1.1 |
Date updated: |
Sep 06, 2024 |
1.2 |
Vessel's name (IMO number): |
Ardmore Sealion (9708203) |
1.2b |
Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization |
Yes, 4197014 |
1.3 |
Vessel's previous name(s) and date(s) of change: |
Not Applicable |
1.4 |
Date delivered / Builder (where built): |
May 26, 2015 / SPP Ship Building Co. Ltd |
1.5 |
Flag / Port of Registry: |
Marshall Islands / Majuro |
1.6 |
Call sign / MMSI: |
V7JZ3 / 538006129 |
1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: +1-9294253025 (VSAT) / +881-677752676 (Iridium) |
Fax: |
Email: asealion@skyfile.com |
1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
|
1.8a |
If other type of vessel, please specify: |
Crude Oil / Product Carrier |
1.9 |
Type of hull: |
Double Hull |
1.10 |
Registered owner - Full style: IMO Number |
Fair Isle Shipco LLC Trust Company Complex,
Ajeltake Road,
Ajeltake Island
Majuro Marshall Islands Tel: +353-212409500 Fax: +353-212409501 Telex: Not Applicable Email: marine@ardmoreshipping.com Web: www.ardmoreshipping.com IMO: |
1.11 |
Technical operator - Full style: |
Anglo Ardmore Ship Management Limited 17/F Kingston International Centre 19 Wang Chiu Road, Kowloon Bay, Kowloon Hong Kong Tel: +852-39407000 Fax: +852-28612419 Telex: Not Applicable Email: vetting@angloardmore.com Web: NA Company IMO#: 5993395 |
1.12 |
Commercial operator - Full style: |
Ardmore Maritime Services (Asia) Pte Ltd 137 Telok Ayer Street
#08-01,
Singapore Singapore Tel: +353-212409500 Fax: +353-212409512 Telex: NA Email: commercialoperations@ardmoreshipping.com Web: www.ardmoreshipping.com |
1.13 |
Disponent owner - Full style: |
Ardmore MR Pool LLC Trust Company Complex Ajeltake Road Ajeltake Island Majuro Marshall Islands MH 969690 Tel: +65-63299400 Fax: N/A Telex: Not Applicable Email: commercialoperations@ardmoreshipping.com Web: www.ardmoreshipping.com |
1.14 |
P & I Club - Full Style: |
The West of England Ship Owners Mutual Insurance Association (Luxembourg) Tower Bridge Court
226 Tower Bridge Road
London SE1 2UP Tel: +44-2077166000 Fax: +44-2077166100 Telex: NA Email: mail@westpandi.com Web: www.westpandi.com |
1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2025 |
1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Amwins Global Risks 22 Bishopsgate
London
EC2N 4BQ
UNITED KINGDOM
Phone: +44 20 7469 0100 |
1.17 |
Hull & Machinery insured value / expiration date: |
US$ (Contact owners for details) |
Jan 01, 2026 |
1.18 |
Classification society: |
Lloyds Register |
1.18a |
Is Classification Society an IACS member? |
Yes |
1.19 |
Class notation: |
+100A1, Double Hull Oil and Chemical Tanker, Ship Type 2 & Ship Type 3, CSR, ESP, ShipRight (CM, ACS(B)), *IWS, LI, SPM4, +LMC, IGS, UMS, BWTS* Descriptive Note: COW(LR), ETA, Part Higher Tensile Steel, ShipRight (BWMP(T), SERS, SCM) |
1.20 |
Does the vessel have any open conditions of Class?? If yes List all open conditions: |
No
|
1.20a |
Does the vessel have any Memoranda of Class? If yes, list details: |
No
|
1.21 |
If classification society changed, name of previous and date of change: |
, Not Applicable |
1.22 |
Does the vessel have ice class? If yes, state what level: |
No, Not Applicable |
1.23 |
Date / place of last dry-dock: |
Nov 06, 2020 / SEMBCORP YARD / SINGAPORE |
1.24 |
Date next dry dock due / next annual survey due: |
May 25, 2025 |
May 25, 2025 |
1.25 |
Date of last special survey / next special survey due: |
Nov 06, 2020 |
May 25, 2025 |
1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, |
1.27 |
Length overall (LOA): |
183.00 m |
1.28 |
Length between perpendiculars (LBP): |
174.00 m |
1.29 |
Extreme breadth (Beam): |
32.23 m |
1.30 |
Moulded depth: |
19.127 m |
1.31 |
Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: |
48.45 m |
m |
1.32 |
Distance bridge front to center of manifold: |
58.40 m |
1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
89.90 m |
93.10 m |
1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
Forward to mid-point manifold: |
26.08 m |
33.74 m |
33.88 m |
Aft to mid-point manifold: |
23.58 m |
42.08 m |
56.66 m |
