00 / 12.00
9.6 Type / SWL of Emergency Towing system forward: CHAIN STOPPERTONGUE TYPE 200 MT
9.7 Type / SWL of Emergency Towing system aft: TOWING WIRE WITHQUICK RELEASEMECHANISM 200 MT
9.8 What is size of closed chock and/or fairleads of enclosed type on stern: 1160*504*1130
Escort Tug
9.9 What is SWL of closed chock and/or fairleads of enclosed type on stern: 200.00 MT
9.10 What is SWL of bollard on poop deck suitable for escort tug: 200.00 MT
Lifting Equipment/Gangway
9.11 Derrick / Crane description (Number, SWL and location): Cranes: 1 x 10 Tonnes
Centre
9.12 Accommodation ladder direction: Aft
9.13 Does vessel have a portable gangway? If yes, state length: Yes (Portable Ladder length: 12.13 m) 14.47 m
Single Point Mooring (SPM) Equipment
9.14 Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? Yes
9.15 If fitted, how many chain stoppers: 1
9.16 Details of Bow chain stoppers:
Location/Number of Bow Chain Stopper Type Operation SWL Min Size of Chain Max size of Chain
PortTongueManual200.0076.0076.00
9.17 Distance between the bow fairlead and chain stopper/bracket: 3.50 m
9.18 Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: Yes
N/A
 
10. PROPULSION
10.1 Speed Maximum Economical
Ballast speed: Kts (WSNP) (Contact Owners for Details) Kts (WSNP) (Contact Owners for Details)
Laden speed: Kts (WSNP) (Contact Owners for Details) Kts (WSNP) (Contact Owners for Details)
10.2 What type of fuel is used for main propulsion? If other, then specify: HFO,
What type of fuel is used for generating plant VLSFO & LSMGO
10.3 Bunker Tank Capacities:
Tank Name Bunker Type Tank Type Capacity Max Pressure
NO.1 HFO STORAGE TK(P)HFOMain Bunker Tank353.191.00
NO.1 HFO STORAGE TKHFOMain Bunker Tank475.781.00
NO.2 HFO STORAGE TK(S)HFOMain Bunker Tank133.461.00
HFO SETTLING TKHFOSettling Tank58.611.00
HFO LS SERVICE TKHFOService Tank42.571.00
HFO LS SETTLING TKHFOSettling Tank42.571.00
HFO SERVICE TKHFOService Tank60.841.00
MDO STORAGE TK (S)MDOMain Bunker Tank54.161.00
MGO STORAGE TK (P)MDOMain Bunker Tank134.681.00
MDO SERVICE TKMDOService Tank12.721.00
MDO SETTLING TKMDOSettling Tank12.721.00
MGO SERVICE TKMDOService Tank31.431.00


If other, then specify
10.4 Is vessel fitted with fixed or controllable pitch propeller(s): Fixed
10.5 Engines No Capacity Make/Type
Main engine: 1 7,570 Kw STX MAN6S50ME-B9.2 (NOX TIER II)
Aux engine: 3 960 Kw STX MAN B&W 6L23/30H
Power packs: Variable Speed Drive System 0 m3/hr MARFLEX = Electric Type Driven Cargo Pumps
Boilers: 1 18.00 MT/Hr KANGRIM HEAVY INDUSTRIES = Type PB0301AS12
Bow/Stern Thruster
10.6 What is brake horse power of bow thruster (if fitted): No, 0 bhp
10.7 What is brake horse power of stern thruster (if fitted): No, 0 bhp
Environmental/Emissions
10.8 Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: No, N/A
If No then provide reason:
Is the EEDI rating verified by Class, 3rd Party or Owner?
10.9 Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: Yes, 4.58
If No then provide reason:
Is the EEXI rating verified by Class, 3rd Party or Owner? Owner
10.10 Does the vessel have a CII Rating number? If yes then provide CII rating: Yes, B
If No then provide reason:
Is the CII rating verified by Class, 3rd Party or Owner? Owner
10.11 Does the vessel have an EIV Rating number? If yes then provide EIV rating: No,
If No then provide reason:
Is the EIV rating verified by Class, 3rd Party or Owner?
10.12 What is the ships NOx control level (Tier I, Tier II, and Tier III)?: Tier II
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...)
Exhaust Gas Cleaning System/Scrubber
10.13 Does the vessel use an Exhaust Gas Cleaning System? No
10.14 What is the type of scrubber fitted as part of the EGCS onboard?
 
11. SHIP TO SHIP TRANSFER
11.1 Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? Yes
11.2 What is maximum outreach of cranes / derricks outboard of the ship's side: 8.90 m
11.3 Date/place of last STS operation: Aug 30, 2024 / Chattogram, Bangladesh
11.4 Does the vessel have a ship specific STS plan:
 
12. RECENT OPERATIONAL HISTORY
12.1 Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last):
12.2 Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details:
No

12.3 Date and place of last Port State Control inspection: Jul 01, 2024, Hobart
12.4 Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: No
NA
12.5 Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:

*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis.
CHEVRON
12.6 Date / place of last SIRE inspection: Oct 10, 2024 / ULSAN
12.6.1 Date / place of last CDI inspection: Not Applicable / Not Applicable
12.7 Additional information relating to features of the ship or operational characteristics: None