Parallel body length: |
49.66 m |
75.82 m |
90.54 m |
1.35 |
Net Tonnage: |
13,763 |
1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
29,737 |
23,009 |
1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
31,223.34 |
26,631.25 |
1.38 |
Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): |
Yes, 24,764.00 |
1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
Summer: |
5.841 m |
13.286 m |
49,999 MT |
60,809.70 MT |
Winter: |
6.117 m |
13.01 m |
48,550.90 MT |
59,361.60 MT |
Tropical: |
5.565 m |
13.562 m |
51,444.40 MT |
62,255.10 MT |
Normal loaded condition: |
8.127 m |
11.00 m |
38,155.40 MT |
48,966.40 MT |
Lightship: |
16.096 m |
3.031 m |
Not Applicable |
10,810.70 MT |
Normal Ballast Condition: |
11.448 m |
7.679 m |
21,572.10 MT |
32,383.80 MT |
Segregated Ballast Condition: |
11.515 m |
7.612 m |
21,276.80 MT |
32,087.50 MT |
1.40 |
FWA/TPC at summer draft: |
290.00 mm |
52.40 MT |
1.41 |
Have multiple deadweights been assigned? If yes, list all assigned deadweights: |
Yes Assigned DWT 1: 49,999.00 Assigned DWT 2: 44,999.00 Assigned DWT 3: 39,999.00 Assigned DWT 4: 34,999.00 Assigned DWT 5: 29,999.00 |
1.42 |
Constant (excluding fresh water): |
211 MT |
1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
After making allowance for factors like squat, swell, change of water density, list, heel and prevailing weather conditions including other variables such as allowance due to, siltation and reduced depths over pipelines and Ice accretion.:
A. While Underway:
1.Pilotage waters, Channels, Fairways, Rivers.: 10% of static draft.
2.Coastal Waters when transiting at distance less than 25NM from coastline : 20% of Max Static Draft.
3.Open Waters When transiting more than or equal to 25 NM from coastline: 50% of static draft.
B. While In Port
1. Alongside / Engaged in mooring or un-mooring.: 1.5% of Vessel's Extreme Breadth or 0.3m, whichever is greater.
2. CBM, SBM : not less than 20% of vessels static draft.
3a.At Anchor Unprotected Waters : 20 % of vessels static draft.
3b.At Anchor Protected/ Sheltered Waters : 10 % of vessels static draft.
*** If Local requirements (charterers, port, canal authorities) have rules that are stricter than the
above criteria then adhere to such higher UKC allowances. |
1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
Summer deadweight: |
35.164 m |
0 m |
Normal ballast: |
39.74 m |
m |
Lightship: |
45.42 m |
0 m |
|
2.1 |
Safety Equipment Certificate (SEC): |
Sep 19, 2022 |
Jun 13, 2024 |
|
May 25, 2025 |
2.2 |
Safety Radio Certificate (SRC): |
May 23, 2020 |
Jun 13, 2024 |
|
May 25, 2025 |
2.3 |
Safety Construction Certificate (SCC): |
Sep 19, 2022 |
Jun 13, 2024 |
May 24, 2023 |
May 25, 2025 |
2.4 |
International Loadline Certificate (ILC): |
Sep 25, 2020 |
Jun 13, 2024 |
|
May 25, 2025 |
2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Dec 07, 2023 |
Jun 13, 2024 |
May 24, 2023 |
May 25, 2025 |
2.6 |
International Ship Security Certificate (ISSC): |
Aug 09, 2020 |
Not Applicable |
Mar 27, 2023 |
Oct 12, 2025 |
2.7 |
Maritime Labour Certificate (MLC): |
Aug 09, 2020 |
Not Applicable |
Mar 27, 2023 |
Oct 12, 2025 |
2.8 |
Minimum Safe Manning Certificate (MSM): |
Nov 09, 2023 |
Not Applicable |
Not Applicable |
Not Applicable |
2.9 |
ISM Safety Management Certificate (SMC): |
Aug 09, 2020 |
Not Applicable |
Mar 27, 2023 |
Oct 12, 2025 |
2.10 |
Document of Compliance (DOC): |
Sep 02, 2021 |
Sep 12, 2023 |
|
Oct 23, 2026 |
2.11 |
USCG Certificate of Compliance (USCGCOC): |
Jun 15, 2023 |
Not Applicable |
Not Applicable |
Jun 15, 2025 |
2.12 |
Civil Liability Convention (CLC) 1992 Certificate: |
Jan 15, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.13 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Jan 15, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.14 |
Liability for the Removal of Wrecks Certificate (WRC): |
Jan 15, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.15 |
U.S. Certificate of Financial Responsibility (COFR): |
May 28, 2024 |
Not Applicable |
Not Applicable |
May 28, 2027 |
2.16 |
Certificate of Class (COC): |
Nov 06, 2020 |
Jun 13, 2024 |
May 24, 2023 |
May 25, 2025 |
2.17 |
Certificate of Registry (COR): |
Mar 23, 2016 |
Not Applicable |
Not Applicable |
Permanent |
2.18 |
International Sewage Pollution Prevention Certificate (ISPPC) |
May 23, 2020 |
Not Applicable |
Not Applicable |
May 25, 2025 |
2.19 |
Certificate of Fitness (COF): |
Jun 07, 2023 |
Jun 13, 2024 |
May 24, 2023 |
May 25, 2025 |
2.20 |
International Energy Efficiency Certificate (IEEC): |
May 26, 2015 |
Not Applicable |
Not Applicable |
Not Applicable |
2.21 |
International Air Pollution Prevention Certificate (IAPPC): |
Sep 25, 2020 |
Jun 13, 2024 |
May 24, 2023 |
May 25, 2025 |
2.22 |
Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): |
Jul 22, 2024 |
Not Applicable |
Not Applicable |
Jan 21, 2025 |
2.23 |
Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: |
Yes, NA |
2.24 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
2.25 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
2.26 |
Is the ITF Special Agreement on board (if applicable)? |
Yes |
2.27 |
ITF Blue Card expiry date (if applicable): |
May 25, 2025 |
|
3.1 |
Nationality of Master: |
Indian |
3.2 |
Number and nationality of Officers: |
10 |
Indian, Filipino |
3.3 |
Number and nationality of Crew: |
Nationality | Count |
---|
INDIA | 11 |
|
3.4 |
What is the common working language onboard: |
English |
3.5 |
Do officers speak and understand English? |
Yes |
3.6 |
If Officers/ratings employed by a Manning Agency - Full style: |
Officers:
Company Name | Address | Phone | Fax | Email |
---|
Anglo Ardmore Ship Management Limited | 17/F Kingston International Centre 19 Wang Chiu Ro | +852-39407000 | +852-28612419 | operations@angloardmore.com |
Ratings:
Company Name | Address | Phone | Fax | Email |
---|
Anglo Ardmore Ship Management Limited | 17/F Kingston International Centre 19 Wang Chiu Ro | +852-39407000 | +852-28612419 | operations@angloardmore.com |
|
|
4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
Yes |
4.2 |
Qualified individual (QI) - Full style: |
O'Brien's Oil Pollution Service O'Brien's Response Management
818 Town and Country Blvd., Suite 200
Houston, TX 77024, USA
Tel: +1-281-606-4854 Fax: +1-985-781-0580 Telex: 24 Hr (alternate): +1-985-781-0804 Tel Email: commandcenter@wittobriens.com Web: Not Applicable |
4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
National Response Corporation 3500 Sunrise Highway
Suite T103
Great River
NY 11739
USA
Tel: +1-631-224-9141 Fax: +1-631-224-9086 Telex: Not Applicable Email: iocdo@nrcc.com Web: Not Applicable |
4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
RESOLVE MARINE GROUP INC. 1510 SE 17th Street, Suite 400
Fort Lauderdale, FL 33316 Tel: +1-954-764-8700 Fax: +1-954-764-8724 Email: opa90@resolvemarine.com Web: www.resolvemarine.com |
|
5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes ISO 9001:2015 |
5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
Yes |
5.2.1 |
If Yes, state whether winching or landing area provided: |
Winching |
5.2.2 |
If Yes, what is the diameter of the circle provided: |
5.00 m |
|
6.1 |
Cargo tanks:
Tank ID | Tank PSC | Tank Type | Constr | Coated Y/N | Coating Type | Extent | Condition | Date | Insp date | Insp Freq |
---|
1 | P | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Oct 30, 2023 | Annual | 1 | S | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Oct 30, 2023 | Annual | 2 | P | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Oct 30, 2023 | Annual | 2 | S | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Oct 30, 2023 | Annual | 3 | P | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Oct 30, 2023 | Annual | 3 | S | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Jun 17, 2024 | Annual | 4 | P | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Jun 17, 2024 | Annual | 4 | S | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Jun 17, 2024 | Annual | 5 | P | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Jun 17, 2024 | Annual | 5 | S | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Jun 17, 2024 | Annual | 6 | P | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Oct 31, 2023 | Annual | 6 | S | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Oct 31, 2023 | Annual | 7 | P | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Nov 17, 2023 | Annual | 7 | S | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Jun 17, 2024 | Annual | Resudual | P | Residual | Mild Steel | Yes | Epoxy | Full Tank | Good | Jan 09, 2015 | Sep 06, 2023 | Annual |
Anodes Fitted: No |
Ballast tanks:
ID | Coated? | Type | Extent | Condition | Coating date | Insp date | Insp freq |
---|
FPK | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | May 14, 2024 | Annual | 1P WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 11, 2024 | Annual | 1S WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 17, 2024 | Annual | 2P WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 11, 2024 | Annual | 2S WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 11, 2024 | Annual | 3P WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 12, 2024 | Annual | 3S WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 12, 2024 | Annual | 4P WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 12, 2024 | Annual | 4S WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 14, 2024 | Annual | 5P WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 13, 2024 | Annual | 5S WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 13, 2024 | Annual | 6P WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 17, 2024 | Annual | 6S WBT | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 13, 2024 | Annual | APK TANK | Yes | Epoxy | Full Tank | Good | Jan 15, 2015 | Jul 10, 2024 | Annual |
Anodes Fitted: Yes |
|
7.1 |
Ballast Handling Data
Number | Type | Prime mover type | Capacity (m3/hr) | Head (bar) |
---|
1 | Ballast seawater driven | Sea Water | 100 | 30 | 2 | Framo SB 300 | Hydraulic Motor | 750 | 30 |
|
7.2 |
Does the vessel comply with D1 or D2 performance standards? |
D2 |
7.3 |
Does the vessel have a Ballast Water Treatment System (BWTS) fitted? |
Yes |
7.4 |
What type of BWTS fitted? If other system fitted, please advise: |
Chemical, |
7.5 |
Name of manufacturer of BWTS: |
SAMSUNG / PURIMAR |
7.6 |
Does the BWTS have IMO type approval? |
Yes |
7.7 |
Is the BWTS of a USCG approved type? |
Yes |
|
8.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: |
Yes, Solid |
8.2 |
Cargo Tank Capacities at 98% Full - Centre:
Tank Number | Centre | Capacity (m3) |
---|
NONE | 0 | 0.00 |
Total Centre: 0.00 m3
Cargo Tank Capacities at 98% Full - Wing:
Tank Number | Capacity (m3) | P/S |
---|
6 | 4122.50 | Stbd | 1 | 3069.90 | Port | 1 | 3073.10 | Stbd | 2 | 4536.60 | Port | 2 | 4521.30 | Stbd | 3 | 4729.00 | Port | 3 | 4717.40 | Stbd | 4 | 4723.60 | Port | 4 | 4717.50 | Stbd | 5 | 4701.30 | Port | 5 | 4689.90 | Stbd | 6 | 4132.40 | Port |
Total Wing: 51,734.50 m3
Deck Tank Capacities at 98% Full:
Total Deck: m3
|
8.2.1 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
As per Company Policy 98%
Seg No.1 W - 6143.0 cbm
Seg No.2 W - 9057.9 cbm
Seg No.3 W - 9446.4 cbm
Seg No.4 W - 9441.1 cbm
Seg No.5 W - 9391.20 cbm
Seg No.6 W - 8254.90 cbm |
8.2.2 |
IMO class (Oil/Chemical Ship Type 1, 2 or 3): |
IMO 2 (IMO TYPE 2 / 3) |
8.3 |
Slop tank capacities (98%):
Tank Number | Capacity (m3) | P/S |
---|
SLOP | 521.2 | Port | SLOP | 672.9 | Stbd |
Total: 1,194.10 m3
|
8.3.1 |
Specify segregations which slops tanks belong to and their capacity with double valve: |
Seg No.7, Slop wings , 1194.10 cbm |
8.3.2 |
Residual/Retention oil tank(s) capacity (98%), if applicable: |
157.90 m3 |
8.3.3 |
What is total SBT capacity and percentage of SDWT vessel can maintain? |
21,589.10 m3 |
45.96 % |
8.3.4 |
Does vessel meet the requirements of MARPOL Annex I Reg 18.2: |
Yes |
8.4 |
How many grades/products can vessel load/discharge with double valve segregation: |
7 |
8.4.1 |
State type of cargo containment (integral, independent, gravity or pressure tanks): |
|
8.5 |
Max loading rate for homogenous cargo |
With VECS |
Without VECS |
Loaded per manifold connection: |
1,520 m3/hr |
4,050 m3/hr |
Loaded simultaneously through all manifolds: |
4,560 m3/hr |
4,560.00 m3/hr |
8.6 |
Is ship fitted with a Cargo Control Room (CCR)? |
Yes |
8.7 |
Can tank innage / ullage be read from the CCR? |
Yes |
8.8 |
Is gauging system certified and calibrated? If no, specify which ones are not calibrated: |
Yes, N/A |
|
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): |
Closed |
|
What type of fixed closed tank gauging system is fitted: |
Radar Beam |
|
Are high level alarms fitted to the cargo tanks? If Yes, indicate whether to all tanks or partial: |
Yes, Yes |
8.9 |
Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? |
Yes |
8.9.1 |
Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: |
Yes, Tanktech - Fwd, Centre & Aft of each Cargo tank |
8.10 |
Number of portable gauging units (example- MMC) on board: |
3 |
8.11 |
Is a Vapour Emission Control System (VECS) fitted? |
Yes |
|
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? |
Yes |
|
If fitted, how many vapor return segregations can the vessel maintain simultaneously? |
1 |
|
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority |
Yes, Lloyds Register |
8.12 |
Number/size of VECS manifolds (per side): |
2 |
300 mm |
8.13 |
Number / size / type of VECS reducers: |
2 Nos. 300 mm X 400 mm
1 Nos. 300 mm X 200 mm
1 Nos. 300 mm x 150 mm |
8.14 |
State what type of venting system is fitted: |
High velocity vent valve |
8.15 |
Total number/size of cargo manifold connections on each side:
No.: 7
Size:
Manifold | PCS | Size | Unit | Pressure Rating | Unit PR | Standard |
---|
1 | P | 350 | mm | 10 | Bar | ANSI | 1 | S | 350 | mm | 10 | Bar | ANSI | 2 | P | 350 | mm | 10 | Bar | ANSI | 2 | S | 350 | mm | 10 | Bar | ANSI | 3 | P | 350 | mm | 10 | Bar | ANSI | 3 | S | 350 | mm | 10 | Bar | ANSI | 4 | P | 350 | mm | 10 | Bar | ANSI | 4 | S | 350 | mm | 10 | Bar | ANSI | 5 | P | 350 | mm | 10 | Bar | ANSI | 5 | S | 350 | mm | 10 | Bar | ANSI | 6 | P | 350 | mm | 10 | Bar | ANSI | 6 | S | 350 | mm | 10 | Bar | ANSI |
|
8.16 |
What type of valves are fitted at manifold: |
Butterfly, |
8.17 |
What is the material/rating of the manifold: |
STAINLESS STEEL / ANSI |
8.17.1 |
Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? |
Yes |
8.18 |
Distance between cargo manifold centers: |
2,000.00 mm |
8.19 |
Distance ships rail to manifold: |
4,600.00 mm |
8.20 |
Distance manifold to ships side: |
4,600.00 mm |
8.21 |
Top of rail to center of manifold: |
600.00 mm |
8.22 |
Distance main deck to center of manifold: |
2,100.00 mm |
8.23 |
Spill tank grating to center of manifold: |
900.00 mm |
8.24 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
13.548 m |
7.941 m |
8.25 |
Number / size / type of reducers: |
6 x 200/350mm (8/14") 6 x 250/350mm (10/14") 6 x 300/350mm (12/14") 12 x 400/350mm (16/14") 1 x 200/300mm (8/12") ANSI |
8.26 |
Is vessel fitted with a stern manifold? If yes, state size: |
No, 0 mm |
8.27 |
Provide details of Heating Coils/Heat Exchangers |
Tank ID | P/C/S/ Decktank/ Other | Heat exchanger | Internal/External | External ducts | Heating coils | Heating coil sets | Height of the heating coils above tank bottom (mm) | total heating surface (m2) | Ratio of the heating surface | Welded or coupled | Material |
---|
1 | P | no | Internal | no | yes | 2 | 150.00 | 0.22 | 0.01 | Welded | SS | 1 | S | no | Internal | no | yes | 2 | 150.00 | 0.22 | 0.01 | Welded | SS | 2 | P | no | Internal | no | yes | 2 | 150.00 | 0.30 | 0.01 | Welded | SS | 2 | S | no | Internal | no | yes | 2 | 150.00 | 0.30 | 0.01 | Welded | SS | 3 | P | no | Internal | no | yes | 2 | 150.00 | 0.31 | 0.01 | Welded | SS | 3 | S | no | Internal | no | yes | 2 | 150.00 | 0.31 | 0.01 | Welded | SS | 4 | P | no | Internal | no | yes | 2 | 150.00 | 0.31 | 0.01 | Welded | SS | 4 | S | no | Internal | no | yes | 2 | 150.00 | 0.31 | 0.01 | Welded | SS | 5 | P | no | Internal | no | yes | 2 | 150.00 | 31.00 | 0.01 | Welded | SS | 5 | S | no | Internal | no | yes | 2 | 150.00 | 0.31 | 0.01 | Welded | SS | 6 | P | no | Internal | no | yes | 2 | 150.00 | 0.29 | 0.01 | Welded | SS | 6 | S | no | Internal | no | yes | 2 | 150.00 | 0.29 | 0.01 | Welded | SS |
|
8.27.1 |
Is a Thermal Oil Heating system fitted? If yes, identify tanks? |
No, |
8.28 |
Maximum temperature cargo can be loaded / maintained: |
80.0 °C / 176.0 °F |
70 °C / 158 °F |
8.28.1 |
Minimum temperature cargo can be loaded / maintained: |
15.0 °C / 59.0 °F |
15.0 °C / 59.0 °F |
8.29 |
Is an Inert Gas System (IGS) fitted / operational? |
Yes / Yes |
8.29.1 |
Is a Crude Oil Washing (COW) installation fitted / operational? |
Yes / Yes |
8.30 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
IG Generator |
8.30.1 |
If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: |
|
8.31 |
How many cargo pumps can be run simultaneously at full capacity: |
6 |
8.32 |
Cargo Pump Data |
Pump Identity | Pump Location | Type | Type of prime mover | Capacity | At what head? |
---|
COT 1W TO 6W | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | COT Slop W | Cargo Tank | Centrifugal | Hydraulic | 300.00 | 125.00 | ROT | Cargo Tank | Centrifugal | Hydraulic | 100.00 | 125.00 |
|
|
9.1 |
Provide details for Mooring Ropes, Wires, Tails and Shackles |
Type | Location and Identity | Material | Diameter/size | Length | LDBF(100-105 % of SDMBL (Tonnes)) | TDBF(125-130 % of SDMBL (Tonnes) | SWL (tonnes) | WLL (tonnes) (50-55% of Max LDBF) | Certificate No. | Installed Date | Reversed Date | Renewal2 Date | Status of line/tail | Condition of line/tail |
---|
Ropes | FWD LOOSE 2 | POLYESTER & POLYOLEFIN | 56.00 | 220.00 | 67.70 | 0.00 | 67.70 | 37.20 | BUS 1709667/54 | 2019-08-05 | | 2024-08-04 | Spare | Suitable | Ropes | AFT LOOSE 1 | POLYESTER & POLYOLEFIN | 56.00 | 220.00 | 67.70 | 0.00 | 67.70 | 37.20 | BUS 1709667/81 | 2019-08-05 | | 2024-08-04 | Spare | Suitable | Ropes | W2 PORT INNER | POLYPROPYLENE & POLYESTER | 56.00 | 220.00 | 67.70 | 0.00 | 67.70 | 37.20 | HBR19/04-06/01 | 2019-08-15 | 2022-02-02 | 2024-08-15 | In Use | Suitable | Ropes | W1 STBD OUTER | HIGH PERFORMANCE POLYESTER | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | 75309 | 2020-11-13 | 2023-04-17 | 2025-11-13 | In Use | Suitable | Ropes | AFT LOOSE 2 | POLYPROPYLENE & POLYESTER | 56.00 | 220.00 | 67.70 | 0.00 | 67.70 | 37.20 | BUS 1709667/77 | 2019-08-05 | | 2024-08-05 | Spare | Suitable | Ropes | M1 PORT FWD | HIGH PERFORMANCE POLYESTER | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | 75304 | 2020-11-13 | 2023-04-17 | 2025-11-13 | In Use | Suitable | Ropes | M1 PORT AFT | HIGH PERFORMANCE POLYESTER | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | 75311 | 2020-11-13 | 2024-02-17 | 2025-11-13 | In Use | Suitable | Ropes | M2 STBD FWD | HIGH PERFORMANCE POLYESTER | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | 75307 | 2020-11-13 | 2024-02-17 | 2025-11-13 | In Use | Suitable | Ropes | M2 STBD AFT | HIGH PERFORMANCE POLYESTER | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | 75310 | 2020-11-13 | 2024-02-17 | 2025-11-13 | In Use | Suitable | Ropes | M3 STBD FWD | HIGH PERFORMANCE POLYESTER | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | 75308 | 2020-11-13 | 2023-04-17 | 2025-11-13 | In Use | Suitable | Ropes | M3 STBD AFT | HIGH PERFORMANCE POLYESTER | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | 75305 | 2020-11-13 | 2023-04-17 | 2025-11-13 | In Use | Suitable | Ropes | M4 STBD OUTER | POLYESTER & POLYOLEFIN | 60.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | HKT-465-2021-631-02 | 2024-02-17 | | 2029-10-17 | In Use | Suitable | Ropes | M4 STBD CENTER | POLYESTER & POLYOLEFIN | 60.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | HKT-465-2021-631-02 | 2024-01-17 | | 2029-01-17 | In Use | Suitable | Ropes | M4 STBD INNER | POLYESTER & POLYOLEFIN | 60.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | HKT-465-2021-631-02 | 2024-01-17 | | 2029-02-17 | In Use | Suitable | Ropes | M5 PORT INNER | POLYESTER & POLYOLEFIN | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 37.20 | HKT-465-2021-631-02 | 2024-02-17 | | 2029-02-17 | In Use | Suitable | Ropes | M5 PORT CENTER | POLYESTER & POLYOLEFIN | 60.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | HKT-465-2021-631-02 | 2024-02-17 | | 2029-01-17 | In Use | Suitable | Ropes | M5 PORT OUTER | POLYESTER & POLYOLEFIN | 60.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | HKT-465-2021-631-02 | 2024-01-17 | | 2029-02-17 | In Use | Suitable | Ropes | FWD LOOSE 1 | POLYESTER & POLYOLEFIN | 56.00 | 220.00 | 67.70 | 0.00 | 67.70 | 37.20 | BUS 1501761/35 | 2019-08-05 | | 2024-08-05 | Spare | Suitable | Ropes | W2 PORT OUTER | HIGH PERFORMANCE POLYESTER | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | 75306 | 2020-11-13 | 2023-04-17 | 2025-11-13 | In Use | Suitable | Ropes | SPARE 1 | POLYESTER & POLYESTER | 62.00 | 220.00 | 67.00 | 0.00 | 67.00 | 36.85 | 9508d736 | | | | Spare | Suitable | Ropes | W1 STBD INNER | POLYPROPYLENE & POLYESTER | 56.00 | 220.00 | 67.70 | 0.00 | 67.70 | 37.20 | HBR19/04-06/02 | 2019-08-15 | 2022-02-02 | 2024-08-15 | In Use | Suitable |
|
9.2 |
Details of winches and brake testing including rendering loads |
Mooring winch Location | Split Drum | Motive Power | Remote Operational controls | Heaving power | Hauling Speed | Type of Brake | Designed Brake Max holding load (ISO) (80% of SDMB | Operational brake holding load (60% of SDMBL) | Date of last brake test | Brake Rendering load | Frequency of testing brakes |
---|
1 | yes | Hydraulic | yes | 16.00 | 0.25 | Manual | 53.60 | 40.20 | 2023-10-01 | 40.20 | ANNUAL | 2 | yes | Hydraulic | yes | 16.00 | 0.25 | Manual | 53.60 | 40.20 | 2023-10-01 | 40.20 | ANNUAL | 3 | yes | Hydraulic | yes | 16.00 | 0.25 | Manual | 53.60 | 40.20 | 2023-10-01 | 40.20 | ANNUAL | 4 | yes | Hydraulic | yes | 16.00 | 0.25 | Manual | 53.60 | 40.20 | 2023-10-01 | 40.20 | ANNUAL | 5 | yes | Hydraulic | yes | 16.00 | 0.25 | Manual | 53.60 | 40.20 | 2023-10-01 | 40.20 | ANNUAL | 6 | yes | Hydraulic | yes | 16.00 | 0.25 | Manual | 53.60 | 40.20 | 2023-10-01 | 40.20 | ANNUAL | 7 | yes | Hydraulic | yes | 16.00 | 0.25 | Manual | 53.60 | 40.20 | 2023-10-01 | 40.20 | ANNUAL |
|
9.3 |
Provide Details of Mooring bollards and bitts |
Location | Identity No | Certificate Number | Size (mm) | SWL (tonnes) |
---|
Forecastle | 1 | BO-FO1 | 450 | 67 | Forecastle | 2 | BO-FO2 | 450 | 67 | Forecastle | 3 | BO-FO3 | 500 | 92 | Maindeck Forward (Port) | 2 | BO-M02 | 450 | 67 | Maindeck Forward (Port) | 3 | BO-M03 | 450 | 67 | Maindeck Forward (Port) | 4 | BO-M04 | 450 | 67 | Maindeck Forward (Port) | 5 | BO-M05 | 450 | 67 | Maindeck Forward (Port) | 6 | BO-M06 | 500 | 92 | Maindeck Forward (Port) | 7 | BO-M07 | 500 | 92 | Maindeck Forward (Port) | 8 | BO-M08 | 300 | 25 | Poop Deck (Port) | 1 | BO-A01 | 450 | 67 | Poop Deck (Port) | 2 | BO-A02 | 450 | 67 | Poop Deck (Port) | 3 | BO-A03 | 450 | 67 | Poop Deck (Port) | 4 | BO-A04 | 450 | 67 | Maindeck Forward (Port) | 1 | BO-M01 | 450 | 67 |
|
9.4 |
Provide details of Mooring Fairleads/Chocks |
Type | Location | Identity No | Certificate | Size (mm) | SWL (tonnes) | Modifications | If yes, are modifications class approved? |
---|
Closed chock | Forecastle | 1 | CC-F01 | 400 | 67 | no | no | Closed chock | Forecastle | 2 | CC-F02 | 500 | 92 | no | no | Universal roller fairlead | Forecastle | 1 | UR-F01 | 315 | 67 | no | no | Universal roller fairlead | Forecastle | 2 | UR-F02 | 315 | 67 | no | no | Closed chock | Maindeck Forward (Port) | 1 | CC-M01 | 400 | 67 | no | no | Closed chock | Maindeck Forward (Stbd) | 2 | CC-M02 | 400 | 67 | no | no | Closed chock | Maindeck Forward (Port) | 3 | CC-M03 | 400 | 67 | no | no | Closed chock | Maindeck Forward (Stbd) | 4 | CC-M04 | 400 | 67 | no | no | Closed chock | Maindeck Forward (Port) | 5 | CC-M05 | 400 | 67 | no | no | Closed chock | Maindeck Forward (Stbd) | 6 | CC-M06 | 400 | 67 | no | no | Closed chock | Maindeck Forward (Port) | 7 | CC-M07 | 400 | 67 | no | no |
|
9.5 |
Number of shackles on port / starboard cable: |
11.00 / 12.00 |
9.6 |
Type / SWL of Emergency Towing system forward: |
Tongue Type O-SM200F |
204 MT |
9.7 |
Type / SWL of Emergency Towing system aft: |
Reel Type C-SM200A |
204 MT |
9.8 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
1100 x 500 |
9.9 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
204.00 MT |
9.10 |
What is SWL of bollard on poop deck suitable for escort tug: |
204.00 MT |
9.11 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 1 x 10.00 Tonnes Centre |
9.12 |
Accommodation ladder direction: |
Aft |
9.13 |
Does vessel have a portable gangway? If yes, state length: |
Yes |
15.00 m |
9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
Yes |
9.15 |
If fitted, how many chain stoppers: |
1 |
9.16 |
Details of Bow chain stoppers:
Location/Number of Bow Chain Stopper | Type | Operation | SWL | Min Size of Chain | Max size of Chain |
---|
Port | Tongue | Manual | 204.00 | 76.00 | 76.00 |
|
9.17 |
Distance between the bow fairlead and chain stopper/bracket: |
3.00 m |
9.18 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes NA |
|
10.1 |
Speed |
Maximum |
Economical |
Ballast speed: |
Kts (WSNP) (Contact Owners for Details) |
Kts (WSNP) (Contact Owners for Details) |
Laden speed: |
Kts (WSNP) (Contact Owners for Details) |
Kts (WSNP) (Contact Owners for Details) |
10.2 |
What type of fuel is used for main propulsion? If other, then specify: |
Other (specify), VLSFO & LSMGO |
|
What type of fuel is used for generating plant |
VLSFO and LSMGO |
10.3 |
Bunker Tank Capacities:
Tank Name | Bunker Type | Tank Type | Capacity | Max Pressure |
---|
NO 1 H.F.O.T (P) | HFO | Main Bunker Tank | 333.20 | 4.50 | NO 2 H.F.O.T (S) | HFO | Main Bunker Tank | 420.40 | 4.50 | NO 2 H.F.O.T | HFO | Main Bunker Tank | 149.70 | 4.50 | NO 1 LSMGO STOR.(S) | MDO | Main Bunker Tank | 231.00 | 4.50 | NO 2 LSMGO STOR (P) | MDO | Main Bunker Tank | 79.90 | 4.50 | NO 2 LSMGO STOR (S | HFO | Main Bunker Tank | 79.90 | 4.50 |
If other, then specify NA |
10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
10.5 |
Engines |
No |
Capacity |
Make/Type |
Main engine: |
1 |
7,240 Kw |
STX MAN B&W 6S50ME-B9-2 |
Aux engine: |
3 |
900 Kw |
YANMAR - 6EY22ALW |
Power packs: |
4 Sets (2 x Engine Driven & 2 x Electric Driven) |
3.224 m3/hr |
FRAMO Cummins Diesel Engines |
Boilers: |
2 |
18.00 MT/Hr |
SPP Shipbuilding MW-18T & SPP Shipbuilding MC-1.2T |
10.6 |
What is brake horse power of bow thruster (if fitted): |
No, 0 bhp |
10.7 |
What is brake horse power of stern thruster (if fitted): |
No, 0 bhp |
10.8 |
Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: |
Yes, 4.2189 |
|
If No then provide reason: |
|
|
Is the EEDI rating verified by Class, 3rd Party or Owner? |
Class |
10.9 |
Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: |
No, |
|
If No then provide reason: |
|
|
Is the EEXI rating verified by Class, 3rd Party or Owner? |
|
10.10 |
Does the vessel have a CII Rating number? If yes then provide CII rating: |
No, |
|
If No then provide reason: |
|
|
Is the CII rating verified by Class, 3rd Party or Owner? |
|
10.11 |
Does the vessel have an EIV Rating number? If yes then provide EIV rating: |
No, |
|
If No then provide reason: |
|
|
Is the EIV rating verified by Class, 3rd Party or Owner? |
|
10.12 |
What is the ships NOx control level (Tier I, Tier II, and Tier III)?: |
Tier II |
|
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...) |
|
10.13 |
Does the vessel use an Exhaust Gas Cleaning System? |
No |
10.14 |
What is the type of scrubber fitted as part of the EGCS onboard? |
|
|
11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
Yes |
11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
9 m |
11.3 |
Date/place of last STS operation: |
27 May 2024, OPL Malta |
11.4 |
Does the vessel have a ship specific STS plan: |
|
|
12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
12.2 |
Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details: No
|
12.3 |
Date and place of last Port State Control inspection: |
Jul 24, 2024, Lagos |
12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
No Nil Deficiency |
12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |
12.6 |
Date / place of last SIRE inspection: |
Jul 26, 2024 / Nigeria Lagos [NGLOS] |
12.6.1 |
Date / place of last CDI inspection: |
N/A |
12.7 |
Additional information relating to features of the ship or operational characteristics: |
NA |